Stability Analysis Of Construction Design Reservoir Slopes Based On Numerical Simulation At Ulu Jelai Hydroelectric Dam Project, Cameron Highland, Pahang, Malaysia
A slope stability study alongside the right bank rim of Susu Dam reservoir was conducted to analyse the stability of the reservoir slopes. The factors of safety (FOS) under the loadings of steady-state seepage and transient seepage condition were determined by using Finite Element Method-Shear Stren...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.usm.my/48407/1/Stability%20Analysis%20Of%20Construction%20Design%20Reservoir%20Slopes%20Based%20On%20Numerical%20Simulation%20At%20Ulu%20Jelai%20Hydroelectric%20Dam%20Project%2C%20Cameron%20Highland%2C%20Pahang%2C%20Malaysia.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!