Development Of Overall Performance Effectiveness In Job Shop Manufacturing Process
Overall equipment effectiveness (OEE) is implemented by the case company,an aerospace part manufacturing company, to encourage machines to operate all the time at the ideal speed and produce no quality defect in extreme case.However,integration between workstations and transporting activities,deviat...
Saved in:
主要作者: | Teoh, Yong Siang |
---|---|
格式: | Thesis |
语言: | English English |
出版: |
2018
|
主题: | |
在线阅读: | http://eprints.utem.edu.my/id/eprint/23380/1/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf http://eprints.utem.edu.my/id/eprint/23380/2/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Customer demand and planning efficiency in overall equipment effectiveness (OEE)
由: Teoh, Yong Siang
出版: (2013) -
Implementation of overall equipment effectiveness in surface mounting technology
由: V. Nanjan, Davandran
出版: (2019) -
Optimization-based simulation algorithm for predictive-reactive job-shop scheduling of reconfigurable manufacturing systems
由: Tan, Joe Yee
出版: (2022) -
Measuring Overall Equipment Effectiveness Of Pressure Die Casting Machine
由: Jiga, Elnie Carina
出版: (2019) -
New overall equipment effectiveness framework development with integration of maynard operation sequence technique for losses visualization
由: Yoong, Sai Sieng
出版: (2018)