Development Of Overall Performance Effectiveness In Job Shop Manufacturing Process
Overall equipment effectiveness (OEE) is implemented by the case company,an aerospace part manufacturing company, to encourage machines to operate all the time at the ideal speed and produce no quality defect in extreme case.However,integration between workstations and transporting activities,deviat...
Saved in:
Main Author: | Teoh, Yong Siang |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2018
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/23380/1/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf http://eprints.utem.edu.my/id/eprint/23380/2/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Customer demand and planning efficiency in overall equipment effectiveness (OEE)
by: Teoh, Yong Siang
Published: (2013) -
Implementation of overall equipment effectiveness in surface mounting technology
by: V. Nanjan, Davandran
Published: (2019) -
Optimization-based simulation algorithm for predictive-reactive job-shop scheduling of reconfigurable manufacturing systems
by: Tan, Joe Yee
Published: (2022) -
Measuring Overall Equipment Effectiveness Of Pressure Die Casting Machine
by: Jiga, Elnie Carina
Published: (2019) -
New overall equipment effectiveness framework development with integration of maynard operation sequence technique for losses visualization
by: Yoong, Sai Sieng
Published: (2018)