Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. A...
Saved in:
Main Author: | Bahaudin, Ahmad Yusni |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Utilisation Of Wood Ash As Alkaline Activator For Ambient Cured Geopolymer Concrete
by: Samsudin, Muhammad Hasnolhadi
Published: (2020) -
The Utilisation Of Wood Ash As Alkaline Activator For Ambient Cured Geopolymer Concrete
by: Samsudin, Muhammad Hasnolhadi
Published: (2020) -
Natural And Mechanical Security Attributes For House Break-In Prevention In Penang Hotspots
by: Seifi, Molood
Published: (2019) -
Factors Affecting Building Security Cost In Nigerian Urban Environment
by: Anifowose , Opeyemi Maroof
Published: (2016) -
Relationship Between Cost Factors And Performance Of Small Scale Local Government Contractors In Nigeria
by: Gambo, Nuru
Published: (2016)