Risk Analysis of Housing Projects in Malaysia Using an Industrialised Building System
The use of industrialised building system (IBS) has attracted many countries like Singapore, Sweden, Germany, and Japan. This system can replace the conventional building system that uses labour intensive force. However, although this system has been used since 1964, its acceptance in Malaysia am...
Saved in:
Main Author: | Abu Hasan Sazalli, Saiful Azri |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/5406/1/FK_2008_35.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A software tool for scheduling risk analysis /
by: Alhazaimeh, Ayham Mohammad Ahmad
Published: (2012) -
A comprehensive method for evaluating and reducing risk factors for project implementation
by: Al-Adwani, Bader M. S. M.
Published: (2019) -
Assessment of heavy metal contamination in water and sediments of Bertam River in Cameron Highlands and its association with ecological and health risks
by: Razali, Azlini
Published: (2019) -
Hazard identification and assessing risk factors impacting tower erection projects in Tenaga Nasional Berhad (TNB) /
by: Nur Hafiza Hamdan -
Quantitative risk assessment for hazardous material storage in a process plant /
by: Baesi, Shahabaldin
Published: (2011)