Stability Analysis Of Construction Design Reservoir Slopes Based On Numerical Simulation At Ulu Jelai Hydroelectric Dam Project, Cameron Highland, Pahang, Malaysia
A slope stability study alongside the right bank rim of Susu Dam reservoir was conducted to analyse the stability of the reservoir slopes. The factors of safety (FOS) under the loadings of steady-state seepage and transient seepage condition were determined by using Finite Element Method-Shear Stren...
Saved in:
Main Author: | Md. Yusof, Nur Qurrahtin A’ini |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.usm.my/48407/1/Stability%20Analysis%20Of%20Construction%20Design%20Reservoir%20Slopes%20Based%20On%20Numerical%20Simulation%20At%20Ulu%20Jelai%20Hydroelectric%20Dam%20Project%2C%20Cameron%20Highland%2C%20Pahang%2C%20Malaysia.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Anisotropic Shear Behavior Of Jointed Rock Masses At Ulu Jelai Hydroelectric Project, Pahang
by: Sapari, Nur Khafiza
Published: (2018) -
Community preparedness framework for disaster risk reduction of hydroelectric dams in Cameron Highland
by: Rashidi Sabri Bin Muda -
Impact of land use change on hydroelectric power generation in Cameron Highlands /
by: Choy, Fook Kun
Published: (2002) -
Modification of slope maintenance program along FT59, Jalan Tapah-Cameron Highland, Perak
by: Zamzuri, Ahmad Khairul
Published: (2012) -
Application of Electrical Resistivity Imaging Technique in Slope Stability Study of Granitic Residual Soils in the Cameron Highlands, Pahang
by: Lau, Kien Liong
Published: (2005)