A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships

Currently, the planning arId scheduling of Royal Malaysian Navy (RMN) ships for preventive maintenance routine, i.e. Slipping, DED and Refit at shipyard, is done based on the existing policy cycle which has the constraint that a maximum of 1/3 of the total number of ships could undergo maintenan...

Full description

Saved in:
Bibliographic Details
Main Author: Abd. Halim, Mahamud Sayuti
Format: Thesis
Language:English
Published: 1993
Subjects:
Online Access:http://eprints.usm.my/30643/1/MAHAMUD_SAYUTI_ABD._HALIM.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-usm-ep.30643
record_format uketd_dc
spelling my-usm-ep.306432016-10-04T02:55:49Z A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships 1993-12 Abd. Halim, Mahamud Sayuti QA1 Mathematics (General) Currently, the planning arId scheduling of Royal Malaysian Navy (RMN) ships for preventive maintenance routine, i.e. Slipping, DED and Refit at shipyard, is done based on the existing policy cycle which has the constraint that a maximum of 1/3 of the total number of ships could undergo maintenance routine at shipyard at anyone time. Unfortunately in actual practice, i. e. the actual time taken to go through the cycle is usually more than that of the existing policy cycle due to various reasons. As a result of this, RMN run into difficulties in the planning and scheduling of ships for preventive maintenance routine as well as operational requirement. Pada masa inl perancangan dan pengskedulan kapal-kapal Tentera Laut Di Raja Malaysia (TLDM) untuk rutin penyenggaraan cegahan, iaitu Slipping, DED dan Refit di limbungan, dilakukan dengan berpandukan kepada ki tar polisi yang sedia ada yang mana mempunyai kekangan iai tu maksimum 1/3 daripada jumlah kapal boleh menjalani rutin senggaraan di limbumgan pada sesuatu ketika. Tetapi pad a hakikat perlaksanaannya, iai tu masa sebenar yang diambil untuk rnenjalani satu ki tar selalunya lebih daripada kitar polisi yang sedia ada oleh kerana pelbagai sebab. Dleh yang dernikian, TLDM rnenghadapi m~salah membua t perancangan dan pengskedulan kapal-kapal untuk rutin senggaraan berjadual dan juga keperluan operasi. 1993-12 Thesis http://eprints.usm.my/30643/ http://eprints.usm.my/30643/1/MAHAMUD_SAYUTI_ABD._HALIM.pdf application/pdf en public masters Universiti Sains Malaysia Pusat Pengajian Sains Matematik
institution Universiti Sains Malaysia
collection USM Institutional Repository
language English
topic QA1 Mathematics (General)
spellingShingle QA1 Mathematics (General)
Abd. Halim, Mahamud Sayuti
A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
description Currently, the planning arId scheduling of Royal Malaysian Navy (RMN) ships for preventive maintenance routine, i.e. Slipping, DED and Refit at shipyard, is done based on the existing policy cycle which has the constraint that a maximum of 1/3 of the total number of ships could undergo maintenance routine at shipyard at anyone time. Unfortunately in actual practice, i. e. the actual time taken to go through the cycle is usually more than that of the existing policy cycle due to various reasons. As a result of this, RMN run into difficulties in the planning and scheduling of ships for preventive maintenance routine as well as operational requirement. Pada masa inl perancangan dan pengskedulan kapal-kapal Tentera Laut Di Raja Malaysia (TLDM) untuk rutin penyenggaraan cegahan, iaitu Slipping, DED dan Refit di limbungan, dilakukan dengan berpandukan kepada ki tar polisi yang sedia ada yang mana mempunyai kekangan iai tu maksimum 1/3 daripada jumlah kapal boleh menjalani rutin senggaraan di limbumgan pada sesuatu ketika. Tetapi pad a hakikat perlaksanaannya, iai tu masa sebenar yang diambil untuk rnenjalani satu ki tar selalunya lebih daripada kitar polisi yang sedia ada oleh kerana pelbagai sebab. Dleh yang dernikian, TLDM rnenghadapi m~salah membua t perancangan dan pengskedulan kapal-kapal untuk rutin senggaraan berjadual dan juga keperluan operasi.
format Thesis
qualification_level Master's degree
author Abd. Halim, Mahamud Sayuti
author_facet Abd. Halim, Mahamud Sayuti
author_sort Abd. Halim, Mahamud Sayuti
title A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
title_short A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
title_full A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
title_fullStr A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
title_full_unstemmed A Simulation Model Of The Maintenance Cycle Of Royal Malaysian Navy Ships
title_sort simulation model of the maintenance cycle of royal malaysian navy ships
granting_institution Universiti Sains Malaysia
granting_department Pusat Pengajian Sains Matematik
publishDate 1993
url http://eprints.usm.my/30643/1/MAHAMUD_SAYUTI_ABD._HALIM.pdf
_version_ 1747820375528439808