Zainudin, F. A. (2021). Alternative dispute resolution as feasible resolution for construction disputes from the perspective of CIDB G7 contractors.
Chicago Style (17th ed.) CitationZainudin, Farah Ain. Alternative Dispute Resolution as Feasible Resolution for Construction Disputes from the Perspective of CIDB G7 Contractors. 2021.
MLA (8th ed.) CitationZainudin, Farah Ain. Alternative Dispute Resolution as Feasible Resolution for Construction Disputes from the Perspective of CIDB G7 Contractors. 2021.
Warning: These citations may not always be 100% accurate.