New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System

The main purpose of the research work is to solve the persistent infrastructure project issue such as variation order (VO) issue, and project delay issue. It has been occurring in the project for over quite a long period of time. In infrastructure project, failed to make a reliable project report wi...

Full description

Saved in:
Bibliographic Details
Main Author: M Saleh, Hisamuddin
Format: Thesis
Language:English
English
Published: 2019
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/24516/1/New%20Solution%20For%20ICT%2CELV%20Infrastructure%20Project%20Reporting%20Using%20Datalink%20Technique%20System.pdf
http://eprints.utem.edu.my/id/eprint/24516/2/New%20Solution%20For%20ICT%2CELV%20Infrastructure%20Project%20Reporting%20Using%20Datalink%20Technique%20System.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utem-ep.24516
record_format uketd_dc
institution Universiti Teknikal Malaysia Melaka
collection UTeM Repository
language English
English
advisor Hussain, Mohd Nor

topic T Technology (General)
spellingShingle T Technology (General)
M Saleh, Hisamuddin
New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
description The main purpose of the research work is to solve the persistent infrastructure project issue such as variation order (VO) issue, and project delay issue. It has been occurring in the project for over quite a long period of time. In infrastructure project, failed to make a reliable project report will lead to an issue on VO and project delay happen. It has become a normal phenomenon in which issue has led to many negative effects such as cases of lawsuits, poor productivity, revenue loss, and contract termination among all parties involved. Therefore, to overcome this problem, the latest solution system known as Datalink Technique System (DTS) has been developed. It has been tested and applied in one of the government projects in Malaysia. It has turned out with positive results as compared to the existing one. It has been able to deliver reliable information, and yet it is still consistent with the current approach to manage the project. There are two main objectives have been achieved in this thesis. The first is to eliminate the loss and save the project cost by reducing the VO issue and project delay issue in the Information Communication Technology (ICT) work and Extra Low Voltage (ELV) work, but it is not limited to that, in future it can be applied to other infrastructure works like mechanical and electrical (M&E), civil works, and etc.. The second objective is to make the project report more transparent in the monthly project reporting that presented to project management. This to prevent the report from being manipulated by contractors as happened to other projects before. A methodology for system approach is proposed and demonstrated for solution purposes. The process began with a comprehensive issue on VO and followed by project delay factor phenomena. The problem and the main factors that caused the issue is identified and data acquisition based on actual problems that happened in the project. The performance and limitations of conventional methods are studied thoroughly to discover solutions with new more effective methods. The system approach is served by implementing the DTS system in one of the selected infrastructure projects. A pilot project has been implemented at Kota Kinabalu Sabah new court complex project is to evaluate the credibility and actual capabilities of the DTS system. It has contributed a good result for the project, and many benefits have been derived from the implementation. From the result, the bad performance that the team can tolerate could be derived from the equation of the percentage of completion versus the duration of working days, Y = a1x-b1, where b1 is the value of the bad performance of the system which is measured as below 34%. To support the validation of the result, the actual copy of the report is attached together. The new system has several advantages compared to the existing conventional process method. It helps in reducing the loss in project costing, provide a reliable progress report to the client while able to convey information of project tasks instantly and accurately.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author M Saleh, Hisamuddin
author_facet M Saleh, Hisamuddin
author_sort M Saleh, Hisamuddin
title New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
title_short New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
title_full New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
title_fullStr New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
title_full_unstemmed New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
title_sort new solution for ict/elv infrastructure project reporting using datalink technique system
granting_institution Universiti Teknikal Malaysia Melaka
granting_department Faculty of Electronic and Computer Engineering
publishDate 2019
url http://eprints.utem.edu.my/id/eprint/24516/1/New%20Solution%20For%20ICT%2CELV%20Infrastructure%20Project%20Reporting%20Using%20Datalink%20Technique%20System.pdf
http://eprints.utem.edu.my/id/eprint/24516/2/New%20Solution%20For%20ICT%2CELV%20Infrastructure%20Project%20Reporting%20Using%20Datalink%20Technique%20System.pdf
_version_ 1747834072858624000
spelling my-utem-ep.245162021-10-05T10:17:33Z New Solution For ICT/ELV Infrastructure Project Reporting Using Datalink Technique System 2019 M Saleh, Hisamuddin T Technology (General) The main purpose of the research work is to solve the persistent infrastructure project issue such as variation order (VO) issue, and project delay issue. It has been occurring in the project for over quite a long period of time. In infrastructure project, failed to make a reliable project report will lead to an issue on VO and project delay happen. It has become a normal phenomenon in which issue has led to many negative effects such as cases of lawsuits, poor productivity, revenue loss, and contract termination among all parties involved. Therefore, to overcome this problem, the latest solution system known as Datalink Technique System (DTS) has been developed. It has been tested and applied in one of the government projects in Malaysia. It has turned out with positive results as compared to the existing one. It has been able to deliver reliable information, and yet it is still consistent with the current approach to manage the project. There are two main objectives have been achieved in this thesis. The first is to eliminate the loss and save the project cost by reducing the VO issue and project delay issue in the Information Communication Technology (ICT) work and Extra Low Voltage (ELV) work, but it is not limited to that, in future it can be applied to other infrastructure works like mechanical and electrical (M&E), civil works, and etc.. The second objective is to make the project report more transparent in the monthly project reporting that presented to project management. This to prevent the report from being manipulated by contractors as happened to other projects before. A methodology for system approach is proposed and demonstrated for solution purposes. The process began with a comprehensive issue on VO and followed by project delay factor phenomena. The problem and the main factors that caused the issue is identified and data acquisition based on actual problems that happened in the project. The performance and limitations of conventional methods are studied thoroughly to discover solutions with new more effective methods. The system approach is served by implementing the DTS system in one of the selected infrastructure projects. A pilot project has been implemented at Kota Kinabalu Sabah new court complex project is to evaluate the credibility and actual capabilities of the DTS system. It has contributed a good result for the project, and many benefits have been derived from the implementation. From the result, the bad performance that the team can tolerate could be derived from the equation of the percentage of completion versus the duration of working days, Y = a1x-b1, where b1 is the value of the bad performance of the system which is measured as below 34%. To support the validation of the result, the actual copy of the report is attached together. The new system has several advantages compared to the existing conventional process method. It helps in reducing the loss in project costing, provide a reliable progress report to the client while able to convey information of project tasks instantly and accurately. 2019 Thesis http://eprints.utem.edu.my/id/eprint/24516/ http://eprints.utem.edu.my/id/eprint/24516/1/New%20Solution%20For%20ICT%2CELV%20Infrastructure%20Project%20Reporting%20Using%20Datalink%20Technique%20System.pdf text en public http://eprints.utem.edu.my/id/eprint/24516/2/New%20Solution%20For%20ICT%2CELV%20Infrastructure%20Project%20Reporting%20Using%20Datalink%20Technique%20System.pdf text en validuser https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=117151 phd doctoral Universiti Teknikal Malaysia Melaka Faculty of Electronic and Computer Engineering Hussain, Mohd Nor 1. Abd El-Razek ME, Bassioni HA, Mobarak A. M, 2008. Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering and Management, 11(2), pp. 45-50. 2. Abdul-Rahman, I., Memon, A.H. and Abd. Karim, A.T., 2013. Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia. Journal of Applied Sciences, 13(2), pp. 286-293. 3. Adel Issa Elsosan, 2015. “Time and Cost controlling using critical path method (case study at Palur Fly-over Surakarta),” Master Program of Civil Engineering Study Department, Universitas Muhammadiyah Surakarta. 4. Aftab Hameed Memon, Ismail Abdul Rahman and Mohamad Faris Abul Hasan, 2014. “Significant Causes and Effects of Variation Orders in Construction Projects,” Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, Malaysia, Research Journal of Applied Sciences, Engineering and Technology, 7(21), pp. 4494-4502. 5. Ahsan K, Gunawan I., 2010. Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28(1), pp. 68-78. 6. Aibinu AA, Odeyinka HA, 2006. Construction Delays and Their Causative Factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. 7. Al-Ghafly, M.A., 1995. Delays in the Construction of Public Utility Projects in Saudi Arabia. Master Thesis, CEM Dept., KFUPM, Dhahran, Saudi Arabia. 8. Ali S. Alnuaimi, Ph.D.1; Ramzi A. Taha, Ph.D.2; Mohammed Al Mohsin, Ph.D.3; and Ali S. Al-Harthi, 2010. “Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman,” M.Sc., J. Constr. Eng. Manage, 136, pp. 615-622. 9. Alinaitwe H, Apolot R, Tindiwensi D, 2013. Investigation into the Causes of Delays and Cost Overruns in Uganda’s Public Sector Construction Projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. 10. Alnuaimi, A., Taha, R., Al Mohsin, M. and Al-Harthi, A., 2010. Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615–622. 11. Arain, F.M., S.A. Assaf and S.P. Low, 2004. Causes of discrepancies between design and construction. Archit. Sci. Rev., 47(3), pp. 237-249. 12. Assaf, S.A., Al-Hejji S, 2006. Causes of delay in large construction projects. International Journal of Project Management, 24(4), pp. 349-357. 13. Aziz RF, Abdel-Hakam AA, 2016. Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), pp. 1515-1539. 14. Bagaya O, Song J, 2016. Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso. Journal of Management in Engineering, 32(5), pp. 501-601. 15. Batool A, Abbas F, 2017. Reasons for delay in selected hydro-power projects in Khyber Pakhtunkhwa KPK. Pakistan Renewable and Sustainable Energy Reviews, 73, pp. 196-204. 16. Chan DWM, Kumaraswamy MM, 1997. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), pp. 55-63. 17. Charoenngam, C., Coquinco, S. & Hadikusumo, B., 2003. "Web-based application for managing change orders in construction projects", Construction Innovation: Information, Process, Management, vol. 3, no. 4, pp. 197-215. 18. CII, 1986. Constructability: A Primer. Construction Industry Institute, University of Texas at Austin, TX. 19. CII, 1990a. The Impact of Changes on Construction Cost and Schedule. Publication 6-10, Construction Industry Institute, University of Texas at Austin, TX. 20. CII, 1990b. Scope Definition and Control. Publication 6-2, Construction Industry Institute, University of Texas at Austin, TX. 21. Clough, R.H. and G.A. Sears, 1994. Construction Contracting. 6th Edn., John Wiley and Sons Inc., New York. 22. Danso H, Antwi JK, 2012. Evaluation of the Factors Influencing Time and Cost Overruns in Telecom Tower Construction in Ghana. Civil and Environmental Research, 2(6), pp. 15–25. 23. Doloi H, Sawhney A, Iyer KC, Rentala S, 2012. Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), pp. 479-489. 24. Dubem I. Ikediashi, Stephen O. Ogunlana and Abdulaziz Alotaibi, 2014. Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach, Journal of Construction in Developing Countries, 19(1), pp. 35–52. 25. El-Razek, A. M. E., Bassioni, H. A., and Mobarak, A. M., 2008. Causes of delay in building construction projects in Egypt, Journal of Construction Engineering and Management, 134, pp. 831–841. 26. Enshassi A, Al-Najjar J, Kumaraswamy M, 2009. Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126–151. 27. Fallahnejad MH, 2013. Delay causes in Iran gas pipeline projects. International Journal of Project Management, 31(1), pp. 136-146. 28. Fisk, E.R., 1997. Construction Project Administration. 5th Edn., Prentice Hall, New Jersey. 29. Geok, O.S., 2002. Causes and improvement for quality problems in design and build projects. Unpublished B. Sc. Thesis, National University of Singapore. 30. Gray, C. and W. Hughes, 2001. Building Design Management. Butterworth Heinemann, Oxford, UK. 31. Gunduz M, Nielsen Y, Ozdemir M, 2013. Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering, 29(2), pp. 133-139. 32. Gunduz M, Nielsen Y, Ozdemir M, 2015. Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects. Journal of Management in Engineering, 31(4), pp. 401-405. 33. Hanna, A. and M. Gunduz, 2004. Impact of change orders on small labor-intensive projects. J. Constr. Eng. M. ASCE, 130(5), pp. 726-733. 34. Hanna, A.S.P.E., Calmic, R., Peterson, P.A., and Nordheim, E.V., 2002. Quantitative Definition of Projects Impacted By Change Orders. Journal of construction Engineering and Management, 128(1), pp. 57-64 35. Hanif, H., Khurshid, M.B., Malik, S. and Nauman, S., 2014. Causes of variation orders in construction of hydropower projects of Pakistan. Paper presented at the International Conference on Management and Engineering (CME 2014). Shanghai, China, 24–25 May 36. Harbans, S.K.S., 2003. Valuation of Varied Work: A Commentary, In: Buletin Ingenieur, The Board of Engineers Malaysia, 20(3), pp. 32-42. 37. Ibbs, C.W., C.K. Wong and Y.H. Kwak, 2001. Project change management system. J. Manage. Eng. ASCE, 17(3), pp. 159-165. 38. Ismail, A., Pourrostam, T., Soleymanzadeh, A. and Ghouyounchizad, M., 2012. Factors causing variation orders and their effects in roadway construction projects. Research Journal of Applied Sciences, Engineering and Technology, 4(23), pp. 4969–4972 39. Iyer KC, Jha KN, 2006. Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. 40. JLARC (Joint Legislative Audit and Review Commission), 2001. Review of Construction Costs and Time Schedules for Virginia Highway Projects. Retrieved from: http://jlarc.virginia. gov/reports/Rpt258.pdf. 41. Kaliba C, Muya M, Mumba K, 2009. Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), pp. 522-531. 42. Kamanga M, Steyn W, 2013. Causes of Delay in Road Construction Projects in Malawi. Journal of The South African Institution of Civil Engineering, 55(3), pp. 79-85. 43. Kamaruzzama SN, Ali AS, 2010. Cost Performance for Building Construction Projects in Klang Valley. Journal of Building Performance, 1(1), pp. 110–18. 44. Kazaz, A, Ulubeyli S, Tuncbilekli NA, 2012. Causes of Delays in Construction Projects in Turkey. Journal of Civil Engineering and Management, 18(3), pp. 426-435. 45. Koushki, P.A., Al-Rashid, K. & Kartam, N., 2005. Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait, Construction Management and Economics, 23(3), pp. 285- 294. 46. Mahamid I, Bruland A, Dmaidi N, 2012. Causes of Delay in Road Construction Projects. Journal of Management in Engineering, 28(3), pp. 300-310. 47. Marzouk MM, El-Rasas TI, 2014. Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research, 5(1), pp. 49-55. 48. Memon AH, Rahman IA, Azis AAA, 2012. Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia. International Journal of Advances in Applied Sciences (IJAAS), 1(1), pp. 45–52. 49. Mohamed, A.A., 2001. Analysis and Management of Change Orders for combined Sewer over flow construction projects, Dissertation, Wayne State University. 50. Mohammad, N., Che Ani, A.I., Rakmat, R.A.O.K. and Yusof, M.A., 2010. Investigation on the causes of variation orders in the construction of building project: A study in the state of Selangor, Malaysia. Journal of Building Performance, 1(1), pp. 73–82 51. Mokhtar, A., Bedard, C. & Fazio, P., 2000. " Collaborative planning and scheduling of interrelated design changes". Journal of Architectural Engineering, ASCE, Vol. 6, No.2, pp. 66-75. 52. Muhwezi, L., Acai, J., Otim, G., 2014. An Assessment of the Factors Causing Delays on Building Construction Projects in Uganda, International Journal of Construction Engineering and Management, 3(1), pp. 13-23. 53. O’Brien, J.J., 1998. Construction Change Orders. McGraw Hill, New York. 54. Sambasivan M, Soon YW, 2007. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), pp. 517-526. 55. Sanvido, V., K. Parfitt, M. Guvensia and M. Coyle, 1992. Critical success factors for construction projects. J. Constr. Eng. M. ASCE, 118(1), pp. 94-111. 56. Ssegawa,J.K.,Mfolwe,K.M., Makuke,B.,and Kutua,B., 2002. Construction Variation: A Scourge or a Necessity? Proceedings of the First International Conference of CIBW 107, 11-13, Nov., Cape Town, South Africa, pp. 87-96. 57. Zarabizan Zakaria, Syuhaida Ismail and Aminah MdYusof, 2012. Cause and Impact of Dispute and Delay the Closing of Final Account in Malaysia Construction Industry. 58. Journal of Southeast Asian Research. Vol. 2012(2012), Article ID 975385, DOI:10.5171/2012.975385.