Hidden Cost In Building Conservation Works

More often than not, building conservation projects are usually completed with high cost and high time variances, which, in part is due to the uncertainty in actual work needed to conserve the building. Also, difficulty exists for cost estimators who are unfamiliar with building conservation work...

Full description

Saved in:
Bibliographic Details
Main Author: Wee, Li Woon
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://eprints.usm.my/45706/1/WEE%20LI%20WOON_HJ.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-usm-ep.45706
record_format uketd_dc
spelling my-usm-ep.457062019-10-23T07:37:46Z Hidden Cost In Building Conservation Works 2011-11 Wee, Li Woon TH Building construction More often than not, building conservation projects are usually completed with high cost and high time variances, which, in part is due to the uncertainty in actual work needed to conserve the building. Also, difficulty exists for cost estimators who are unfamiliar with building conservation works to estimate accurately. Realising the predicament in producing an accurate estimate, a study was conducted to identify the hidden costs of building conservation works, specifically the work items that contribute to such hidden cost and the factors affecting the cost overruns. A total of 16 respondents who have been involved in building conservation projects in Malaysia are surveyed using postal questionnaire. A total of thirty (30) work items that are specific to building conservation works are identified from the survey. Based on the results, these 30 special work items are grouped into four main categories, namely Research and Documentation, Scientific Studies, Laboratory Tests and Temporary Works. From the survey, work items such as ‘Carbonation Test’, ‘NIPGAT Test’, ‘Petrography Test’, and ‘Covermeter Survey’ are found to have the highest Relative Index value. Additionally, a total of 32 factors are also surveyed to detect the determinants of hidden costs in building conservation works. Dominant variables which are causing hidden costs include ‘lack of estimator’s expertise in conservation work’ and ‘lack of communication between consultants’. This study concludes with a list of work items encountered in building conservation works for quantity surveyor’s reference to prepare the cost estimate in future. 2011-11 Thesis http://eprints.usm.my/45706/ http://eprints.usm.my/45706/1/WEE%20LI%20WOON_HJ.pdf application/pdf en public masters Universiti Sains Malaysia Pusat Pengajian Perumahan, Bangunan & Perancangan
institution Universiti Sains Malaysia
collection USM Institutional Repository
language English
topic TH Building construction
spellingShingle TH Building construction
Wee, Li Woon
Hidden Cost In Building Conservation Works
description More often than not, building conservation projects are usually completed with high cost and high time variances, which, in part is due to the uncertainty in actual work needed to conserve the building. Also, difficulty exists for cost estimators who are unfamiliar with building conservation works to estimate accurately. Realising the predicament in producing an accurate estimate, a study was conducted to identify the hidden costs of building conservation works, specifically the work items that contribute to such hidden cost and the factors affecting the cost overruns. A total of 16 respondents who have been involved in building conservation projects in Malaysia are surveyed using postal questionnaire. A total of thirty (30) work items that are specific to building conservation works are identified from the survey. Based on the results, these 30 special work items are grouped into four main categories, namely Research and Documentation, Scientific Studies, Laboratory Tests and Temporary Works. From the survey, work items such as ‘Carbonation Test’, ‘NIPGAT Test’, ‘Petrography Test’, and ‘Covermeter Survey’ are found to have the highest Relative Index value. Additionally, a total of 32 factors are also surveyed to detect the determinants of hidden costs in building conservation works. Dominant variables which are causing hidden costs include ‘lack of estimator’s expertise in conservation work’ and ‘lack of communication between consultants’. This study concludes with a list of work items encountered in building conservation works for quantity surveyor’s reference to prepare the cost estimate in future.
format Thesis
qualification_level Master's degree
author Wee, Li Woon
author_facet Wee, Li Woon
author_sort Wee, Li Woon
title Hidden Cost In Building Conservation Works
title_short Hidden Cost In Building Conservation Works
title_full Hidden Cost In Building Conservation Works
title_fullStr Hidden Cost In Building Conservation Works
title_full_unstemmed Hidden Cost In Building Conservation Works
title_sort hidden cost in building conservation works
granting_institution Universiti Sains Malaysia
granting_department Pusat Pengajian Perumahan, Bangunan & Perancangan
publishDate 2011
url http://eprints.usm.my/45706/1/WEE%20LI%20WOON_HJ.pdf
_version_ 1747821550178926592