Evaluation on PWD 75, standard form of general conditions of contract in Sarawak
The General Conditions of Contract, Public Works Department 75 (PWD75) is the most commonly used standard form of condition of contract in the public sector construction projects in Sarawak. PWD 75 currently in use was last revised in May 1961 and there had not been another revision since then. It i...
Saved in:
Main Author: | Sia, Pik Soon |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/385/1/Sia%20PS.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The new payment clauses in the PWD 203/203A (REV. 1/2010) conditions of contract in aligning to CIPAA
by: Ahmad, Hasnita
Published: (2015) -
New Engineering Contract (NEC) 1993 as radical changes to the Malaysian standard forms of contract
by: Chan, Melissa Yuet Li
Published: (2006) -
The superintending officer's duties under JKR Sarawak form of contract PWD 75 (Ver.2006)
by: Engkamat, Frauline
Published: (2009) -
The superintending officer’s duties under JKR Sarawak form of contract PWD 75 (Ver. 2006)
by: Engkamat, Frauline
Published: (2009) -
Breaches of contract in construction industry
by: Yap, Lawrence Sie Kiong
Published: (2009)