The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students

Building Information Modelling, or BIM, is a collaborative system used in the building industry. However, BIM implementation in Malaysia Architecture Engineering Construction (AEC) industry is still low. The method for encouraging the AEC industry to use BIM is to prepare graduates with this technol...

Full description

Saved in:
Bibliographic Details
Main Author: Azhar, Nurhidayah
Format: Thesis
Language:English
Published: 2023
Subjects:
Online Access:http://eprints.usm.my/60593/1/NURHIDAYAH%20BINTI%20AZHAR%20-%20TESIS%20cut.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-usm-ep.60593
record_format uketd_dc
spelling my-usm-ep.605932024-05-08T07:27:13Z The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students 2023-01 Azhar, Nurhidayah TH1-9745 Building construction Building Information Modelling, or BIM, is a collaborative system used in the building industry. However, BIM implementation in Malaysia Architecture Engineering Construction (AEC) industry is still low. The method for encouraging the AEC industry to use BIM is to prepare graduates with this technology expertise. This research aims to examine the status of BIM adoption among Malaysian polytechnic architecture students. The questions that this research explores are: what is the level of students’ readiness, BIM usage and BIM adoption level? In order to explore the questions, this research used the Technology Acceptance Model (TAM). The suggested model in particular, extends the TAM by adding students’ readiness as an external variable. A quantitative research with questionnaire survey was conducted to examine the hypotheses. The survey was distributed to fifth semester Malaysian polytechnic architecture students using stratified simple random sampling method. Responses were analysed using descriptive analysis, Pearson correlation, and multiple regression in Statistical Package for Social Science (SPSS) version 26. The results showed that students’ readiness, BIM usage, and BIM adoption level were high. Students’ adoption levels were in the high and moderate levels, with the majority of them at the manipulation level. Hypotheses one and two; students’ readiness and BIM usage significantly affected BIM adoption, hypothesis 3; BIM adoption has significantly affected BIM adoption level. 2023-01 Thesis http://eprints.usm.my/60593/ http://eprints.usm.my/60593/1/NURHIDAYAH%20BINTI%20AZHAR%20-%20TESIS%20cut.pdf application/pdf en public masters Universiti Sains Malaysia Pusat Pengajian Perumahan, Banggunan & Perancangan
institution Universiti Sains Malaysia
collection USM Institutional Repository
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Azhar, Nurhidayah
The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students
description Building Information Modelling, or BIM, is a collaborative system used in the building industry. However, BIM implementation in Malaysia Architecture Engineering Construction (AEC) industry is still low. The method for encouraging the AEC industry to use BIM is to prepare graduates with this technology expertise. This research aims to examine the status of BIM adoption among Malaysian polytechnic architecture students. The questions that this research explores are: what is the level of students’ readiness, BIM usage and BIM adoption level? In order to explore the questions, this research used the Technology Acceptance Model (TAM). The suggested model in particular, extends the TAM by adding students’ readiness as an external variable. A quantitative research with questionnaire survey was conducted to examine the hypotheses. The survey was distributed to fifth semester Malaysian polytechnic architecture students using stratified simple random sampling method. Responses were analysed using descriptive analysis, Pearson correlation, and multiple regression in Statistical Package for Social Science (SPSS) version 26. The results showed that students’ readiness, BIM usage, and BIM adoption level were high. Students’ adoption levels were in the high and moderate levels, with the majority of them at the manipulation level. Hypotheses one and two; students’ readiness and BIM usage significantly affected BIM adoption, hypothesis 3; BIM adoption has significantly affected BIM adoption level.
format Thesis
qualification_level Master's degree
author Azhar, Nurhidayah
author_facet Azhar, Nurhidayah
author_sort Azhar, Nurhidayah
title The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students
title_short The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students
title_full The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students
title_fullStr The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students
title_full_unstemmed The Relationship Between Students’ Readiness, Bim Usage, Bim Adoption And Bim Adoption Level Among Malaysian Polytechnic Architecture Students
title_sort relationship between students’ readiness, bim usage, bim adoption and bim adoption level among malaysian polytechnic architecture students
granting_institution Universiti Sains Malaysia
granting_department Pusat Pengajian Perumahan, Banggunan & Perancangan
publishDate 2023
url http://eprints.usm.my/60593/1/NURHIDAYAH%20BINTI%20AZHAR%20-%20TESIS%20cut.pdf
_version_ 1804888969883680768