Cost Control Strategies For Ibs Contractors In Malaysia
Industrialised Building System (IBS) is a system widely used in construction industry in Malaysia. This study is a survey to identify the factors contributing to cost control problems faced by local contractors in IBS projects and to identify the strategies used to reduce the cost variation in IB...
Saved in:
Main Author: | Lew, Yoke Lian |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2002
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/12077/1/FK_2002_42.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Determining the relationship between cost of control and project management success in building construction /
by: Al-Tmeemy, Samiaah M. Hassen
Published: (2011) -
Design science research as an approach to develop conceptual solutions for improving cost management in construction /
by: Mahanim Hanid
Published: (2014) -
Application of cost significance technique to time and cost control of construction projects /
by: Sin, Wai Meng
Published: (1995) -
Improving cost and time control in Malaysian construction industry using building information modelling
by: Muhammad, Muhammad Tahir
Published: (2017) -
Building Cost Comparison Between Conventional And Some Selected Industrialised Building Systems
by: Hj.Haron, Nuzul Azam
Published: (2002)