Yap, A. K. (2008). Reducing Production Lead Time Through Value Stream Mapping Approach.
Chicago Style (17th ed.) CitationYap, Ai Kin. Reducing Production Lead Time Through Value Stream Mapping Approach. 2008.
MLA引文Yap, Ai Kin. Reducing Production Lead Time Through Value Stream Mapping Approach. 2008.
警告:这些引文格式不一定是100%准确.