Development of integrated criteria for selection and monitoring of subcontractors in Malaysia
Subcontracting practice has become a norm in current construction industry. A performance of construction work is strongly dependant on subcontractors. Problems arising from subcontracting may cause vast influence to the construction project, and may affect the operation of the general contractor’s...
Saved in:
主要作者: | Lew, Yoke Lian |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2017
|
主题: | |
在线阅读: | http://psasir.upm.edu.my/id/eprint/69991/1/FK%202017%2090%20-%20IR.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Pelaksanaan penempatan guru mengikut tugas dan kepuasan kerja di sekolah menengah kebangsaan Malaysia /
由: Jafri Abu -
Criteria used by Singapore developers to select architects /
由: Lee, Kum Cheong
出版: (1996) -
Amalan pengambilan dan pemilihan sumber manusia menurut perspektif Islam : kajian pelaksanaan di UiTM Cawangan Pahang /
由: Nor Ain Arshad
出版: (2017) -
Familiness and CEO Selection Process: Case Studies of Malaysian Small Family Businesses
由: Nadiah binti Mahmad Nasir -
Persepsi guru tentang sistem pertukaran sekolah antara bahagian di Sarawak /
由: Fatimah Nancy Saini
出版: (2000)