Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia

Environmental Management Program (EMP) constitute an important component of the Environmental Impact Assessment (EIA) report of the development projects where the environmental monitoring programs and the environmental compliance auditing (ECA) aspects should be described in detail. ECA requires sys...

Full description

Saved in:
Bibliographic Details
Main Author: Rahman, Md. Mizanur
Format: Thesis
Language:English
English
Published: 2001
Subjects:
Online Access:http://psasir.upm.edu.my/id/eprint/11186/1/FK_2001_67_A.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-upm-ir.11186
record_format uketd_dc
spelling my-upm-ir.111862011-06-21T02:51:33Z Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia 2001-01 Rahman, Md. Mizanur Environmental Management Program (EMP) constitute an important component of the Environmental Impact Assessment (EIA) report of the development projects where the environmental monitoring programs and the environmental compliance auditing (ECA) aspects should be described in detail. ECA requires systematic selection of monitoring variables and analysis of the monitoring database and also requires that a uniform quality standard in auditing be maintained for different types of development projects and different stages of their development. ECA should produce an audit report that is easy to understand and could be used under taking mitigation measures. Presently, in Malaysia, for the EIA projects, there is neither any specific guideline for conducting compliance auditing nor any systematic management of the data generated through monitoring of the projects. The main objective of this study is to develop a knowledge-based environmental compliance auditing system (called ECA-KB) that uses expert's knowledge from different environmental fields and a quantitative technique of evaluating the environmental compliance level of a particular project. ECA-KB comprises of three components namely monitoring database system, compliance auditing model, and knowledge base system. These three component systems have been integrated together to produce concise and comprehensive environmental compliance audit report for the EIA projects. The study provides a tool for the decision-makers and the stakeholders namely the project proponents, environmental consultants, and Department of Environment (DOE) to monitor, evaluate environmental compliance level of the projects, generate compliance audit report, and to keep track on the compliance trend. The great potentiality of the developed ECA-KB is that it is produced in easy interactive and simplified manner that can be run as desktop applications by both the experts and the non-expert users. The system is available in install able CD's and can be reached to the potential users by several ways including distribution of CD's through market channel, demonstration in the seminars, and symposium. 2001-01 Thesis http://psasir.upm.edu.my/id/eprint/11186/ http://psasir.upm.edu.my/id/eprint/11186/1/FK_2001_67_A.pdf application/pdf en public phd doctoral Universiti Putra Malaysia Faculty of Engineering English
institution Universiti Putra Malaysia
collection PSAS Institutional Repository
language English
English
topic


spellingShingle


Rahman, Md. Mizanur
Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
description Environmental Management Program (EMP) constitute an important component of the Environmental Impact Assessment (EIA) report of the development projects where the environmental monitoring programs and the environmental compliance auditing (ECA) aspects should be described in detail. ECA requires systematic selection of monitoring variables and analysis of the monitoring database and also requires that a uniform quality standard in auditing be maintained for different types of development projects and different stages of their development. ECA should produce an audit report that is easy to understand and could be used under taking mitigation measures. Presently, in Malaysia, for the EIA projects, there is neither any specific guideline for conducting compliance auditing nor any systematic management of the data generated through monitoring of the projects. The main objective of this study is to develop a knowledge-based environmental compliance auditing system (called ECA-KB) that uses expert's knowledge from different environmental fields and a quantitative technique of evaluating the environmental compliance level of a particular project. ECA-KB comprises of three components namely monitoring database system, compliance auditing model, and knowledge base system. These three component systems have been integrated together to produce concise and comprehensive environmental compliance audit report for the EIA projects. The study provides a tool for the decision-makers and the stakeholders namely the project proponents, environmental consultants, and Department of Environment (DOE) to monitor, evaluate environmental compliance level of the projects, generate compliance audit report, and to keep track on the compliance trend. The great potentiality of the developed ECA-KB is that it is produced in easy interactive and simplified manner that can be run as desktop applications by both the experts and the non-expert users. The system is available in install able CD's and can be reached to the potential users by several ways including distribution of CD's through market channel, demonstration in the seminars, and symposium.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Rahman, Md. Mizanur
author_facet Rahman, Md. Mizanur
author_sort Rahman, Md. Mizanur
title Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
title_short Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
title_full Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
title_fullStr Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
title_full_unstemmed Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
title_sort development of a knowledge•based compliance auditing system for environmental impact assessment (eia) projects in malaysia
granting_institution Universiti Putra Malaysia
granting_department Faculty of Engineering
publishDate 2001
url http://psasir.upm.edu.my/id/eprint/11186/1/FK_2001_67_A.pdf
_version_ 1747811218243977216