Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies

To understand the success and failure of knowledge management (KM), KM capabilities must be identified and assessed. Literature has offered theoretical grounding with regard to organizational capabilities as predictor of KM performance. In order to make KM more effective this study attempts to integ...

Full description

Saved in:
Bibliographic Details
Main Author: Tufail, Muhammad Asim
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.usm.my/44458/1/M%20Asim%20Tufail%20-24.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-usm-ep.44458
record_format uketd_dc
spelling my-usm-ep.444582019-05-30T04:36:38Z Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies 2013-08 Tufail, Muhammad Asim TH1-9745 Building construction To understand the success and failure of knowledge management (KM), KM capabilities must be identified and assessed. Literature has offered theoretical grounding with regard to organizational capabilities as predictor of KM performance. In order to make KM more effective this study attempts to integrate the fragmented KM perspectives into the holistic framework including, knowledge infrastructure capability (technology, structure, and culture) and knowledge process capability (acquisition, conversion, application, and protection), based on Gold's (2001) study and project performance from the standpoint of time, cost, quality and safety in addition to project benefits. To bridge the gap between theory and practice, this study aligns unit of analysis more closely with the practitioners’ level of implementation by selecting project based organization (PBO), namely construction organization as population. The sample of 85 useable respondents was collected through Cohen’s (1988) statistical power and sample size conventions, from G7 Companies listed with CIDB. The regression analysis was conducted through partial least squares structural equation modelling using SmartPlS© software. The results of this study indicated that there is a positive relationship between effective KM and performance. The results of this study are valuable in establishing a valid and reliable survey instrument for construction companies, as well as in providing strong evidence that KM capabilities are essential to improving performance. It also recommends direction for future related studies. 2013-08 Thesis http://eprints.usm.my/44458/ http://eprints.usm.my/44458/1/M%20Asim%20Tufail%20-24.pdf application/pdf en public masters Universiti Sains Malaysia Pusat Pengajian Perumahan Bangunan Dan Perancangan
institution Universiti Sains Malaysia
collection USM Institutional Repository
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Tufail, Muhammad Asim
Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
description To understand the success and failure of knowledge management (KM), KM capabilities must be identified and assessed. Literature has offered theoretical grounding with regard to organizational capabilities as predictor of KM performance. In order to make KM more effective this study attempts to integrate the fragmented KM perspectives into the holistic framework including, knowledge infrastructure capability (technology, structure, and culture) and knowledge process capability (acquisition, conversion, application, and protection), based on Gold's (2001) study and project performance from the standpoint of time, cost, quality and safety in addition to project benefits. To bridge the gap between theory and practice, this study aligns unit of analysis more closely with the practitioners’ level of implementation by selecting project based organization (PBO), namely construction organization as population. The sample of 85 useable respondents was collected through Cohen’s (1988) statistical power and sample size conventions, from G7 Companies listed with CIDB. The regression analysis was conducted through partial least squares structural equation modelling using SmartPlS© software. The results of this study indicated that there is a positive relationship between effective KM and performance. The results of this study are valuable in establishing a valid and reliable survey instrument for construction companies, as well as in providing strong evidence that KM capabilities are essential to improving performance. It also recommends direction for future related studies.
format Thesis
qualification_level Master's degree
author Tufail, Muhammad Asim
author_facet Tufail, Muhammad Asim
author_sort Tufail, Muhammad Asim
title Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
title_short Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
title_full Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
title_fullStr Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
title_full_unstemmed Knowledge Management Capabilities As Predictor Of Project Performance In Malaysian Construction Companies
title_sort knowledge management capabilities as predictor of project performance in malaysian construction companies
granting_institution Universiti Sains Malaysia
granting_department Pusat Pengajian Perumahan Bangunan Dan Perancangan
publishDate 2013
url http://eprints.usm.my/44458/1/M%20Asim%20Tufail%20-24.pdf
_version_ 1747821374811930624