Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management
Approach of Crashing Critical Activities (CCA) was originally developed along with the Critical Path Method (CPM) for planning and controlling large scale projects in the late 50s. The objective of crashing critical activities in CPM is to find which activities should be crashed with the use of addi...
Saved in:
Main Author: | Khalaf, Wakas S. |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2010
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/19685/1/IPM_2010_6_F.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of CPM in the construction industry /
by: Oh, Boon Yew
Published: (1996) -
Traffic Balancing Method in Shortest Path Routing
by: Mohamed Abdulqader, Makarem
Published: (2007) -
Application of CPM to telephone switching equipment installation /
by: Ho, Fah Siang
Published: (1976) -
A genetic algorithm solution to the shortest path problem in OSPF and MPLS /
by: Tee, Wee Jing
Published: (2002) -
Dimensioning performance estimation of the airline industry : path-analysis based modelling /
by: Jenatabadi, Hashem Salarzadeh
Published: (2013)