Development of a heuristic procedure for balancing mixed-model parallel assembly line type II

The single-model assembly line is not efficient for today’s competitive industry because to respond the customer’s expectation, companies need to produce mixedmodel products. On the other hand, using the mixed-model products increases the assembly complexity and makes it difficult to assign tasks t...

Full description

Saved in:
Bibliographic Details
Main Author: Esmaeilian, Gholamreza
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://psasir.upm.edu.my/id/eprint/40748/1/FK%202010%2014%20IR.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-upm-ir.40748
record_format uketd_dc
spelling my-upm-ir.407482015-09-28T09:15:19Z Development of a heuristic procedure for balancing mixed-model parallel assembly line type II 2010-02 Esmaeilian, Gholamreza The single-model assembly line is not efficient for today’s competitive industry because to respond the customer’s expectation, companies need to produce mixedmodel products. On the other hand, using the mixed-model products increases the assembly complexity and makes it difficult to assign tasks to workstations because of the variety in model characteristics. As a result, the mixed-model products suffer from delays, limitations in the line workflow and longer lines. Parallel assembly lines as a production system in ALBPs which consists of a number of assembly lines in a parallel status, which by considering the cycle time of each line certain products are manufactured. This thesis takes advantages of the parallel assembly lines to produce mixed-model in order to assemble more than one model in each parallel assembly line and allocating tasks of models to workstations and balancing each parallel line to reduce the cycle times. To solve these problems, two heuristic algorithms were developed and coded in MATLAB®. The first one allocates each model to only one parallel assembly line and achieves the initial arrangement of tasks with the minimum number of workstations for each line. The second one called Tabu search Mixed-Model Parallel Assembly Line Balancing (TMMPALB), calculates final balancing tasks of different model in parallel lines with optimum cycle time for each line which tasks of each model can be allocated to more than one parallel assembly line through the TMMPALB. The main advantages of employing TS are using a flexible memory structure during the search process, and intensification and diversification strategies, which help to make a comprehensive search in the solution space. Fourteen data sets create 81 test problems that were solved to validate the performance of the TMMPALB. Each test problem consisted of the number of tasks, process time for each task (time unit), and the precedence relationship, minimum number of station and cycle time for each model. By considering that 80 out of the 81 test problems include three models and the remaining one has four models, 244 cycle times is made, which TMMPALB tries to minimize. The computational results showed that 205 cycle times out of the 244 cycle times have been improved. These results demonstrated that by arranging mixed-model through the parallel assembly lines with minimum number of workstations, the minimum cycle times are achieved in comparing with the single line. Assembly-line methods - Data processing Fuzzy sets Electronic data processing 2010-02 Thesis http://psasir.upm.edu.my/id/eprint/40748/ http://psasir.upm.edu.my/id/eprint/40748/1/FK%202010%2014%20IR.pdf application/pdf en public phd doctoral Universiti Putra Malaysia Assembly-line methods - Data processing Fuzzy sets Electronic data processing
institution Universiti Putra Malaysia
collection PSAS Institutional Repository
language English
topic Assembly-line methods - Data processing
Fuzzy sets
Electronic data processing
spellingShingle Assembly-line methods - Data processing
Fuzzy sets
Electronic data processing
Esmaeilian, Gholamreza
Development of a heuristic procedure for balancing mixed-model parallel assembly line type II
description The single-model assembly line is not efficient for today’s competitive industry because to respond the customer’s expectation, companies need to produce mixedmodel products. On the other hand, using the mixed-model products increases the assembly complexity and makes it difficult to assign tasks to workstations because of the variety in model characteristics. As a result, the mixed-model products suffer from delays, limitations in the line workflow and longer lines. Parallel assembly lines as a production system in ALBPs which consists of a number of assembly lines in a parallel status, which by considering the cycle time of each line certain products are manufactured. This thesis takes advantages of the parallel assembly lines to produce mixed-model in order to assemble more than one model in each parallel assembly line and allocating tasks of models to workstations and balancing each parallel line to reduce the cycle times. To solve these problems, two heuristic algorithms were developed and coded in MATLAB®. The first one allocates each model to only one parallel assembly line and achieves the initial arrangement of tasks with the minimum number of workstations for each line. The second one called Tabu search Mixed-Model Parallel Assembly Line Balancing (TMMPALB), calculates final balancing tasks of different model in parallel lines with optimum cycle time for each line which tasks of each model can be allocated to more than one parallel assembly line through the TMMPALB. The main advantages of employing TS are using a flexible memory structure during the search process, and intensification and diversification strategies, which help to make a comprehensive search in the solution space. Fourteen data sets create 81 test problems that were solved to validate the performance of the TMMPALB. Each test problem consisted of the number of tasks, process time for each task (time unit), and the precedence relationship, minimum number of station and cycle time for each model. By considering that 80 out of the 81 test problems include three models and the remaining one has four models, 244 cycle times is made, which TMMPALB tries to minimize. The computational results showed that 205 cycle times out of the 244 cycle times have been improved. These results demonstrated that by arranging mixed-model through the parallel assembly lines with minimum number of workstations, the minimum cycle times are achieved in comparing with the single line.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Esmaeilian, Gholamreza
author_facet Esmaeilian, Gholamreza
author_sort Esmaeilian, Gholamreza
title Development of a heuristic procedure for balancing mixed-model parallel assembly line type II
title_short Development of a heuristic procedure for balancing mixed-model parallel assembly line type II
title_full Development of a heuristic procedure for balancing mixed-model parallel assembly line type II
title_fullStr Development of a heuristic procedure for balancing mixed-model parallel assembly line type II
title_full_unstemmed Development of a heuristic procedure for balancing mixed-model parallel assembly line type II
title_sort development of a heuristic procedure for balancing mixed-model parallel assembly line type ii
granting_institution Universiti Putra Malaysia
publishDate 2010
url http://psasir.upm.edu.my/id/eprint/40748/1/FK%202010%2014%20IR.pdf
_version_ 1747811842264137728