APA引文

Zainudin, F. A. (2021). Alternative dispute resolution as feasible resolution for construction disputes from the perspective of CIDB G7 contractors.

Chicago Style (17th ed.) Citation

Zainudin, Farah Ain. Alternative Dispute Resolution as Feasible Resolution for Construction Disputes from the Perspective of CIDB G7 Contractors. 2021.

MLA引文

Zainudin, Farah Ain. Alternative Dispute Resolution as Feasible Resolution for Construction Disputes from the Perspective of CIDB G7 Contractors. 2021.

警告:这些引文格式不一定是100%准确.