Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects

Disputes have kept Building Information Modelling (BIM) from reaching its full potential. Consequently, this study attempts to reduce BIM implementation disputes in Malaysian public construction projects. Experts were involved in two phases of the mixed methods study. Phase 1 was a preliminary inter...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad, Nur Hidayah
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.usm.my/59274/1/24%20Pages%20from%20NUR%20HIDAYAH%20BINTI%20AHMAD%20-%20TESIS.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-usm-ep.59274
record_format uketd_dc
spelling my-usm-ep.592742023-08-28T01:55:11Z Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects 2022-03 Ahmad, Nur Hidayah TH1-9745 Building construction Disputes have kept Building Information Modelling (BIM) from reaching its full potential. Consequently, this study attempts to reduce BIM implementation disputes in Malaysian public construction projects. Experts were involved in two phases of the mixed methods study. Phase 1 was a preliminary interview with six experts (to determine the need for reducing disputes among supply chain actors for BIM implementation). Meanwhile, Phase 2 began with a quantitative approach using the Fuzzy Delphi Method (FDM) on 14 experts to determine the main contributors that influence disputes (Objective Number 1). This was followed by qualitative approaches, namely self-grouping to identify the pathogens and pathogen sub-categories of disputes (Objective Number 2) and two sessions of Focus Group Discussion (FGD) involving six experts towards finally developing a validated SCM framework for BIM implementation (Objective Number 3). As a result of the quantitative approach, three main contributors that influence disputes were determined. The qualitative approach identified: (i) two pathogens as people issues, (ii) only one pathogen and two sub-pathogens as process problems, and (iii) product uncertainty is limited to one pathogen and one pathogen sub-category. 2022-03 Thesis http://eprints.usm.my/59274/ http://eprints.usm.my/59274/1/24%20Pages%20from%20NUR%20HIDAYAH%20BINTI%20AHMAD%20-%20TESIS.pdf application/pdf en public phd doctoral Perpustakaan Hamzah Sendut Pusat Pengajian Perumahan Bangunan Dan Perancangan
institution Universiti Sains Malaysia
collection USM Institutional Repository
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Ahmad, Nur Hidayah
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
description Disputes have kept Building Information Modelling (BIM) from reaching its full potential. Consequently, this study attempts to reduce BIM implementation disputes in Malaysian public construction projects. Experts were involved in two phases of the mixed methods study. Phase 1 was a preliminary interview with six experts (to determine the need for reducing disputes among supply chain actors for BIM implementation). Meanwhile, Phase 2 began with a quantitative approach using the Fuzzy Delphi Method (FDM) on 14 experts to determine the main contributors that influence disputes (Objective Number 1). This was followed by qualitative approaches, namely self-grouping to identify the pathogens and pathogen sub-categories of disputes (Objective Number 2) and two sessions of Focus Group Discussion (FGD) involving six experts towards finally developing a validated SCM framework for BIM implementation (Objective Number 3). As a result of the quantitative approach, three main contributors that influence disputes were determined. The qualitative approach identified: (i) two pathogens as people issues, (ii) only one pathogen and two sub-pathogens as process problems, and (iii) product uncertainty is limited to one pathogen and one pathogen sub-category.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Ahmad, Nur Hidayah
author_facet Ahmad, Nur Hidayah
author_sort Ahmad, Nur Hidayah
title Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_short Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_full Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_fullStr Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_full_unstemmed Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_sort development of supply chain management framework for building information modelling implementation in public sector construction projects
granting_institution Perpustakaan Hamzah Sendut
granting_department Pusat Pengajian Perumahan Bangunan Dan Perancangan
publishDate 2022
url http://eprints.usm.my/59274/1/24%20Pages%20from%20NUR%20HIDAYAH%20BINTI%20AHMAD%20-%20TESIS.pdf
_version_ 1776101277601628160