Labour Productivity Measurement Method for Malaysian Housing Industry
The industrialised building system (IBS) was introduced in Malaysia in 1966, but it failed to establish itself though there is a sustained large market for residential projects. One of the main reasons behind this failure is a lack of scientific data on labour productivity in the construction ind...
Saved in:
主要作者: | Lee, Wah Peng |
---|---|
格式: | Thesis |
語言: | English English |
出版: |
2005
|
主題: | |
在線閱讀: | http://psasir.upm.edu.my/id/eprint/7078/1/FK_2005_41%28a%29.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Factors affecting labour productivity, skilled labour and return to education in Malaysia
由: Mohamad Yunus, Norhanishah
出版: (2014) -
Skills and occupational mismatch in Malaysian labour market
由: Jamaludin, Salwaty
出版: (2021) -
Labour productivity of the Malaysian manufacturing sector /
由: Wan Liyana Mariah Wan Zainal Abidin
出版: (2003) -
Value Addition and Labour Productivity in the Malaysian Furniture Industry Between 1986 and 2004
由: Chong, Yen Yoon
出版: (2009) -
Usable and Accessible Design Features in Malaysian Houses for the Independent Aged
由: Mansor, Noranita
出版: (2008)