Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques

software projects have a very high failure rate. This risk of failure is not always avoidable, but it is controllable. Thus, the aim of this study is to present the stepwise and fuzzy multiple regression analysis modelling, which studies the impact of different risk management techniques and differe...

Full description

Saved in:
Bibliographic Details
Main Author: Abdelrafe M.S., Elzamly
Format: Thesis
Language:aa
aa
Published: 2016
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/18529/1/Managing%20Software%20Project%20Risks%20Using%20Stepwise%20And%20Fuzzy%20Regression%20Analysis%20Modelling%20Techniques%2024%20Pages.pdf
http://eprints.utem.edu.my/id/eprint/18529/2/Managing%20Software%20Project%20Risks%20Using%20Stepwise%20And%20Fuzzy%20Regression%20Analysis%20Modelling%20Techniques.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utem-ep.18529
record_format uketd_dc
institution Universiti Teknikal Malaysia Melaka
collection UTeM Repository
language aa
aa
advisor Hussin, Burairah

topic Q Science (General)
QA76 Computer software
spellingShingle Q Science (General)
QA76 Computer software
Abdelrafe M.S., Elzamly
Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
description software projects have a very high failure rate. This risk of failure is not always avoidable, but it is controllable. Thus, the aim of this study is to present the stepwise and fuzzy multiple regression analysis modelling, which studies the impact of different risk management techniques and different software risk factors on software development projects. Furthermore, there are 5 main phases in risk management approach such as risk identification, risk analysis and evaluation, risk treatment, risk controlling, risk communication and documentation for software development life cycle. The model incorporates risk management approach and SDLC methodology to mitigate software project failure based on quantitative and intelligent risk techniques. This study provides empirical evidence for the identification of risk factors in model identify and model software risk factors and risk management techniques that effect on successful software projects. Fifty software risk factors and thirty risk management techniques were obtained from the literature to respondents. The results show that all risks in software projects are very important in the perspective of a software project manager, and all risk management techniques are the most commonly used. The study indicates that forty nine software risk factors can be mitigated by risk management techniques according to the stepwise and fuzzy multiple regression analysis modelling techniques. The model’s predictive accuracy slightly improves in fuzzy multiple regression rather than stepwise multiple regression technique. The study has been conducted on a group of software project/IT managers in Palestine. This study will guide software managers to apply software risk management practices with the real world of software development organizations. The effectiveness of the new techniques and approaches on a software project has also been verified.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Abdelrafe M.S., Elzamly
author_facet Abdelrafe M.S., Elzamly
author_sort Abdelrafe M.S., Elzamly
title Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
title_short Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
title_full Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
title_fullStr Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
title_full_unstemmed Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
title_sort managing software project risks using stepwise and fuzzy regression analysis modelling techniques
granting_institution Universiti Teknikal Malaysia Melaka
granting_department Faculty of Information and Communication Technology
publishDate 2016
url http://eprints.utem.edu.my/id/eprint/18529/1/Managing%20Software%20Project%20Risks%20Using%20Stepwise%20And%20Fuzzy%20Regression%20Analysis%20Modelling%20Techniques%2024%20Pages.pdf
http://eprints.utem.edu.my/id/eprint/18529/2/Managing%20Software%20Project%20Risks%20Using%20Stepwise%20And%20Fuzzy%20Regression%20Analysis%20Modelling%20Techniques.pdf
_version_ 1747833932486803456
spelling my-utem-ep.185292021-10-08T13:46:15Z Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques 2016 Abdelrafe M.S., Elzamly Q Science (General) QA76 Computer software software projects have a very high failure rate. This risk of failure is not always avoidable, but it is controllable. Thus, the aim of this study is to present the stepwise and fuzzy multiple regression analysis modelling, which studies the impact of different risk management techniques and different software risk factors on software development projects. Furthermore, there are 5 main phases in risk management approach such as risk identification, risk analysis and evaluation, risk treatment, risk controlling, risk communication and documentation for software development life cycle. The model incorporates risk management approach and SDLC methodology to mitigate software project failure based on quantitative and intelligent risk techniques. This study provides empirical evidence for the identification of risk factors in model identify and model software risk factors and risk management techniques that effect on successful software projects. Fifty software risk factors and thirty risk management techniques were obtained from the literature to respondents. The results show that all risks in software projects are very important in the perspective of a software project manager, and all risk management techniques are the most commonly used. The study indicates that forty nine software risk factors can be mitigated by risk management techniques according to the stepwise and fuzzy multiple regression analysis modelling techniques. The model’s predictive accuracy slightly improves in fuzzy multiple regression rather than stepwise multiple regression technique. The study has been conducted on a group of software project/IT managers in Palestine. This study will guide software managers to apply software risk management practices with the real world of software development organizations. The effectiveness of the new techniques and approaches on a software project has also been verified. UTeM 2016 Thesis http://eprints.utem.edu.my/id/eprint/18529/ http://eprints.utem.edu.my/id/eprint/18529/1/Managing%20Software%20Project%20Risks%20Using%20Stepwise%20And%20Fuzzy%20Regression%20Analysis%20Modelling%20Techniques%2024%20Pages.pdf text aa public http://eprints.utem.edu.my/id/eprint/18529/2/Managing%20Software%20Project%20Risks%20Using%20Stepwise%20And%20Fuzzy%20Regression%20Analysis%20Modelling%20Techniques.pdf text aa validuser https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=100367 phd doctoral Universiti Teknikal Malaysia Melaka Faculty of Information and Communication Technology Hussin, Burairah 1. Aagedal, J., Braber, F., Dimitrakos, T., Gran, B., Raptis, D., and Stølen, K., 2002. Model-based Risk Assessment to Improve Enterprise Security. In Proceedings of The Sixth International Enterprise Distributed Object Computing Conference (EDOC’02). p. 12. 2. Aali, K., Parsinejad, M. and Rahmani, B., 2009. Estimation of Saturation Percentage of Soil Using Multiple Regression, ANN, and ANFIS Techniques. Computer and Information Science, 2(3), pp.127–136. 3. Addison, T., 2003. E-commerce project development risks: Evidence from a Delphi survey. International Journal of Information Management, 23(2003), pp.25–40. 4. Addison, T. and Vallabh, S., 2002. Controlling Software Project Risks – an Empirical Study of Methods used by Experienced Project Managers. In Proceedings of SAICSIT. pp. 128 – 140. 5. Ahmed, A., 2011. Software Project Management: A Process-Driven Approach First., Auerbach Publications. 6. Al-ahmad, W., Al-fagih, K., Khanfar, K., Alsamara, K., Abuleil, S., and Abu-salem, H., 2009. A Taxonomy of an IT Project Failure: Root Causes. Management Review, 5(1), pp.93–104. 7. Al-Ahmad, W., 2012. Knowledge of IT Project Success and Failure Factors: Towards an Integration into the SDLC. International Journal of Information Technology Project Management, 3(4), pp.56–71. 8. Alhawari, S., Thabtah, F., Karadsheh, L., and Hadi, W., 2008. A Risk Management Model for Project Execution. In The 9th IIBIMA Conference on Information Management in Modern Organizations. pp. 887–893. 9. Alkhattab, A. and Hood, J., 2015. The Risk Management Process in Jordanian Public Shareholding Organisations. International Journal of Business and Management, 10(8), pp.151–160. 10. Aloini, D., Dulmin, R. and Mininno, V., 2007. Risk management in ERP project introduction: Review of the literature. Information and Management, 44(6), pp.547–567. 11. Alyahya, M., Ahmad, R. and Lee, S., 2009. Effect of CMMI-Based Software Process Maturity on Software Schedule Estimation. Malaysian Journal of Computer Science, 22(2), pp.121–137. 12. Anantatmula, V., 2010. Project Planning Techniques for Academic Advising and Learning. the International Journal of the Scholarship of Teaching and Learning, 6(1), pp.1–19. 13. Aritua, B., Smith, N. and Bower, D., 2011. What risks are common to or amplified in programmes: Evidence from UK public sector infrastructure schemes. International Journal of Project Management, 29(3), pp.303–312. 14. Arnuphaptrairong, T., 2011. Top Ten Lists of Software Project Risks: Evidence from the Literature Survey. In proceedings of the International multi conference of Engineers and Computer Scientists 2011 (IMECS 2011). p. 6. 15. Azari, A., Mousavi, N. and Mousavi, S., 2011. Risk assessment model selection in construction industry. Expert Systems with Applications, 38(8), pp.9105–9111. 16. Aziz, M. and Salleh, H., 2011. People Critical Success Factors of IT/IS Implementation: Malaysian Perspectives. World Academy of science, Engineering, and Technology, 80(56), pp.75–82. 17. Bakker, K., Boonstra, A. and Wortmann, H., 2010. Does risk management contribute to IT project success? A meta-analysis of empirical evidence. International Journal of Project Management, 28(5), pp.493–503. 18. Bannerman, P., 2010. Managing Structure-Related Software Project Risk: A New Role for Project Governance. In 21st Australian Software Engineering Conference. pp. 129–138. 19. Bannerman, P., 2008. Risk and risk management in software projects: A reassessment. Journal of Systems and Software, 81(12), pp.2118–2133. 20. Basha, S. and P, D., 2010. Analysis of Empirical Software Effort Estimation Models. International Journal of Computer Science and Information Security (IJCSIS), 7(3), pp.68–77. 21. Bavani, R., 2010. Global Software Engineering: Challenges in Customer Value Creation. In 2010 International Conference on Global Software Engineering. pp. 119–122. 22. Bavota, G., Gethers, M., Oliveto, R., Poshyvanyk, D., and Lucia, A., 2014. Improving Software Modularization via Automated Analysis of Latent. ACM Transactions on Software Engineering and Methodology, 23(1), pp.1–33. 23. Begum, Z., Khan, M., Hafiz, M., Islam, M. S., and Shoyaib, M., 2008. Software Development Standard and Software Engineering Practice: A Case Study of Bangladesh. Journal of Bangladesh Academy of Sciences, 32(2), pp.131–139. 24. Bennatan, E., 2006. Catastrophe Disentanglement: Getting Software Projects Back on Track, Addison Wesley Professional. 25. Berenbach, B., Paulish, D., Kazmeier, J., and Rudorfer, A., 2009. Software & Systems Requirements Engineering: In Practice, McGraw-Hill Companies. 26. Bhoola, V., Hiremath, S. and Mallik, D., 2014. Identifying and Evaluation of Risks in Software Projects in Indian IT Industries. International Journal of Research in Business and Technology, 4(1), pp.346–353. 27. Bhujang, R. and V., S., 2014. Risk Impact Analysis across the Phases of Software Development. Lecture Notes on Software Engineering, 2(3), pp.282–287. 28. Binder, R., 1999. Testing Object-Oriented Systems: Models, Patterns, and Tools (ARP/AOD), Addison-Wesley Professional. 29. Blackmore, K. and Nesbitt, K., 2008. Identifying Risks for Cross-Disciplinary Higher Degree Research Students. In ReproductionProc. Tenth Australasian Computing Education Conference (ACE2008), Wollongong, Australia. pp. 43–52. 30. Boehm, B., 2002a. Boehm’s Top 10 2002 - Software Risks. The USC Center for Systems and Software Engineering, p.1. Available at: http://csse.usc.edu/BoehmsTop10/2006/survey.php [Accessed February 28, 2012]. 31. Boehm, B., Clark, B., Horowitz, E., Westland, C., Madachy, R., and Selby, R., 1995. Cost Models for Future Software Life Cycle Processes: COCOMO 2.0. Annals of Software Engineering, 1(1), pp.57–94. 32. Boehm, B., 2000. Project Termination Doesn’t Equal Project Failure. IEEE Computer Society Press Los Alamitos, CA, USA, 33(9), pp.94–96. 33. Boehm, B., 2002b. Software Risk Management: Overview and Recent Developments, Available at: http://sunset.usc.edu/ ( report). 34. Boehm, B., 1991. Software Risk Management: Principles and Practices. IEEE software, 8(1), pp.32–40. 35. Boehm, B., 2007. USC CSSE Workshop Overview: Top 3 Software-Intensive Systems Risk Items. 36. Boehm, B., Abts, C. and Chulani, S., 2000. Software development cost estimation approaches – A survey. Annals of Software Engineering, 10(2000), pp.177–205. 37. Boehm, B. and Ross, R., 1989. Theory-W Software Project Management: Principles and Examples. IEEE Transactions on Software Engineering, 15(7), pp.902–916. 38. Brandon, D., 2006. Project Management for Modern Information Systems, IRM press, Idea Group Inc. 39. Bronte-Stewart, M., 2009. Risk Estimation From Technology Project Failure. In 4th European Conference on Management of Technology. pp. 1–19. 40. Buckley, R. and Caple, J., 2009. The Theory & Practice of Training 6th ed., kogan page London and Philadelphia. 41. Büyüközkan, G. and Ruan, D., 2010. Choquet integral based aggregation approach to software development risk assessment. Information Sciences, 180(3), pp.441–451. 42. Cahill, V., Fox, A., Kindberg, T., and Noble, B., 2004. Building and Evaluating Ubiquitous System Software. Pervasive Computing, IEEE CS and IEEE ComSoc, 3(3), pp.20–21. 43. Calp, H. and Akcayol, A., 2015. Risk Factors and Risk Management Process Encountered in Software Project. Marmara University Journal of Science, 27(1), p.1. 44. Cantor, M., 1998. Object-Oriented Project Management with UML, John Wiley & Sons, Inc. 45. Carl Pritchard, 2001. RISK management second., ESI International Arlington, Virginia. 46. Carr, V. and Tah, J., 2001. A fuzzy approach to construction project risk assessment and analysis: construction project risk management system. Advances in Engineering Software, 32(10-11), pp.847–857. 47. CHAOS, 2007. First Quarter Research Report. 48. CHAOS, 1995. The Standish Group Report. 49. Chapman, R. and Thomas, D., 2007. A Guide to Printed and Electronic Resources for Developing a Cost-Effective Risk Mitigation Plan for New and Existing Constructed Facilities, National Institute of Standards and Technology Building and Fire Research Laboratory. 50. Charette, R., 2006. Why Software Fails (Software Failure). Spectrum, IEEE, 42(9), pp.42–49. 51. Chemuturi, M., 2009. Software Estimation Best Practices, Tools & Techniques: A Complete Guide for software project estimators, J. Ross Publishing. 52. Chen, H., Jiang, J., Klein, G., and Chen, J, 2009. Reducing software requirement perception gaps through coordination mechanisms. Journal of Systems and Software, 82(4), pp.650–655. 53. Chen, J. and Huang, S., 2009. An empirical analysis of the impact of software development problem factors on software maintainability. The Journal of Systems and Software, 82(6), pp.981–992. 54. Chen, Y. and Weng, C., 2008. Mining association rules from imprecise ordinal data. Fuzzy Sets and Systems, 159(4), pp.460–474. 55. Chen, Y. and Weng, C., 2009. Mining fuzzy association rules from questionnaire data. Knowledge-Based Systems, 22(1), pp.46–56. 56. Christiansen, T., Wuttidittachotti, P., Prakancharoen, S., and Vallipakorn, S., 2015. Prediction of risk factors of software development project by using multiple logistic regression. ARPN Journal of Engineering and Applied Sciences, 10(3), pp.1324–1331. 57. Clancy, T., 1995. The standish group report ©. 58. Cliff Mitchell, 2011. Why don’t we learn from our project failures. University of Manchester, p.1. Available at: https://tm.mbs.ac.uk/SearchResults/tabid/56/ArticleID/72/Why-don%E2%80%99t-we learn-from-our-project-failures.aspx [Accessed March 1, 2012]. 59. Conroy, G. and Soltan, H., 1998. ConSERV, a project specific risk management concept. International Journal of Project Management, 16(6), pp.353–366. 60. Costa, H., Barros, M. and Travassos, G., 2005. A Risk Based Economical Approach for Evaluating Software Project Portfolios. In Proceeding EDSER ’05 Proceedings of the seventh international workshop on Economics-driven software engineering research. pp. 1–5. 61. Dash, R. and Dash, R., 2010. Risk Assessment Techniques for Software Development. European Journal of Scientific Research, 42(4), pp.629–636. 62. Dawson, C., 2005. Projects in Computing and Information Systems A Student ’ s Guide, England: Pearson Education Limited. 63. Deepak, N. and Kumar, S., 2014. Perceptions on Risk Management Strategies in Software Development Perceptions on Risk Management Strategies in Software Development. International Journal of System and Software Engineering, 2(1), pp.20–27. 64. Deng, J. and Bian, Y., 2008. Constructing a Risk Management Mechanism Model of ERP Project Implementation. In International Conference on Information Management, Innovation Management and Industrial Engineering. pp. 72–77. 65. Dhlamini, J., Nhamu, I. and Kachepa, A., 2009. Intelligent Risk Management Tools for Software Development. In Proceeding SACLA “09 Proceedings of the 2009 Annual Conference of the Southern African Computer Lecturers” Association. pp. 33–40. 66. Dom, R., Abidin, B., Kareem, S., Ismail, S., and Daud, N., 2012. Determining the Critical Success Factors of Oral Cancer Susceptibility Prediction in Malaysia Using Fuzzy Models. Sains Malaysiana, 41(5), pp.633–640. 67. Dominguez, J., 2009. The CHAOS Report 2009 on IT Project Failure. 68. Dua, S., Keil, M., Mathiassen, L., Shen, Y., and Tiwana, A., 2007. Attention-shaping tools, expertise, and perceived control in IT project risk assessment. Decision Support Systems, 43(1), pp.269–283. 69. Dufner, D., Kwon, O. and Doty, A., 1999. Improving Software Development Project Team Performance: A Web-based Expert Support System for Project Control. In Proceedings of the 32nd Annual Hawaii International Conference on Systems Sciences (HICSS-32). pp. 1–10. 70. Dustin, E., 2002. Effective Software Testing: 50 Specific Ways to Improve Your Testing, Addison-Wesley Professional. 71. Dyba, T. and Dingsoyr, T., 2008. Empirical studies of agile software development: A systematic review. Information and Software Technology, 50(9-10), pp.833–859. 72. Dzung, D. and Briod, C., 2005. Shared Authorization in Industrial Automation Systems Using Threshold Cryptography. In 10th IEEE Conference on Emerging Technologies and Factory Automation (ETFA 2005). pp. 867–876. 73. El-Dereny, M. and Rashwan, N., 2011. Solving Multicollinearity Problem Using Ridge Regression Models. Int. J. Contemp. Math. Sciences, 6(12), pp.585–600. 74. Emam, K., 2005. The ROI from software quality, Auerbach Publications. 75. Enfei, L., 2015. Risk Factors of Software Development Projects in Chinese IT Small and Medium Sized Enterprises. KTH Royal Institute Of Technology ,Stockholm, Sweden. 76. Ernawati, T., Suhardi and Nugroho, D., 2012. IT Risk Management Framework Based on ISO 31000:2009. In International Conference on System Engineering and Technology (ICSET). pp. 1–8. 77. Fairley, R., 2009. Managing and leading software projects, A John Wiley & Sons, INC. 78. Fakhar, M., Abbas, M. and Waris, M., 2013. Risk Management System for ERP Software Project. In Science and Information Conference 2013. pp. 223–228. 79. Fan, M., Lin, N. and Sheu, C., 2008. Choosing a project risk-handling strategy: An analytical model. International Journal of Production Economics, 112(2), pp.700–713. 80. Ferraro, J., 2012. Project management techniques for non-project managers, AMACOM. 81. Fink, L. and Lichtenstein, Y., 2014. Why Project Size Matters for Contract Choice in Software Development Outsourcing. The DATA BASE for Advances in Information Systems, 45(3), pp.54–71. 82. Flom, P. and Cassell, D., 2007. Stopping stepwise: Why stepwise and similar selection methods are bad, and what you should use. In NESUG 2007 Statistics and Data Analysis. pp. 1–7. 83. Fox, W. and Waldt, G., 2008. A Guide to Project Management, Juta Academic. 84. Fuggetta, A. and Nitto, E., 2014. Software Process. In 36th International Conference on Software Engineering, Hyderabad. pp. 1–12. 85. Galorath, D., 2006. The 10 Step Software Estimation Process For Successful Software Planning, Measurement and Control. , (February 2006), pp.1–13. 86. Galorath, D. and Evans, M., 2006. Software Sizing, Estimation, and Risk Management, Auerbach Publications. 87. Ghosh, S., Boswell, J., Kwak, Y., and Skibniewski, M., 2011. Risk Governance Framework for Enterprise-Wide Application Implementations. In IEEE Int’l Technology Management Conferenc. pp. 932–938. 88. Gorla, N. and Lin, S., 2010. Determinants of software quality: A survey of information systems project managers. Information and Software Technology, 52(6), pp.602–610. 89. Grabski, S., Leech, S. and Lu, B., 2001. Risks and Controls in the Implementation of ERP Systems. International Journal of Digital Accounting Research, 1(1), pp.47–68. 90. Grady, J., 2006. System requirements analysis, Academic Press. 91. Green, R., 2000. Documentation meets version control: an automated backup system for HTML-based help. In Professional Communication Conference, Proceedings of 2000 Joint IEEE International and 18th Annual Conference on Computer Documentation (IPCC/SIGDOC 2000). pp. 541–548. 92. Greenyer, J., Sharifloo, A., Cordy, M., and Heymans, P., 2012. Efficient Consistency Checking of Scenario-Based Product-Line Specifications. In 20th IEEE International Requirements Engineering Conference (RE). pp. 161–170. 93. Greg Horine, 2009. Project Management second., Cindy Lenser. 94. Gu, X., Song, G. and Xiao, L., 2006. Design of a Fuzzy Decision-making Model and Its Application to Software Functional Size Measurement. In International Conference on Computational Intelligence for Modelling Control and Automation, and International Conference on Intelligent Agents,Web Technologies and Internet Commerce (CIMCA-IAWTIC’06). pp. 199–205. 95. Hallows, J., 2005. Information Systems Project Management: How to Deliver Function and Value in Information Technology Projects Second., AMACOM. 96. Han, W. and Huang, S., 2007. An empirical analysis of risk components and performance on software projects. Journal of Systems and Software, 80(1), pp.42–50. 97. Hayat, F., Bhatt, M., Ehsan, N., Ishaque, A., Ahmed, S., and Mirza, E., 2010. A methodology to manage the changing requirements of a software project. In 2010 International Conference on Computer Information Systems and Industrial Management Applications (CISIM). pp. 319–322. 98. Hill, P., 2011. Practical Software Project Estimation: A Toolkit for Estimating Software Development Effort and Duration, International Software Benchmarking Standards Group (ISBSG), McGraw-Hill. 99. Hillary, N., 2005. Measuring Performance for Real-Time Systems (report). 100. Hoffer, J., George, J. and Valacich, J., 2011. Modern Systems Analysis and Design 6th ed., Prentice Hall. 101. Holcombe, M., 2008. Running an Agile Software Development Project, John Wiley & Sons, Inc. 102. Holzmann, V. and Spiegler, I., 2010. Developing risk breakdown structure for information technology organizations. International Journal of Project Management, 29(5), pp.537–546. 103. Hoodat, H. and Rashidi, H., 2009. Classification and Analysis of Risks in Software Engineering. Engineering and Technology, 56(32), pp.446–452. 104. House of Commons London, 2009. The National Offender Management Information System, Parliament: House of Commons: Committee of Public. 105. Houston, D., Mackulak, G. and Collofello, J., 2001. Stochastic simulation of risk factor potential effects for software development risk management. Journal of Systems and Software, 59(3), pp.247–257. 106. Huang, S. and Han, W., 2008. Exploring the relationship between software project duration and risk exposure: A cluster analysis. Information & Management, 45(3), pp.175–182. 107. Hudin, N. and Abdul Hamid, A.B., 2015. Supply Chain Risk Management in Automotive Small and Medium Enterprises in Malaysia. Applied Mechanics and Materials, 773-774(2015), pp.799–803. Available at: http://www.scientific.net/AMM.773-774.799. 108. Hudin, N., Abdul Hamid, A.B. and Thoo, C., 2015. Determinants of Risk Management Adoption in Organisations and Supply Chains. Applied Mechanics and Materials, 773-774(2015), pp.804–808. Available at: http://www.scientific.net/AMM.773-774.804. 109. Huijbers, R., Lemmens, F., Senders, B., Simons, S., Spaan, B., Tilburg, P., and Vossen, K., 2004. Software Project Management: Methodologies & Techniques (report). 110. IEEE, 2011. IEEE Guide — Adoption of the Project Management Institute (PMI ®) Standard A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) fourth., The Institute of Electrical and Electronics Engineers, Inc. 111. IEEE, 2009. Why Software Fails. IEEE Spectrum Magazine. 112. Ir.Wahidin, W., 2009. Chapter3: Membership Function. In knowledge based systems. Teknik Elektro Universitas Indonesia, p. 14. 113. Islam, S., 2009. Software Development Risk Management Model- a goal-driven approach. Technische Universitat Munchen Institut fur Informatik. 114. Islam, S., Mouratidis, H. and Weippl, E., 2014. An empirical study on the implementation and evaluation of a goal-driven software development risk management model. Information and Software Technology, 56(2), pp.117–133. 115. Jalote, P., 2008. A Concise Introduction to Software Engineering, Springer-Verlag London Limited. 116. Jalote, P., 2002. Software Project Management in Practice, Addison Wesley. 117. Jiang, G. and Chen, Y., 2004. Coordinate metrics and process model to manage software project risk. In IEEE International Engineering Management Conference. pp. 865–869. 118. Jianga, J., Kleinb, G., Chenc, H., and Lind, L., 2002. Reducing user-related risks during and prior to system development. International Journal of Project Management, 20(7), pp.507–515. 119. Jin, J. and Li, B., 2009. Cooperative multicast scheduling with random network coding in WiMAX. In 2009 17th International Workshop on Quality of Service. pp. 1–9. 120. Jin, X. and Xu, X., 2012. Rmote sensing of leaf water content for winter wheat using grey relational analysis (GRA), stepwise regression method (SRM) and partial least squares (PLS). In First International Conference on Agro- Geoinformatics (Agro-Geoinformatics). pp. 1–5. 121. John Horch, 2003. Practical Guide to Software Quality Management, Artech House, Inc. 122. Johnson, P., 2012. Multicollinearity in Regression. In Center for Research Methods and Data Analysis, University of Kansas. pp. 1–123. 123. Jones, C., 2008. Applied Software Measurement Global Analysis of Productivity and Quality Third., McGraw-Hill Companies. 124. Jones, C., 2009. errors and omissions in software historical data: separating fact from fiction, Jones Capers& Associates LLC. 125. Jones, C., 2010. Software Engineering Best Practices:Lessons from Successful Projects in the Top Companies, McGraw-Hill Companies. 126. Jun, Z., Hongwei, Z. and Yingjia, L., 2015. Clean Development Mechanism and Its Risk Management Policy in Urban Infrastructure Construction. International Journal of Security and Its Applications, 9(7), pp.37–48. 127. Kamaruddin, A., 2006. Development of an Early Software Project Risk Assessment Application Using Case-Based Reasoning. Universiti Teknologi MARA. 128. Kan, S., 2002. Metrics and Models in Software Quality Engineering Second., Addison Wesley. 129. Kanane, A., 2014. Challenges related to the adoption of Scrum. 130. Kandt, R., 2003. Software Requirements Engineering: Practices and Techniques, 131. Kanjanasanpetch, P. and Igel, B., 2003. Managing knowledge in Enterprise Resource Planning (ERP) Implementation. In Managing Technologically Driven Organizations: The Human Side of Innovation and Change, Engineering Management Conference, IEMC ’03. pp. 30–35. 132. Kasurinen, J., Taipale, O. and Smolander, K., 2010. Test Case Selection and Prioritization: Risk-Based or. In Proceedings of the 2010 ACM-IEEE International Symposium on Empirical Software Engineering and Measurement ESEM ’10. pp. 1–10. 133. Kaur, R. and Malhotra, N., 2013. Estimating the Effects of Developing Wrong Software Functions using Fuzzy Cognitive Map. International Journal of Computer Applications, 70(18), pp.38–41. 134. Keil, M., Cule, P., Lyytinen, K., and Schmidt, R., 1998. A framework for Identifying Software Project Risks. Communications of the ACM, 41(11), pp.76–83. 135. Keil, M., Li, L., Mathiassen, L., and Zheng, G., 2008. The influence of checklists and roles on software practitioner risk perception and decision-making. Journal of Systems and Software, 81(6), pp.908–919. 136. Keil, M., Tiwana, A. and Bush, A., 2002. Reconciling user and project manager perceptions of IT project risk: A Delphi study. Information Systems Journal, 12(2), pp.103–119. 137. Kendall, R., Post, D., Carver, J., Henderson, D., and Fisher, D., 2007. A Proposed Taxonomy for Software Development Risks for High-Performance Computing (HPC) Scientific / Engineering Applications. 138. Kerzner, H., 2009. Project Management: A Systems Approach to Planning, Scheduling, and Controlling 10th ed., John Wiley & Sons. 139. Kettunen, P. and Laanti, M., 2004. How to steer an embedded software project: tactics for selecting the software process model. Information and Software Technology, 47(2005), pp.587–608. Available at: http://linkinghub.elsevier.com/retrieve/pii/S0950584904001703 [Accessed February 20, 2011]. 140. Khanfar, K., Elzamly, A., Al-Ahmad, W., El-Qawasmeh, E., Alsamara, K., and Abuleil, S., 2008. Managing Software Project Risks with the Chi-Square Technique. International Management Review, 4(2), pp.18–29. 141. Kontio, J., 1999. Risk Management in Software Development: A Technology Overview and the Riskit Method. In ICSE ’99 Proceedings of the 21st international conference on Software engineering. pp. 679–680. 142. Kontio, J., 2001. Software Engineering Risk Management: A Method, Improvement Framework, and Empirical Evaluation. Suomen Laatukeskus / The Center for Excellence Purotie. 143. Kossiakoff, A., Sweet, W., Semour, S., and Biemer, S., 2011. Systems Engineering Principles and Practice second., John Wiley & Sons, Inc. 144. Kouskouras, K. and Georgiou, A., 2007. A discrete event simulation model in the case of managing a software project. European Journal of Operational Research, 181(1), pp.374–389. 145. Kumar, J., Mandala, A., Chaitanya, M., and Prasad, G., 2011. Fuzzy logic for Software Effort Estimation Using Polynomial Regression as Firing Interval. IJCTA, 2(6), pp.1843–1847. 146. Kumar, R., 2002. Managing risks in IT projects: an options perspective. Information & Management, 40(1), pp.63–74. 147. Kweku Ewusi-Mensah, 2003. Software Development Failures: Anatomy of Abandoned Projects, The MIT Press. 148. Laplante, P., 2004. Real-Time Systems Design and Analysis third., A John Wiley & Sons, INC. 149. Laplante, P. and Ovaska, S., 2005. Chapter 1: Introduction. In Real-time Systems Design and analysis. Wiley-Blackwell, p. 53. 150. Lau, L., 2005. Managing Business with SAP: Planning, Implementation, and Evaluation, Idea Group Publishing. 151. Layton, R., Smith, J., Macdonald, P., Letchumanan, R., Keese, P., and Lema, M., 2015. Building better environmental risk assessments. Frontiers in Bioengineering and Biotechnology, Jul. 152. Lee, S., 2011. Probabilistic Risk Assessment for Security Requirements: A Preliminary Study. In Fifth International Conference on Secure Software Integration and Reliability Improvement. pp. 11–20. 153. Li, M., Yu, S., Cao, N., and Lou, W., 2013. Privacy-Preserving Distributed Profile Matching in Proximity-Based Mobile Social Networks. IEEE Transactions on Wireless Communications, 12(5), pp.2024– 2033. 154. Lientz, B. and Larssen, L., 2006. Risk Management for IT Projects: How to Deal with Over 150 Issues and Risks, Elsevier Inc. 155. Lin, J., Zhuang, Q. and Huang, C., 2012. Fuzzy Statistical Analysis of Multiple Regression with Crisp and Fuzzy Covariates and Applications in Analyzing Economic Data of China important. Computational Economics, 39(1), pp.29–49. 156. Linberg, K., 1999. Software developer perceptions about software project failure: A case study. The Journal of Systems and Software, 49(2-3), pp.177–192. 157. Liu, D., Wang, Q. and Xiao, J., 2009. The role of software process simulation modeling in software risk management: A systematic review. In Third International Symposium on Empirical Software Engineering and Measurement. pp. 302–311. 158. Liu, J., Chen, H., Chen, C., and Sheu, T., 2011. Relationships among interpersonal conflict, requirements uncertainty, and software project performance. International Journal of Project Management, 29(5), pp.547–556. 159. Liu, J., Chen, V., Chan, C., and Lie, T., 2008. The impact of software process standardization on software flexibility and project management performance: Control theory perspective. Information and Software Technology, 50(9-10), pp.889–896. 160. Lu, X. and Ma, Q., 2004. Risk analysis in software development project with owners and contractors. In IEEE International Engineering Management Conference. pp. 789–793. 161. Lyons, T. and Skitmore, M., 2004. Project risk management in the Queensland engineering construction industry: A survey. International Journal of Project Management, 22(1), pp.51–61. 162. Ma, W., Liu, L., Feng, W., Shan, Y., and Peng, F., 2009. Analyzing project risks within a cultural and organizational setting. In ICSE Workshop on Leadership and Management in Software Architecture. pp. 6–14. 163. Macdonell, S. and Gray, A., 1996. Alternatives to Regression Models for Estimating Software Projects. In In Proceedings of the IFPUG Fall Conference. Dallas TX, IFPUG. pp. 279.1–279.15. 164. Madhavji, N., Fernandez, J. and Perry, D., 2006. Software Evolation and Feedback, John Wiley & Sons Ltd. 165. Maglyas, A., 2009. Evaluating The Success of Software Development Projects in Russia, Ukraine, and Belarus. Lappeenranta University of Technology. 166. Martin, C., Pasquier, J., M., C., and T., A., 2005. Software Development Effort Estimation Using Fuzzy Logic: A Case Study. In Proceedings of the Sixth Mexican International Conference on Computer Science (ENC’05). pp. 113–120. 167. Marza, V. and Seyyedi, M., 2009. Fuzzy Multiple Regression Model for Estimating Software Development Time. , 1(2), pp.31–34. 168. Masticola, S., 2007. A Simple Estimate of the Cost of Software Project Failures and the Breakeven Effectiveness of Project Risk Management. In First International Workshop on the Economics of Software and Computation(ESC’07). p. 6. 169. McConnell, S., 1996. Rapid Development: Taming Wild Software Schedules, Microsoft Press. 170. McNair, P., 2001. Controlling risk. ACM Magazine Ubiquity, 2001(January). 171. Mela, C. and Kopalle, P., 2002. The impact of collinearity on regression analysis : the asymmetric eVect of negative and positive correlations. Applied Economics,, 34, p.667-677. 172. Melnick, E. and Everitt, B., 2008. Encyclopedia of Quantitative Risk Analysis and Assessment E. L. Melnick & B. S. Everitt, eds., Chichester, UK: John Wiley & Sons, Ltd. 173. Melo, A., Tavares, E., Marinho, M., Sousa, E., Nogueira, B., and Maciel, P., 2013. Development Risk Assessment in Software Projects using Dependability Models. In 2013 IEEE 16th International Conference on Computational Science and Engineering Development. pp. 260–267. 174. Melo, A. and Sanchez, A., 2008. Software maintenance project delays prediction using Bayesian Networks. Expert Systems with Applications, 34(2), pp.908–919. Available at: http://linkinghub.elsevier.com/retrieve/pii/S0957417406003526 [Accessed March 13, 2011]. 175. Menezes, J., Gusmão, C. and Moura, H., 2013. Defining Indicators for Risk Assessment in Software Development Projects. CLEI Electronic Journal, 16(1), pp.1–24. 176. Merna, T. and Al-thani, F., 2008. Corporate Risk Management second., John Wiley & Sons, Ltd. 177. Miler, J., 2005. A Method of Software Project Risk Identification and Analysis. Gdansk University of Technology. 178. Miler, J. and Górski, J., 2001. Implementing risk management in software projects. In 3rd National Conference on Software Engineering. pp. 1–10. 179. Miler, J. and Górski, J., 2004. Risk-driven Software Process Improvement - a Case Study. In 11th European Software Process Improvement Conference EuroSPI’2004. pp. 1–7. 180. Miler, J. and Górski, J., 2002. Supporting Team Risk Management in Software Procurement and Development Projects. In 4th National Conference on Software Engineering. pp. 1–15. 181. Miller, S., 2004. Best Practices for Software Projects - Requirements Scrubbing Best Practices for Software Projects - Requirements Scrubbing, 182. Miotto, O., Tan, T. and Brusic, V., 2005. Supporting the Curation of Biological Databases with Reusable Text Mining. Genome Informatics, 16(2), pp.32–44. 183. Moohebat, M., Asemi, A. and Jazi, M., 2010. A Comparative Study of Critical Success Factors (CSFs) in Implementation of ERP in Developed and Developing Countries. International Journal, 2(5), pp.99–110. 184. Moorthy, J., Ibrahim, S. and Mahrim, M., 2014. Identification of Usability Risk in Software Development Projects. International Journal of Software Engineering and Technology, 1(2), pp.7–12. 185. Muller, M., Bezuidenhout, M. and Jooste, K., 2006. Health Care Service Management, Juta and Company Ltd. 186. Munch, J. and Heidrich, J., 2004. Software project control centers: concepts and approaches. Journal of Systems and Software, 70(1-2), pp.3–19. 187. Na, K., Simpson, J., Li, X., Singh, T., and Kim, K., 2007. Software development risk and project performance measurement: Evidence in Korea. Journal of Systems and Software, 80(4), pp.596–605. 188. Nagpal, G., Uddin, M. and Kaur, A., 2014. Grey Relational Effort Analysis Technique Using Regression Methods for Software Estimation. The International Arab Journal of Information Technology, 11(5), pp.437–446. 189. Naik, K. and Priyadarshi Tripathy, 2008. Software Testing and Quality Assurance: Theory and Practice, Wiley-Spektrum. 190. Nakatsu, R. and Iacovou, C., 2009. A comparative study of important risk factors involved in offshore and domestic outsourcing of software development projects: A two-panel Delphi study. Information & Management, 46(1), pp.57–68. 191. Ngai, E. and Wat, F., 2005. Fuzzy decision support system for risk analysis in E-commerce development. Decision Support Systems, 40(2), pp.235–255. 192. Nikbakht, Z. and Nikbakht, L., 2011. The Analysis of Bilateral Trade: The Case of D8. Business Intelligence Journal, 4(1), pp.179–186. 193. Oda, M., 2011. The Characteristics of the use of Twitter by Beginners: Study of the applicability to the e-healthcare. In International Conference on Systems, Man, and Cybernetics (SMC), IEEE. pp. 1268–1273. 194. Oracle, 2010. A Standardized Approach to Risk Improves Project Outcomes and Profitability. 195. Oracle, 2009. More Realistic Estimating: Separating Risks and Opportunities from Uncertainty. 196. Padayachee, K., 2002. An Interpretive Study of Software Risk Management Perspectives. In annual research conference of the South African institute of computer scientists and information technologists on Enablement through technology. pp. 118 –127. 197. Pandian, C., 2007. Applied software risk management: A guide for software project managers, Auerbach Publications is an imprint of the Taylor & Francis Group. 198. Paré, G., Sicotte, C., Jaana, M., and Girouard, D., 2008. Prioritizing Clinical Information System Project Risk Factors: A Delphi Study. In Proceedings of the 41st Hawaii International Conference on System Sciences. pp. 1–10. 199. Peppen, A. and Ploeg, M., 2000. Practicing What We Teach: Quality Management of Systems-Engineering Education. IEEE Transactions on Systems, Man, and Cybernetics-Part C: Applications and Reviews, 30(2), pp.189–196. 200. Persohn, K. and Brylow, D., 2011. Interactive Real-Time Embedded Systems Education Infused with Applied Internet Telephony. In 35th IEEE Annual Computer Software and Applications Conference. pp. 199–204. 201. Persson, J., Mathiassen, L., Boeg, J., Madsen, T., and Steinson, F., 2009. Managing Risks in Distributed Software Projects: An Integrative Framework. IEEE Transactions on Engineering Management, 56(3), pp.508–532. 202. Popescu, C. and Giuclea, M., 2007. A model of multiple linear regression. the publishing house of the romanian academy, 8(2), pp.1–8. 203. Puntambekar, A., 2009. Software Engineering, Technical Publications. 204. Remenyi, D. and Heafield, A., 1996. Business process re-engineering: some aspects of how to evaluate and manage the risk exposure. International Journal of Project Management, 14(6), pp.349–357. 205. Reyes, F., Cerpa, N., Candia, A., and Bardeen, M., 2011. The optimization of success probability for software projects using genetic algorithms. Journal of Systems and Software, 84(5), pp.775–785. 206. Rodriguez-Repisoa, L., Setchib, R. and Salmeronc, J., 2007. Modelling IT projects success: Emerging methodologies reviewed. Technovation, 27(10), pp.582–594. 207. Ropponen, J. and Lyytinen, K., 2000. Components of software development risk: how to address them? A project manager survey. IEEE Transactions on Software Engineering, 26(2), pp.98–112. 208. Rout, N., Parida, N. and Mishra, S., 2013. Software Risk Management and Mitigation Model. International Journal of Application or Innovation in Engineering & Management (IJAIEM), 2(7), pp.545–549. 209. Rudd, C., 2010. Planning to Implement Service Management (PISM), TSO (The Stationery Office). 210. Rui-ge, L. and Bing-rong, W., 2011. The Correlation Influence Factors Analysis in the Initial dosage of Insulin Therapy of Diabetes. In Second International Conference on Mechanic Automation and Control Engineering (MACE). pp. 774–777. 211. Sarfraz, F., 2009. Managing for a successful project closure. In PICMET ’09 - 2009 Portland International Conference on Management of Engineering & Technology. pp. 1392–1395. 212. Sarigiannidis, L. and Chatzoglou, P., 2011. Software Development Project Risk Management: A New Conceptual Framework. Journal of Software Engineering and Applications, 04(05), pp.293–305. 213. Savolainen, P., Ahonen, J. and Richardson, I., 2012. Software development project success and failure from the supplier’s perspective: A systematic literature review. International Journal of Project Management, 30(4), pp.458–469. 214. Schmidt, R., Lyytinen, K., Keil, M., and Cule, P., 2001. Identifying Software Project Risks: An International Delphi Study. Journal of Managemen Information Systems, 17(4), pp.5–36. 215. Schulmeyer, G., 2008. Handbook of Software Quality Assurance Fourth., Artech House, INC. 216. Schwalbe, K., 2010. Information Technology Project Management sixth., Course Technology, Cengage Learning. 217. Selby, R., 2007. Software Engineering: Barry W. Boehm’s Lifetime Contributions to Software Development, Management, and Research (Practitioners) 1 edition., Wiley-IEEE Computer Society. 218. Sentas, P., Angelis, L. and Stamelos, I., 2003. Multinomial Logistic Regression Applied on Software Productivity Prediction. In 9th Panhellenic conference in informatics. pp. 1–12. 219. Shand, R., 1994. User Manuals as Project Management Tools: Part II-Practical Applications. IEEE Transaction on Professional Communication, 31(3), pp.123–142. 220. Sharif, A. and Basri, S., 2011. A Study on Risk Assessment for Small and Medium Software Development Projects. International Journal of New Computer Architectures and their Applications (IJNCAA), 1(2), pp.325–335. 221. Smith, N., Merna, T. and Jobling, P., 2006. Managing risk in construction projects Second., Blackwell Publishing. 222. Sodhi, J. and Sodhi, P., 2001. IT Project Management Handbook, Management Concepts. 223. SQAS, 2000. Software Risk Management A Practical Guide., 224. Stensrud, E., Foss, T., Kitchenham, B., and Myrtveit, I., 2003. A Further Empirical Investigation of the Relationship Between MRE and Project Size. Empirical Software Engineering, 8(2), pp.139–161. 225. Stephens, M. and Rosenberg, D., 2010. Design Driven Testing: Test Smarter, Not Harder, Matt Stephens and Doug Rosenberg. 226. Stine, R., 2001. Collinearity and Multiple Regression. In pp. 1–11. 227. Strawbridge, C., 2005. Project Management in Large Collaborations: SNS Lessons Learned for ITER. In Twenty-First IEEE/NPS Symposium on Fusion Engineering. pp. 1–5. 228. Sudhakar, G., 2010. Elements of Software Project Management, Prentice-Hall of India Pvt. Ltd. 229. Sumner, M., 2000. Risk factors in enterprise-wide/ERP projects. Journal of Information Technology, 15(4), pp.317–327. 230. Surie, D., 2004. Evaluation and Integration of Risk Management in CMMI and ISO / IEC 15504. In 8th Student Conference in Computing Science, Umeå, Sweden. p. 14. 231. Syed, F., Sultan, K. and Javed, A., 2013. An Enhanced Action Research Approach for Managing Risks in Software Process Improvement. I.J.Modern Education and Computer Science, 2013(6), pp.24–30. 232. Taimour, A., 2005. Why IT Projects Fail (report), Available at: www.projectperfect.com.au/downloads/Info/info_it_projects_fail.pd. 233. Talet, A., Mat-zin, R. and Houari, M., 2014. Risk Management and Information Technology Projects. International Journal of Digital Information and Wireless Communications (IJDIWC), 4(1), pp.1–9. 234. Taylor, J., 2004. Managing Information Technology Projects: Applying Project Management Strategies to Software, Hardware, and Integration Initiatives, AMACOM © 2004. 235. Tayntor, C., 2006. Successful Packaged Software Implementation, AUERBACH Publications, Taylor & Francis Group, LLC. 236. Tesch, D., Kloppenborg, T. and Frolick, M., 2007. IT Project Risk Factors: The Project Management Professionals Perspective. Journal of Computer Information Systems, 47(4), pp.61–70. 237. Thomas, S. and Hansmann, U., 2010. Agile Software Development: Best Practices for Large Software Development Projects, Springer-Verlag Berlin Heidelberg. 238. Tomanek, M. and Juricek, J., 2015. Project Risk Management Model Based On Prince2 And Scrum Frameworks. International Journal of Software Engineering & Applications (IJSEA), 6(1), pp.81–88. 239. Tomczyk, C., 2005. Project Manager’s Spotlight on Planning, SYBEX Inc. 240. Tsui, F., 2004. Managing Software Projects, Jones and Bartlett Publishers, Inc. 241. Tummala, V. and John, B., 1999. Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project. International Journal of Project Management, 17(4), pp.223–235. 242. V, N. and Iyakutti, K., 2014. Bayesian Statistics Software Approach For Risk Control on Complex Software Projects. international journal of engineering research and technology, 3(12), pp.1062–1068. 243. Vaidyanathan, G. and Devaraj, S., 2003. A five-factor framework for analyzing online risks in e-businesses. Communications of the ACM, 46(12), p.354. 244. Varanasi, U. and Prasad, B., 2015. A Framework for Auditing the Evaluation of Uncertainty for Compliance in Information Systems. Lecture Notes on Software Engineering, 3(1), pp.40–43. 245. Veracode, 2008. IT Risk Management: Guide to Software Risk Assessments and Audits. Information Systems Veracode, p.9. 246. Verner, J., Cox, K. and Bleistein, S., 2006. Predicting good requirements for in-house development projects. In Proceedings of the 2006 ACM/IEEE international symposium on International symposium on empirical software engineering - ISESE ’06. New York, New York, USA: ACM Press, pp. 154–163. 247. Walewski, J., 2003. International Project Risk Assessment: Methods, Procedures, and Critical Factors. The University of Texas at Austin. 248. Wallace, L. and Keil, M., 2004. Software project risks and their effect on outcomes. Communications of the ACM, 47(4), pp.68–73. 249. Wallace, L., Keil, M. and Rai, A., 2004. Understanding software project risk: A cluster analysis. Information & Management, 42(1), pp.115–125. 250. Wallace, M. and Webber, L., 2006. IT Policies & Procedures: Tools & Techniques That Work (IT Governance Policies & Procedures), Aspen Publishers. 251. Wasser, B., 2011. 7 Reasons Why Employers Should Conduct An Internal Immigration Audit (report). 252. Webern, P., Medina-Oliva, G., Simon, C., and Iung, B., 2010. Overview on Bayesian networks applications for dependability, risk analysis and maintenance areas. Engineering Applications of Artificial Intelligence, 42(1), pp.115–125. 253. Westfall, L., 2006. Software Requirements Engineering: What, Why, Who, When, and How (report). 254. Westfall, L., 2001. Software Risk Management (report). 255. Wong, B. and Tein, D., 2004. Critical Success Factors for ERP Projects. Journal of the Australian Institute of Project Management, 24(1), pp.28–31. 256. Wu, T., Blackhurst, J. and Chidambaram, V., 2006. A model for inbound supply risk analysis. Computers in Industry, 57(4), pp.350–365. 257. Yahaya, J., Hamzah, N. and Deraman, A., 2014. Evaluating Vendor ’ s Performance in Outsource Software Development Risks Using Analytic Hierarchy Process Technique. In 2014 8th Malaysian Software Engineering Conference (MySEC). pp. 61–66. 258. Yassin, A., 2010. Organizational Information Markets: Conceptual Foundation and an Approach for Software Project Risk Management. University of South Florida. 259. Yogesan, K., Brett, P. and Gibbons, M., 2009. Handbook of Digital Homecare Series in Biomedical Engineering, Springer-Verlag Berlin Heidelberg. 260. Zafra-Cabeza, A., Ridao, M. and Camacho, E., 2004. An algorithm for optimal scheduling and risk assessment of projects. Control Engineering Practice, 12(10), pp.1329–1338. 261. Zhou, N., Pierre, J. and Trudnowski, D., 2012. A Stepwise Regression Method for Estimating Dominant Electromechanical Modes. IEEE Transactions on Power Systems, 27(2), pp.1051–1059.