Development of high damping rubber joint for precast beam-column connection under cyclic loads
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/92353/1/FK%202019%2038_.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-upm-ir.92353 |
---|---|
record_format |
uketd_dc |
spelling |
my-upm-ir.923532022-06-15T01:55:11Z Development of high damping rubber joint for precast beam-column connection under cyclic loads 2018-09 Woon, Kai Siong Precast concrete - Building Concrete beam Damping (Mechanics) 2018-09 Thesis http://psasir.upm.edu.my/id/eprint/92353/ http://psasir.upm.edu.my/id/eprint/92353/1/FK%202019%2038_.pdf text en public doctoral Universiti Putra Malaysia Precast concrete - Building Concrete beam Damping (Mechanics) Hejazi, Farzad |
institution |
Universiti Putra Malaysia |
collection |
PSAS Institutional Repository |
language |
English |
advisor |
Hejazi, Farzad |
topic |
Precast concrete - Building Concrete beam Damping (Mechanics) |
spellingShingle |
Precast concrete - Building Concrete beam Damping (Mechanics) Woon, Kai Siong Development of high damping rubber joint for precast beam-column connection under cyclic loads |
description |
|
format |
Thesis |
qualification_level |
Doctorate |
author |
Woon, Kai Siong |
author_facet |
Woon, Kai Siong |
author_sort |
Woon, Kai Siong |
title |
Development of high damping rubber joint for precast beam-column connection under cyclic loads |
title_short |
Development of high damping rubber joint for precast beam-column connection under cyclic loads |
title_full |
Development of high damping rubber joint for precast beam-column connection under cyclic loads |
title_fullStr |
Development of high damping rubber joint for precast beam-column connection under cyclic loads |
title_full_unstemmed |
Development of high damping rubber joint for precast beam-column connection under cyclic loads |
title_sort |
development of high damping rubber joint for precast beam-column connection under cyclic loads |
granting_institution |
Universiti Putra Malaysia |
publishDate |
2018 |
url |
http://psasir.upm.edu.my/id/eprint/92353/1/FK%202019%2038_.pdf |
_version_ |
1747813730318548992 |