Customer demand and planning efficiency in overall equipment effectiveness (OEE)

Overall equipment effectiveness (OEE) is the multiplication of availability, performance and quality which are looking into the losses such as downtime losses, speed losses and quality losses respectively. The study is carried out in an aerospace parts manufacturing company to acquire the time data...

Full description

Saved in:
Bibliographic Details
Main Author: Teoh, Yong Siang
Format: Thesis
Language:English
English
Published: 2013
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/15746/1/Customer%20demand%20and%20planning%20efficiency%20in%20overall%20equipment%20effectiveness%20%28OEE%29%2824pgs%29.pdf
http://eprints.utem.edu.my/id/eprint/15746/2/Customer%20demand%20and%20planning%20efficiency%20in%20overall%20equipment%20effectiveness%20%28OEE%29.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utem-ep.15746
record_format uketd_dc
spelling my-utem-ep.157462022-09-15T15:52:25Z Customer demand and planning efficiency in overall equipment effectiveness (OEE) 2013 Teoh, Yong Siang T Technology (General) TS Manufactures Overall equipment effectiveness (OEE) is the multiplication of availability, performance and quality which are looking into the losses such as downtime losses, speed losses and quality losses respectively. The study is carried out in an aerospace parts manufacturing company to acquire the time data of Autoclave section via the computerized recording system. In this study, planning factor is introduced in OEE and defined as the panel number loaded over the maximum number of panel affordable by autoclaves. This is to promote the optimization of Autoclave usage or the concept of On Time In Full (OTIF). In addition to that, customer demand is also incorporated in OEE through Takt Time. This evaluates Autoclaves with constant and fixed cycle time in varying performance ratio from time to time according to its real performance. This also provides a balance between the over-production issue and high utilization of equipment. The results of planning factor and Takt time incorporation show that curing of Autoclave was not planned up to its maximum capability; and the demand accepted is actually higher than its maximum capacity. After that, the OEE data once obtained is then used for versatile usages such as scheduling or planning of preventive maintenance frequency, examination of customer demand accepted with respect to Autoclave capacity, comparison of performance over the time horizon as well as the evaluation of material losses due to planning of equipment process. Among them the estimation ofbreakdown time (via MTBF) and priority of preventive maintenance on Autoclave is done by analyzing the availability data and the percentage of downtime composition. Another possible usage of OEE data is the calculation of material amount based on the Bill of Material (BOM) and the average of historical quality ratio data. As a conclusion, objectives are achieved since the customer demand is incorporated into OEE,efficiency of planning is examined and versatile usage of OEE value and data are demonstrated. Further study could be suggested is the possibility of implementing Takt time and planning factor in the equipment with varying cycle time 2013 Thesis http://eprints.utem.edu.my/id/eprint/15746/ http://eprints.utem.edu.my/id/eprint/15746/1/Customer%20demand%20and%20planning%20efficiency%20in%20overall%20equipment%20effectiveness%20%28OEE%29%2824pgs%29.pdf text en public http://eprints.utem.edu.my/id/eprint/15746/2/Customer%20demand%20and%20planning%20efficiency%20in%20overall%20equipment%20effectiveness%20%28OEE%29.pdf text en validuser https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=85367 mphil masters Universiti Teknikal Malaysia Melaka Faculty of Manufacturing Engineering
institution Universiti Teknikal Malaysia Melaka
collection UTeM Repository
language English
English
topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Teoh, Yong Siang
Customer demand and planning efficiency in overall equipment effectiveness (OEE)
description Overall equipment effectiveness (OEE) is the multiplication of availability, performance and quality which are looking into the losses such as downtime losses, speed losses and quality losses respectively. The study is carried out in an aerospace parts manufacturing company to acquire the time data of Autoclave section via the computerized recording system. In this study, planning factor is introduced in OEE and defined as the panel number loaded over the maximum number of panel affordable by autoclaves. This is to promote the optimization of Autoclave usage or the concept of On Time In Full (OTIF). In addition to that, customer demand is also incorporated in OEE through Takt Time. This evaluates Autoclaves with constant and fixed cycle time in varying performance ratio from time to time according to its real performance. This also provides a balance between the over-production issue and high utilization of equipment. The results of planning factor and Takt time incorporation show that curing of Autoclave was not planned up to its maximum capability; and the demand accepted is actually higher than its maximum capacity. After that, the OEE data once obtained is then used for versatile usages such as scheduling or planning of preventive maintenance frequency, examination of customer demand accepted with respect to Autoclave capacity, comparison of performance over the time horizon as well as the evaluation of material losses due to planning of equipment process. Among them the estimation ofbreakdown time (via MTBF) and priority of preventive maintenance on Autoclave is done by analyzing the availability data and the percentage of downtime composition. Another possible usage of OEE data is the calculation of material amount based on the Bill of Material (BOM) and the average of historical quality ratio data. As a conclusion, objectives are achieved since the customer demand is incorporated into OEE,efficiency of planning is examined and versatile usage of OEE value and data are demonstrated. Further study could be suggested is the possibility of implementing Takt time and planning factor in the equipment with varying cycle time
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Teoh, Yong Siang
author_facet Teoh, Yong Siang
author_sort Teoh, Yong Siang
title Customer demand and planning efficiency in overall equipment effectiveness (OEE)
title_short Customer demand and planning efficiency in overall equipment effectiveness (OEE)
title_full Customer demand and planning efficiency in overall equipment effectiveness (OEE)
title_fullStr Customer demand and planning efficiency in overall equipment effectiveness (OEE)
title_full_unstemmed Customer demand and planning efficiency in overall equipment effectiveness (OEE)
title_sort customer demand and planning efficiency in overall equipment effectiveness (oee)
granting_institution Universiti Teknikal Malaysia Melaka
granting_department Faculty of Manufacturing Engineering
publishDate 2013
url http://eprints.utem.edu.my/id/eprint/15746/1/Customer%20demand%20and%20planning%20efficiency%20in%20overall%20equipment%20effectiveness%20%28OEE%29%2824pgs%29.pdf
http://eprints.utem.edu.my/id/eprint/15746/2/Customer%20demand%20and%20planning%20efficiency%20in%20overall%20equipment%20effectiveness%20%28OEE%29.pdf
_version_ 1747833874585485312