Time and cost study on cold-formed steel and reinforced concrete construction - a comparison
Nowadays, the usage of cold-formed steel is quite common in some developed countries especially in building construction. However, in Malaysia, cold-formed steel construction is still considered as a new construction method. In local construction industry, cold-formed steel is only commonly seen in...
محفوظ في:
المؤلف الرئيسي: | Hu, Wei Kiet |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2008
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://ir.unimas.my/id/eprint/596/1/Hu%20Wei.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Flexural effect of flange width variation of ferrocement-cold-formed steel section as a composite beam
بواسطة: Hussain, Ali Saleh Hussain
منشور في: (2014) -
A comparative study of activitybased costing (abc) and time-driven activity-based costing (tdabc) on cost accounting
بواسطة: Nurul Farahin, Zamrud
منشور في: (2021) -
Asset management life cycle costing model for steel manufacturing industry in Saudi Arabia
بواسطة: Mohamed, Mohamed Ibrahim Elnaeim
منشور في: (2021) -
The application of using time-driven activity-based costing in product operation and service operation
بواسطة: Sri Nur Areena, Mohd Zaini
منشور في: (2021) -
Optimisation of the squeeze forming process
بواسطة: Ahmad, Rosli
منشور في: (2006)