APA引文

Yap, A. K. (2008). Reducing Production Lead Time Through Value Stream Mapping Approach.

Chicago Style (17th ed.) Citation

Yap, Ai Kin. Reducing Production Lead Time Through Value Stream Mapping Approach. 2008.

MLA引文

Yap, Ai Kin. Reducing Production Lead Time Through Value Stream Mapping Approach. 2008.

警告:這些引文格式不一定是100%准確.