Zainudin, F. A. (2021). Alternative dispute resolution as feasible resolution for construction disputes from the perspective of CIDB G7 contractors.
توثيق أسلوب شيكاغو (الطبعة السابعة عشر)Zainudin, Farah Ain. Alternative Dispute Resolution as Feasible Resolution for Construction Disputes from the Perspective of CIDB G7 Contractors. 2021.
توثيق جمعية اللغة المعاصرة MLA (الطبعة الثامنة)Zainudin, Farah Ain. Alternative Dispute Resolution as Feasible Resolution for Construction Disputes from the Perspective of CIDB G7 Contractors. 2021.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.