The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia
In emerging economies, Public Private Partnership (PPP) is a popular mechanism for the governments to meet the increasing national demand for the development of infrastructure, and provision of services and facilities such as expressways, ports and healthcare. Malaysia acknowledges the potential of...
Saved in:
id |
my-usim-ddms-12978 |
---|---|
record_format |
uketd_dc |
institution |
Universiti Sains Islam Malaysia |
collection |
USIM Institutional Repository |
language |
en_US |
topic |
Public Private Partnership toll |
spellingShingle |
Public Private Partnership toll Syaromi Ramli The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia |
description |
In emerging economies, Public Private Partnership (PPP) is a popular mechanism for the governments to meet the increasing national demand for the development of infrastructure, and provision of services and facilities such as expressways, ports and healthcare. Malaysia acknowledges the potential of PPP in delivering high-quality infrastructure and services to the general public. However, active involvement of the private sector in PPP toll expressway projects also presents a significant challenge to the government’s sustainable development programme and its inspiration to formulate a winning engagement with the private sector as the front runner and main engine of growth for the country’s economy. Many studies have been reported on PPP but very few on the influencing factors that affect the behavioural intentions and actions among the decision-makers in the private sector to participate in PPP, particularly in toll expressway projects. To bridge this gap, two (2) theoretical models, namely the Social Exchange Theory (SET) and Theory of Planned Behaviour (TPB) have been tested as the foundation to study and explain the characteristics of the empirical data collected from the decision-makers of toll concessionaires’ companies. A total of 352 practitioners and professionals (who were decision makers from the top and middle management) from twenty-six (26) toll concessionaire companies were sampled (using a stratified random sampling process). In the initial theoretical model, a total of eight (8) constructs were proposed and examined, namely; (a) attitude on PPP, (b) subjective norms, (c) perceived behavioural control, (d) governmental influence, (e) project viability, (f) behavioural intention of the decision makers, (g) involvement behaviour and (h) trust as the moderating factor. Questionnaires on all the eight constructs were developed, adopted and adapted from various authors. Data were analysed and hypotheses tested using SPSS 23.0 and AMOS 23.0 approaches of structural equation modelling (SEM). The results revealed that attitude (a), perceived behaviour control (c) and governmental influence (d) are factors that influence behavioural intention, and that the latter had impacts on involvement. The results also show that trust (h) is a moderator in the relationship between behavioural intention and involvement. Meanwhile the factors subjective norm (b) and project viability (f) did not influence behavioural intention. Overall, this study offers three segment findings with regard to PPP toll expressway projects namely: a comprehensive view of the challenges they faced, the influencing factors for decision-makers’ intention to get involved, and the exploration of trust as an intensifying effect towards their involvement. Thus, these could provide inputs towards enhancing the current PPP policy and its governance mechanism, while encouraging the participation of the private sector to be the front-runner and engine of growth for the economy. |
format |
Thesis |
author |
Syaromi Ramli |
author_facet |
Syaromi Ramli |
author_sort |
Syaromi Ramli |
title |
The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia |
title_short |
The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia |
title_full |
The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia |
title_fullStr |
The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia |
title_full_unstemmed |
The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia |
title_sort |
influencing factors of decision makers’ behavioural into involvement in public-private partnership (ppp) toll expressway projects in malaysia |
granting_institution |
Universiti Sains Islam Malaysia |
url |
https://oarep.usim.edu.my/bitstreams/be07ee21-cb00-4edf-bb1e-9a309a05a8d2/download https://oarep.usim.edu.my/bitstreams/88462bf4-82bf-4cc1-abb8-3df0f60b01a8/download https://oarep.usim.edu.my/bitstreams/f588a1ae-6d39-4480-bf54-efffe2a181aa/download https://oarep.usim.edu.my/bitstreams/198ed3ff-b347-4f76-9fa1-f3a326bf16f5/download https://oarep.usim.edu.my/bitstreams/fa8d16f5-a970-4f47-8193-ae654c05f878/download https://oarep.usim.edu.my/bitstreams/b49aec0e-272c-4130-b7ec-dcb42fd87b50/download https://oarep.usim.edu.my/bitstreams/aa1ceb34-8f15-4217-9549-8c8f4796b1e1/download https://oarep.usim.edu.my/bitstreams/0efaf392-ac5f-4fba-92c1-a46b5c15e8be/download https://oarep.usim.edu.my/bitstreams/70b6ff01-0dd9-4edc-b9fe-b281ed521ef9/download |
_version_ |
1812444664981094400 |
spelling |
my-usim-ddms-129782024-05-29T18:09:46Z The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia Syaromi Ramli In emerging economies, Public Private Partnership (PPP) is a popular mechanism for the governments to meet the increasing national demand for the development of infrastructure, and provision of services and facilities such as expressways, ports and healthcare. Malaysia acknowledges the potential of PPP in delivering high-quality infrastructure and services to the general public. However, active involvement of the private sector in PPP toll expressway projects also presents a significant challenge to the government’s sustainable development programme and its inspiration to formulate a winning engagement with the private sector as the front runner and main engine of growth for the country’s economy. Many studies have been reported on PPP but very few on the influencing factors that affect the behavioural intentions and actions among the decision-makers in the private sector to participate in PPP, particularly in toll expressway projects. To bridge this gap, two (2) theoretical models, namely the Social Exchange Theory (SET) and Theory of Planned Behaviour (TPB) have been tested as the foundation to study and explain the characteristics of the empirical data collected from the decision-makers of toll concessionaires’ companies. A total of 352 practitioners and professionals (who were decision makers from the top and middle management) from twenty-six (26) toll concessionaire companies were sampled (using a stratified random sampling process). In the initial theoretical model, a total of eight (8) constructs were proposed and examined, namely; (a) attitude on PPP, (b) subjective norms, (c) perceived behavioural control, (d) governmental influence, (e) project viability, (f) behavioural intention of the decision makers, (g) involvement behaviour and (h) trust as the moderating factor. Questionnaires on all the eight constructs were developed, adopted and adapted from various authors. Data were analysed and hypotheses tested using SPSS 23.0 and AMOS 23.0 approaches of structural equation modelling (SEM). The results revealed that attitude (a), perceived behaviour control (c) and governmental influence (d) are factors that influence behavioural intention, and that the latter had impacts on involvement. The results also show that trust (h) is a moderator in the relationship between behavioural intention and involvement. Meanwhile the factors subjective norm (b) and project viability (f) did not influence behavioural intention. Overall, this study offers three segment findings with regard to PPP toll expressway projects namely: a comprehensive view of the challenges they faced, the influencing factors for decision-makers’ intention to get involved, and the exploration of trust as an intensifying effect towards their involvement. Thus, these could provide inputs towards enhancing the current PPP policy and its governance mechanism, while encouraging the participation of the private sector to be the front-runner and engine of growth for the economy. Universiti Sains Islam Malaysia 2021-01 Thesis en_US https://oarep.usim.edu.my/handle/123456789/12978 https://oarep.usim.edu.my/bitstreams/37f20854-585d-49ef-bad0-260dae1179b9/download 8a4605be74aa9ea9d79846c1fba20a33 https://oarep.usim.edu.my/bitstreams/be07ee21-cb00-4edf-bb1e-9a309a05a8d2/download 08cece23ce6334cae5b75d17dc2b034d https://oarep.usim.edu.my/bitstreams/88462bf4-82bf-4cc1-abb8-3df0f60b01a8/download 3ae708e3edcf3ebd3532afd5a4fd9fdf https://oarep.usim.edu.my/bitstreams/f588a1ae-6d39-4480-bf54-efffe2a181aa/download a07dbbbb229d1657d677cec2a4bc862b https://oarep.usim.edu.my/bitstreams/198ed3ff-b347-4f76-9fa1-f3a326bf16f5/download 0ccb66e2aef25698b0c628d321194b08 https://oarep.usim.edu.my/bitstreams/fa8d16f5-a970-4f47-8193-ae654c05f878/download f85c937da37304012314869205c04d7d https://oarep.usim.edu.my/bitstreams/b49aec0e-272c-4130-b7ec-dcb42fd87b50/download 09eb270fe1aa279eae7ac6c79be32279 https://oarep.usim.edu.my/bitstreams/aa1ceb34-8f15-4217-9549-8c8f4796b1e1/download 932ff7cbb4fb06cb13aaf29700cb7e3a https://oarep.usim.edu.my/bitstreams/0efaf392-ac5f-4fba-92c1-a46b5c15e8be/download 1f1b4da8421886333e000db0018db740 https://oarep.usim.edu.my/bitstreams/70b6ff01-0dd9-4edc-b9fe-b281ed521ef9/download 805c0c1bba4a706c5c31ba1927899c2c https://oarep.usim.edu.my/bitstreams/1ede0a01-14d1-4da4-8d79-25d2f27e7494/download 68b329da9893e34099c7d8ad5cb9c940 https://oarep.usim.edu.my/bitstreams/d0fe43fc-d41a-4693-a3f2-261f63758aef/download 4043756e6b8ec00a2797be53fe6af63c https://oarep.usim.edu.my/bitstreams/7a3facb4-674d-40e5-85c6-692aca4f22ff/download 72aac74c1d3a492c598635d7c88cd2d8 https://oarep.usim.edu.my/bitstreams/aded4933-d341-40bc-bae4-5f7b7e2994d1/download e4337c26bff8414d37ba6e0a4b5a6771 https://oarep.usim.edu.my/bitstreams/c6dc7ec4-8035-4006-a693-1bb4b8ebb29e/download a9877f2a73cb48e1d88134b7de888d71 https://oarep.usim.edu.my/bitstreams/7f4de03d-0f01-4b17-979c-a844bfe15a94/download 6e2813e989f9b89250d6d3bdfaf72758 https://oarep.usim.edu.my/bitstreams/2ab237c4-4706-42ca-88ff-6985ec7eea69/download 23dd5a0e74786d814d7ffad98a704a9b https://oarep.usim.edu.my/bitstreams/88a34371-f314-4e13-b8ee-47d14a41106d/download c7a3d3ff255934a2f3a7b8c6466e49ba https://oarep.usim.edu.my/bitstreams/0e7d8568-0b67-4a89-9a18-8d618f2624a9/download a41cb4ddee6323e1fe6a92675566083f Public Private Partnership, toll |