Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. A...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!