Project Performance And Delays In Sudan Construction Industry
The construction industry in Sudan is facing several problems and challenges such as poor performance of projects and delay in completion of construction projects. This research seeks to identify those factors that enhance performance of the projects, as well as the factors that lead to the delay...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.usm.my/52339/1/Tesis%20Project%20performance%20and%20delay%20cut.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-usm-ep.52339 |
---|---|
record_format |
uketd_dc |
spelling |
my-usm-ep.523392022-04-15T07:35:01Z Project Performance And Delays In Sudan Construction Industry 2009-09 Elhassan, Salma Abdalrahman Mohamed TH1-9745 Building construction The construction industry in Sudan is facing several problems and challenges such as poor performance of projects and delay in completion of construction projects. This research seeks to identify those factors that enhance performance of the projects, as well as the factors that lead to the delay of projects in Sudan. A substantial literature done to obtain the information on factors that influence project performance and factors that cause the construction delay from previous researchers, from which forty one factors were identified for project performance and ten factors that cause delay. A total of 70 designed structured questionnaires were distributed to construction firms in Khartoum and 52 questionnaires were completed and returned. The Relative Importance Index (RII) was used to rank the factors that influence project performance and causes of delay. 2009-09 Thesis http://eprints.usm.my/52339/ http://eprints.usm.my/52339/1/Tesis%20Project%20performance%20and%20delay%20cut.pdf application/pdf en public masters Universiti Sains Malaysia Pusat Pengajian Perumahan, Banggunan & Perancangan |
institution |
Universiti Sains Malaysia |
collection |
USM Institutional Repository |
language |
English |
topic |
TH1-9745 Building construction |
spellingShingle |
TH1-9745 Building construction Elhassan, Salma Abdalrahman Mohamed Project Performance And Delays In Sudan Construction Industry |
description |
The construction industry in Sudan is facing several problems and challenges such as poor performance of projects and delay in completion of construction projects. This
research seeks to identify those factors that enhance performance of the projects, as
well as the factors that lead to the delay of projects in Sudan. A substantial literature
done to obtain the information on factors that influence project
performance and factors that cause the construction delay from previous researchers,
from which forty one factors were identified for project performance and ten factors
that cause delay. A total of 70 designed structured questionnaires were distributed to
construction firms in Khartoum and 52 questionnaires were completed and returned.
The Relative Importance Index (RII) was used to rank the factors that influence project performance and causes of delay. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Elhassan, Salma Abdalrahman Mohamed |
author_facet |
Elhassan, Salma Abdalrahman Mohamed |
author_sort |
Elhassan, Salma Abdalrahman Mohamed |
title |
Project Performance And Delays In Sudan
Construction Industry |
title_short |
Project Performance And Delays In Sudan
Construction Industry |
title_full |
Project Performance And Delays In Sudan
Construction Industry |
title_fullStr |
Project Performance And Delays In Sudan
Construction Industry |
title_full_unstemmed |
Project Performance And Delays In Sudan
Construction Industry |
title_sort |
project performance and delays in sudan
construction industry |
granting_institution |
Universiti Sains Malaysia |
granting_department |
Pusat Pengajian Perumahan, Banggunan & Perancangan |
publishDate |
2009 |
url |
http://eprints.usm.my/52339/1/Tesis%20Project%20performance%20and%20delay%20cut.pdf |
_version_ |
1747822165953085440 |