APA (7th ed.) Citation

Omar, M. (2008). A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].

Chicago Style (17th ed.) Citation

Omar, Mahanim. A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 F Rb]. 2008.

MLA (8th ed.) Citation

Omar, Mahanim. A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 F Rb]. 2008.

Warning: These citations may not always be 100% accurate.