Design And Simulation Of Automated Material Handling System For Automotive Assembly Process

Improvement of process parameters for effective and efficient material handling system in manufacturing industry has been studied extensively lately in view of observed increases in demand for high technology to increase production and profit. This thesis investigates an actual industrial problem re...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Saffar, Seha
Format: Thesis
Language:English
English
Published: 2019
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/24666/1/Design%20And%20Simulation%20Of%20Automated%20Material%20Handling%20System%20For%20Automotive%20Assembly%20Process.pdf
http://eprints.utem.edu.my/id/eprint/24666/2/Design%20And%20Simulation%20Of%20Automated%20Material%20Handling%20System%20For%20Automotive%20Assembly%20Process.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utem-ep.24666
record_format uketd_dc
institution Universiti Teknikal Malaysia Melaka
collection UTeM Repository
language English
English
advisor Jamaludin, Zamberi

topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Mohd Saffar, Seha
Design And Simulation Of Automated Material Handling System For Automotive Assembly Process
description Improvement of process parameters for effective and efficient material handling system in manufacturing industry has been studied extensively lately in view of observed increases in demand for high technology to increase production and profit. This thesis investigates an actual industrial problem relating to improvement in material supply system in production line and inventory system in a warehouse. A case study was selected as a method to collect data in actual industry situation. The study aims to assess the influence of automated material handling system in an automotive industry by proposing a new integrated system design by mean of numerical analysis on significant effect and influence on the system. The system performance of the proposed integrated design was measured and compared to the current system. The system design and analysis were performed using Quest software. The methodology consisted of six phases. Firstly, data were gathered from actual industry as a case study. These data served as guideline and offer input on design limitation of the proposed integrated system. Secondly, a design concept was proposed using standard principle of design consideration for manufacturing. A full factorial design with two levels of three factors was applied as the design of experiment to analyze the performance measure of the integrated system and the current system. This thesis concludes that the overall result shows that the bottleneck for transport system was reduced by about 87% and 85% reduced was observed for the storage system. The transport equipment was utilized 4 times greater than the current transport system. Due to increment in utilization, the production output increased four times from the current system. Overall result showed decrement in cycle time of 63% for model 4 compared to model 1. The constraint for this research work was the preparedness of manufacturing industry towards flexibilities and leans. For future improvement, the simulation clock can be set in order to establish appropriate environment and the transition distance of entities between movement and distance of each resource to the others are properly premeditated. Also, in-depth study on Quest software and additional study on Delmia v5 as alternative simulation tool can be considered for virtual 3D simulation with ergonomic human movement results and analysis.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Mohd Saffar, Seha
author_facet Mohd Saffar, Seha
author_sort Mohd Saffar, Seha
title Design And Simulation Of Automated Material Handling System For Automotive Assembly Process
title_short Design And Simulation Of Automated Material Handling System For Automotive Assembly Process
title_full Design And Simulation Of Automated Material Handling System For Automotive Assembly Process
title_fullStr Design And Simulation Of Automated Material Handling System For Automotive Assembly Process
title_full_unstemmed Design And Simulation Of Automated Material Handling System For Automotive Assembly Process
title_sort design and simulation of automated material handling system for automotive assembly process
granting_institution Universiti Teknikal Malaysia Melaka
granting_department Faculty Of Manufacturing Engineering
publishDate 2019
url http://eprints.utem.edu.my/id/eprint/24666/1/Design%20And%20Simulation%20Of%20Automated%20Material%20Handling%20System%20For%20Automotive%20Assembly%20Process.pdf
http://eprints.utem.edu.my/id/eprint/24666/2/Design%20And%20Simulation%20Of%20Automated%20Material%20Handling%20System%20For%20Automotive%20Assembly%20Process.pdf
_version_ 1747834083167174656
spelling my-utem-ep.246662021-10-05T11:20:31Z Design And Simulation Of Automated Material Handling System For Automotive Assembly Process 2019 Mohd Saffar, Seha T Technology (General) TS Manufactures Improvement of process parameters for effective and efficient material handling system in manufacturing industry has been studied extensively lately in view of observed increases in demand for high technology to increase production and profit. This thesis investigates an actual industrial problem relating to improvement in material supply system in production line and inventory system in a warehouse. A case study was selected as a method to collect data in actual industry situation. The study aims to assess the influence of automated material handling system in an automotive industry by proposing a new integrated system design by mean of numerical analysis on significant effect and influence on the system. The system performance of the proposed integrated design was measured and compared to the current system. The system design and analysis were performed using Quest software. The methodology consisted of six phases. Firstly, data were gathered from actual industry as a case study. These data served as guideline and offer input on design limitation of the proposed integrated system. Secondly, a design concept was proposed using standard principle of design consideration for manufacturing. A full factorial design with two levels of three factors was applied as the design of experiment to analyze the performance measure of the integrated system and the current system. This thesis concludes that the overall result shows that the bottleneck for transport system was reduced by about 87% and 85% reduced was observed for the storage system. The transport equipment was utilized 4 times greater than the current transport system. Due to increment in utilization, the production output increased four times from the current system. Overall result showed decrement in cycle time of 63% for model 4 compared to model 1. The constraint for this research work was the preparedness of manufacturing industry towards flexibilities and leans. For future improvement, the simulation clock can be set in order to establish appropriate environment and the transition distance of entities between movement and distance of each resource to the others are properly premeditated. Also, in-depth study on Quest software and additional study on Delmia v5 as alternative simulation tool can be considered for virtual 3D simulation with ergonomic human movement results and analysis. 2019 Thesis http://eprints.utem.edu.my/id/eprint/24666/ http://eprints.utem.edu.my/id/eprint/24666/1/Design%20And%20Simulation%20Of%20Automated%20Material%20Handling%20System%20For%20Automotive%20Assembly%20Process.pdf text en public http://eprints.utem.edu.my/id/eprint/24666/2/Design%20And%20Simulation%20Of%20Automated%20Material%20Handling%20System%20For%20Automotive%20Assembly%20Process.pdf text en validuser https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=116894 mphil masters Universiti Teknikal Malaysia Melaka Faculty Of Manufacturing Engineering Jamaludin, Zamberi 1. Agervald, O., 1980. Principer for Utformining av monteringssystem. Stockholm: metarforbundet. 2. Akincilar S. and Rad C., 2013. Material Handling System Design: A Case-Study in Bosch Rexroth Japan (Master Thesis). University Jonkoping, Sweden. 3. Amstead, B. H., Ostwarld P. F and Begemen M.L., 1979. Manufacturing Processes, 7th ed., pp. 33 - 35, New York: Wiley. 4. Anand, M., and Ashok, S., 2011. Modelling of a Linear Induction Motor for Automated Material Handling Application, Chennai and Dr.MGR University 2nd International Conference on Sustainable Energy and Intelligent System, Chennai, Tamil Nadu, India 20 – 22 July 2011, pp. 661–665. 5. Apple, J. M., 1977. Plant Layout and Material Handling, 3rd ed. New York: Wiley. 6. Arne I.T.Y.G, Bolmsjo S, 2005. Reducing Bottlenecks in a Manufacturing Systems with Automatic Data Collection and Discrete-Event Simulation, Journal of Manufacturing Technology Management, 16 (6), pp. 615 – 628. 7. Arnold, D. and Furmans, K., 2009. Materialfluss in Logistiksystemen. Berlin, Springer. 8. Asef-Vaziri, A. and Laporte, G., 2005. Loop Based Facility Planning and Material Handling. European Journal of Operational Research, Issue 164, pp. 1–11. 9. Baechler A., Baechler L., Autenrieth S., Kurts P., Hoerz T., Heidenreich T., Kruell G., 2016. A Comparative Study of an Assistance System for Manual Order Picking – Called Pick-by-Projection – with the Guiding Systems Pick-by-Paper, Pick-by-Light and Pick-by-Display. Proceedings of the 49th Annual Hawaii International Conference on System Sciences, pp. 523 – 531. IEEE Computer Society Publisher. 10. Banks J., Carson J. S., Nelson B. L., and Nicol D. M., 2004. Discrete-Event Simulation. 4th Ed. Upper Saddle River, New Jersey:Prentice-Hall Incorporated. 11. Bellgran M. and Safsten K., 2004. Production System Design and Evaluation for Increased System Robustness. Second World Conference on POM and 15th Annual POM Conference, Cancun, Mexico. 12. Benita, M., 1998. Supply Chain Design and Analysis: Models and Methods. Internation Journal of Production Economics, vol. 55, pp. 281-294. 13. Berg, Van den J. P., Zijm W. H. M., 1999. Models for Warehouse Management: Classification and Examples. International Journal of Production Economics, vol. 59, pp. 219 – 528. 14. Bloss, R., 2010. Automated Assembly Innovations at the 2009 Assembly Expo. Assembly Automation, 30 (4), pp. 313 – 316. 15. Boaduo, P., and Adu, N. 2011. Systematic analysis and interpretation of collected data for a research study: A practical methodological framework for writing research report. Educational Research and Review, vol. 6, pp. 140-146. 16. Bolz, H., and Stocker, H., 1951. Basics of Material Handling, 2nd ed. pp. 22-33. Inc, New York: Prentice Hall. 17. Boteanu E., Zapciu M. and Sindile M., 2014. Balancing of Production Line Using Discrete Event Simulation Model. Proceedings in Manufacturing Systems, 9 (4), pp. 227 – 232. 18. Boteanu, E. and Zapciu, M., 2014. Improving Layout and Workload of Manufacturing System Using Delmia Quest Simulation and Inventory Approach. International Journal of Innovative Research in Advanced Engineering, 1 (6), pp. 52 – 61. 19. Bozer, Y. A., and McGinnis, L. F., 1992. Kitting Versus Line Stocking: A Conceptual Framework and a Descriptive Model. International Journal of Production Economics, 28 (1), pp. 1 - 19. 20. Branigan, M. J., 1985. Testing Material Handling Systems Using CAD-Driven Simulation Modeling. R.H.Hollier (Ed.). In Conference of Automated Materials Handling. pp. 198 - 200. 21. Braun, V. and Clarke, V., 2006. Using thematic analysis in psychology. Qualitative Research in Psychology, 3 (2), pp. 77 – 101. 22. Bryman, A. and Bell E., 2007. Business Research Methods.2nd Ed. New York: Oxford University Press 23. Bulent, S., 2003. Modeling Automated Guided Vehicle Systems in Material Handling. Dogus Universitesi Dergisi, 4 (2), pp. 207 - 216. 24. Businessdictionary, 2016. Material Handling and Productivity. Frost & Sullivan [Online]. Available at: www.frost.com/prod/servlet/cio/116819997 [Accessed on 25 December 2016] 25. Businessdictionary, 2016. Product Layout [Online]. Available at: http://www.businessdictionary.com/definition/product-layout.html [Accessed on 27 May 2016] 26. Bzymek, Z., Munezz, M. and Li, M., 2008. Simulation of Machining Sequence Using Delmia/Quest Software. Computer – Aided Design and Application, 5 (4), pp. 401 – 411. 27. Camille, N., 2016. Research Design [Online]. Available at http://ori.hhs.gov/education/products/sdsu/res_des2.htm [Accessed on 21 September 2016] 28. Cao, Y., Li, W., Song, W., and Chaovalitwongse, W. A., 2013. Collaborative Material and Production Tracking in Toy Manufacturing. Proceedings of the 2013 IEEE 17th International Conference on Computer Supported Cooperative Work in Design, pp. 645–650. 29. Carlo, H. J., Box, P. O., and Johnson, A., 2008. An Analytical Model for Conveyor Based AMHS in Semiconductor Wafer Fabs. S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler (Ed.). Proceedings of the 2008 Winter Simulation Conference, pp. 2148 – 2155. 30. Carlos, B. R., 1995. Performance Evaluation of an Automated Material handling System for a Machining Line using Simulation. Proceedings of the 1995 Winter Simulation Conference. 31. Cerda, C. R. 1995. Performance Evaluation of an Automated Material Handling System for a Machining Line Using Simulation. pp.881 - 888. 32. Chen, J. C., Cheng, C. H., Huang, P. B., Wang, K. J., Huang, C. J., and Ting, T. C., 2013. Warehouse Management with Lean and RFID Application: A Case Study. International Journal of Advanced Manufacturing Technology, 69 (4), pp. 531 – 542. 33. Chen, J. H.., Zhang, Y., and Shi, C., 2009. The Application of Supply Chain Management Performance Model Based on VMI. 2009 International Conference on Management and Service Science, pp. 1 – 5. 34. Chiung H. H., Chiwoon C., Yang T. and Chang T.J., 2012. Simulation Study for the Proposed Segmented Automated Material Handling System Design for 300-mm Semiconductor Fabs. Simulation Modelling Practice and Theory, vol. 29, pp. 18 - 31. 35. Chris W., Todd M., Baker I., Blain J. and Smith K., 2016. Guide to Undergraduate Dissertation – Methodologies [Online]. Available at http://www.socscidiss.bham.ac.uk/methodologies.html [Accessed on 20 September 2016] 36. Christopher, J., Kuhl, M. E., and Hirschman, K., 2005. Simulation analysis of dispatching rules for automated material handling systems and processing tools in semiconductor fabs. ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing. 37. Chung, J., 2015. Estimating Arrival Times of Transportation Jobs for Automated Material Handling in LCD Fabrication Facilities. Journal of Manufacturing System, Vol. 35, pp. 112-119. 38. Clay P., Cowx I., Evans D., Gayanilo F., Grainger R., Gumy A.,… Zwieten P. V.,1998. Guidelines for the Routine Collection of Capture Fishery Data. Rome: FAO/DANIDA Expert Consultation. 39. Coyle, J. J., Bardi E. J., Langley C. J., 1992. Management of Business Logistics, 5th ed. West. 40. DASSAULT SYSTEM, 2008. “DELMIA Documentation Version 5 Release 19”. 41. Davidson, M., 2013. 28 Manufacturing Metrics that Actually Matter. The One We Rely On. LNS Research [Online]. Avaiable at: http://blog.lnsresearch.com/blog/bid/188295/28-Manufacturing-Metrics-that-Actually-Matter-The-Ones-We-Rely-On [Accessed on 20 September 2016] 42. Dhamodharan R., NagalingamS. V., Gurd B. W., Lin G. C. I., 2009. Quantity of Material Handling Euipment – A Queuing Theory Based Approach. Robotics and Computer-Integrated Manufacturing, Vol.25, pp. 348-357. 43. Dong L., Li Y., Yu J. F., Zhang J.,, 2009. A Cooperative Method between Assembly Process Planning and Simulation for Complex Product. 2009 International Conference on Interoperability for Enterprise Software and Applications China, pp. 163-166. 44. Faiz M., 2008. Material Handling System Development in Factory Using CATIA v5 Software (Bachelor Thesis). Universiti Teknikal Malaysia Melaka, Malaysia. 45. Frechtling, J., 2002. The 2002 User Friendly Handbook for Project Evaluation. The National Science Foundation, Directorate for Education & Human Resources, Division of Research, Evaluation, and Communication. 46. Goode, N., Salmon, P. M., Lenn, M. G., and Hillard, P., 2013. Systems thinking applied to safety during manual handling tasks in the transport and storage industry. Accident Analysis and Prevention, Vol. 68, pp. 181–191. 47. Groover, M. P., 2001. Automation, production systems, and computer-aided manufacturing. 2nd ed., Prentice-Hall: New Jersey, pp. 88-90. 48. Groover, M. P., 2008. Automation, production systems, and computer-aided manufacturing. 3rd ed., Prentice-Hall: New Jersey. 49. Gu J., Goetschalckx M., McGinnis L. F., 2007. Research on Warehouse Operation: A Comprehensive review. European Journal of Operation Research, Vol. 177, Issue 1, pp. 1 – 21. 50. Gu J., Goetschalckx M., McGinnis L. F., 2010. Research on Warehouse Design and Performance Evaluation: A Comprehensive Review. European Journal of Operation Research, Vol. 203, Issue 3, pp. 539 – 549. 51. Harisha, S. K., Biradar, M., Uppar. B.v. and Kulkarni, r.s., 2014. Design and Fabrication of Automatic Material Handling System for Engraving Machine. Proceeding Material Science of International Conference on Advances in Manufacturing and Materials Engineering AMME 2014, Vol. 5, pp. 1540-1549. 52. Hilmi, O. M., and Yulis, M. A. S., 2012. Optimising injection moulding parameters that satisfies part qualities by using Taguchi method. BEIAC 2012 - 2012 IEEE Business, Engineering and Industrial Applications Colloquium, pp. 307–312. 53. Ho, C. Ter, and Nguyen, V. A., 2006. Study of supply chain models in Vietnamese Footwear Industry. Portland International Conference on Management of Engineering and Technology, 6(c), pp. 2796–2800. 54. Hokey Min and Gengui Zhou, 2002. Supply Chain Modeling: Past, Present and Future. Computer & Industrial Engineering. Vol. 43, pp. 231-249. 55. Holst L., Bolmsjo G., 2001. Simulation Integration in Manufacturing System Development: A Study of Japanese Industry”, Industrial Management & Data System. 101(7), pp. 339 – 356. 56. Hompel M., Sadowsky V. and Beck M., 2011. Kommissioniering. Materialflusssysteme 2 – Planung und Berechnung der Kommissionierung in der Logistik. Berlin, Springer. 57. Hox, J. J., and Boeije, H. R., 2005. Data Collection, Primary vs. Secondary. Encyclopedia of Social Measurement, Volume 1, pp. 593-599. 58. Hyo, J. L., Won, I. K., Sung K. K., Seong Y. C., Han S. l., Geun I. P. and In, T. K., 2014. Discrete Event System Based Pyprocessing Modeling and Simulation. 11th International Conference of Informatics in Control, Automation & Robotics 2014, Vol.1, pp. 590-596. 59. Inman R. A., 2016. Layout in Reference for Business [Online]. Available at: http://www.referenceforbusiness.com/management/Int-Loc/Layout.html [Accessed on 27 May 2016]. 60. Ioannou, G., 2007. An integrated model and a decomposition-based approach for concurrent layout and material handling sys¬tem design. Computers & Industrial Engineering, No. 52, pp. 459–485. 61. Ioannou, P., Jula, H., and Liu, C., 2000. Advanced Material Handling: Automated Guided Vehicles in Agile Ports [Online]. Retrieved from http://www.ccdott.org/transfer/projresults/1998/task 1261/task 1.2.6.1.pdf [Accessed on 28 October 2015] 62. Itaya, K., and Niwa, K., 2007. Highly autonomous small-team-type R&D management model and its trial management experiment. Portland International Conference on Management of Engineering and Technology, pp. 2291–2295. 63. Jaiganesh, V., Kumar, J. D., and Girijadevi, J., 2014. Automated Guided Vehicle with Robotic Logistics System. Procedia Engineering, vol. 97, pp. 2011–2021. 64. Jamil M., Razali N., 2016. Simulation of Assembly Line Balancing in Automotive Component Manufacturing. IOP Conference Series: Material Science and Engineering. 114. pp. 1 – 8. 65. Johansson, E. and Johansson, M. I., 2006. Material Supply Systems Design in Product Development Projects. International Journal of Operation & Production Management, vol. 26, Issue 4, pp. 371-393. 66. Johansson, M. I., 1991, Kittings Systems for Small Parts in Manual Assembly Systems. In Pridham M. and O’Brien C. (Eds), Production Research – Approaching the 21st Century, Taylor & Francis, London, pp. 225 – 230. 67. Karlsson, E., 2011. A Comparative Study of the Material Feeding Principles Kitting and Sequencing at Saab Automobile, Trollhättan : Creation of Guiding Principles of Which Articles to be supplied with Kitting. [Master of Science Thesis]. 68. Kay, M.G., 2012. Material Handling Equipment. Metal Finishing, Vol. 96, Issue 12, pp. 67. Retrieved From http://www.ise.ncsu.edu/kay/Material_Handling_Equipment.pdf. 69. Khan, M. B., Hussain, M. A., Shahzad, K., Nawaz, S., and Touseef, M. U., 2014. A Bi-Directional Prototype Mobile Robot to Experiment Light Scale Object-Transportation Schemes. pp. 130–134. 70. Kirkavak, N., 2010. Introduction to Material Handling Systems, Cankaya University, Ankara. [Online]. Retrieved at http://ie473.cankaya.edu.tr/uploads/files/file/LectureNotes/LectNote02%20MH%20INTRO.pdf. [Accessed on 5 May 2015] 71. Kothari C. R., 2004. Research Methodology: Methods and Techniques. Jaipur, India: New Age International (P) Limited Publishers. 72. Kousi N., Koukas S., Michalos G. and Makris S., 2018. Scheduling of Smart Intra – Factory Material Supply Operations Using Mobile Robots. International Journal of Production Research. 73. Kristen, P. 2005. Studyblue. Retrieved at https://www.studyblue.com/notes/note/n/ch9-primary-data-collection-experimentation-and-test-markets/deck/9702637 [Accessed on 5 May 2015] 74. Kyoungho An., Gokhale, A., and Sastry, S., 2011. Model-Driven Performance Analysis of Reconfigurable Conveyor Systems Used in Material Handling Applications. Proceedings - 2011 IEEE/ACM 2nd International Conference on Cyber-Physical Systems. 75. Le-Anh, T., and De Koster, M. B. M., 2006. A Review of Design and Control of Automated Guided Vehicle Systems. European Journal of Operational Research, Vol.171, Issue 1, pp. 1–23. 76. Lin, J. T., Wang, F.-K. W. F.-K., and Wu, C.-K. W. C.-K., 2003. Simulation analysis of the connecting transport AMHS in a wafer fab. IEEE Transactions on Semiconductor Manufacturing, Vol. 16, Issue 3, pp. 555 – 564. 77. Long Y. G. and Zhao H. W., 2003. Gantry Crane Virtual Simulation Training System. Computer Simulation, Vol. 20, Issue 5, pp. 120 – 122. 78. Marcoulides G.A., 1998. Quantitative Methodology Series: Modern Methods for Business Research. London: Lawrence Erbium Associates. 79. Martin M., Malzahn D. and Whitman L., 2005. Simulating an Aircraft Move Rate. International Journal of Innovation in Education. [Online] Available at: http://webs.wichita.edu/depttools/depttoolsmemberfiles/lewhitman/Papers/Pre2007/2005IJIIEBernbeck_Whitman.pdf [Accessed on 28 October 2016] 80. Material Handling Industry, 2006. Annual Report, Charlotte, NC. 81. Mathers, N., Fox, N., and Hunn, A., 2007. Surveys and Questionnaires. The NIHR RDS for the East Midlands / Yorkshire & the Humber. 82. Maxwell J. A., 2012. Qualitative Research Design: An Interactive Apporach, 3rd ed., Thousans Oaks, CA: Sage Publications. 83. Maziar, M. and Bengt, L., 2013. Concurrent Design and Control of Automated Material Handling Systems. 2013 IEEE International Conference on Automation Science nd Engineering (CASE). 84. Meng, Z., Guofu, Y., and Juxin, H., 2014. Design of Automatic Picking System of Yam Based on SCM. 2014 Sixth International Conference on Measuring Technology and Mechatronics Automation, pp. 222–225. 85. Meyers, F. E., 1993. Plant Layout and Material Handling. Englewood Cliffs, NJ: Regents/Prentice Hall. 86. MHEDA, 2004. Space Utilization Requirement Propel New Design and Technology. Material Handling Equipment Distributor Association, 33 (3). 87. Mikell P. G., 2001. Automation, Production Systems, and Computer-Integrated Manufacturing, 2nd ed., New Jersey: Prentice- Hall. 88. Moretti, G., 2012 “Automation of Supermarket in Supply od Assembly Lines.” ABCM Symposium Series in mechatronics, vol. 5. 89. Muther, R., 1969. Systemic Handling Analysis. Management and Industrial Publications, Kansas City, Mo., pp. 66-78. 90. Nadoli, G., and Pillai, D., 1994. Simulation in Automated Material Handling Systems Design for Semiconductor Manufacturing. Proceedings of the 1994 Winter Simulation Conference. 91. Naslund D., 2002. Logistics Needs Qualitative Research-Especially Action Research. International Journal of Physical Distribution & Logistics Management. 32 (5), pp. 321 – 338. 92. Noguchi H., 2005. Set Parts Supply System in Guangzhou Toyota. Bulletin of the Kagoshima Prefectural Jr. College Cultural and Social Science. 59, pp. 17 – 29. 93. Onur, M. U. and Sanjay S. U., 1997. The Role of Simulation in Design of Material Handling System. [Online] Retrieved at: http://www.pmcorp.com/portals/5/_downloads/therolesimulationindesignofmaterialhandlingsystem.pdf [Accessed on 28 October 2015] 94. Onur, M. U., Grajo, E. and Shore, J., 1994. The Role of Simulation in Design and Operation of Body and Paint Shops in Vehicle Assembly Plants. Proceedings of the 1994 European Simulation Symposium. 95. Paquet, V., Punnett, L., and Buchholz, B., 1999. An evaluation of manual materials handling in highway construction work. International Journal of Industrial Ergonomics, vol. 24, Num. 4, pp. 431–444. 96. Pence, I.W., E.M. and Malstrom, 1994. The Evolution of Material Handling. In I.W. & Pence (Ed.), The Materials Handling Engineering Division 75 Anniversary Commemorative. Vol. 1, American Society of Mechanical Engineers: New York, pp. 161-165. 97. Prakash, A., and Chen, M., 1993. Performance evaluation of flexible manufacturing systems using factorial design techniques. IEEE WESCANEX 93 Communications, Computers and Power in the Modern Environment - Conference Proceedings, pp. 407–415. 98. Qinghua Z., He, B., Cheng G., Wang, Z., Yan, D. and Wang, B., 2010. Development of Pick-to-Light Communication Middleware. Proceedings of the 2010 5th IEEE Conference on Industrial Electronics and Applications, Taichung, Taiwan, 15 – 17 June 2010. IEEE Publisher. 99. Qiu, Z., and Qianwang, D., 2011. Simulation Planning of Robot Welding Line. 2011 2nd International Conference of Mechanic, Automation & Control Engineering (MACE), pp. 1612-1615. 100. Reyneke M., 2010. Assembly Line Layout and Process Optimization at Powetech Transformers (Bachelor Thesis). University of Pretoria, South Africa. 101. Robson, J.C., Marcelo, M. F., Luiz, B. S., 2009. Operational Simulation Model of the Raw Materials Handling in an Integrated Steel Making Plant. Proceedings of the 2009 Winter Simulation Conference. 102. Ropya, K.K., 2011. Design of reconfigurable manufacturing system. National Institute of Technology Rourkela. Bachelor Degree Thesis. 103. Ruchi M., Ashok K., Pundir L., Ganapathy, 2016. Conceptualizing Sources, Key Concerns and Critical Factory for Manufacturing Flexibility Adoption, Journal of Manufacturing Technology Management, vol. 27, Issue 3, pp. 379 – 407. 104. Saad N. H., Farouk M. A. A., Mohamed Z. and Sahab A. R. M., 2005. Manufacturing Plant Performance Analysis Using Simulation Technique, Proceedings of the 2nd International Conference on Mechatronics, Kuala Lumpur, Malaysia, 10 – 12 May 2005, pp. 871- 878. 105. Sall, J., Creighton, L., and Lehman, A., 2007. “JMP Start Statistics –the Statistical; Discovery Software, Version 7.0”, Third Edition, , SAS Institute, Inc., 2007. 106. Santhanam, H. and Taylor G. D., 1995. Framework for the Design and Analysis of Large Scale Material Handling Systems. In: Alexopoulos C., Kang K., Lilegdon W. R. and Goldsman D., Proceedings of the 1995 Winter Simulation Conference, pp. 889 – 894. 107. Santosh W. R., Ashish T. M., Mali P.K., 2016. Design and Analysis of Material Handling. International Research Journal of Engineering and Technology. 3 (5). pp. 2516 – 2533. 108. Sharfiza M. N., 2005. Developing Production Model at Laboratory of Faculty of Manufacturing Engineering (Bachelor Thesis). Universiti Teknikal Malaysia Melaka. Malaysia. 109. Sharifah Z. S. M. N., 2015. Modeling Part Supply System for Automotive Assembly Line (Master Thesis). Universiti Teknikal Malaysia Melaka, Malaysia. 110. Smriti C., 2015. Four Main Types of Plant Layout [Online]. Available at: http://www.yourarticlelibrary.com/industries/plant-layout/four-main-types-of-plant-layout/34604/ [Accessed on 27 May 2016]. 111. Snyder, T., 2013. Advantages of Proper Material handling. Murray Material Handling. Retrieved from http://www.murraymh.com/advantages-of-proper-material-handling/ 112. Sople V. V., 2007. Material Handling Equipment: Exploiting Productivity Potential in Supply Chain. SEARCH, vol. 10, No. 10. 113. Spur, G., Seliger, G. and Viehweger, B., 1986. Cell Concepts for Flexible Automated Manufacturing. Journal of Manufacturing Systems, 5 (3), pp. 171 – 179. 114. Sree, R. R., 2009. Economics and Advantages of good material handling system. Cite Management Article Repository of Cite.Co. Retrieved from http://www.citeman.com/6672-economics-and-advantages-of-good-material-handling-systems.html 115. Straube F., Pfohl H. C., Gunthner W. A. and Dangelmaier W., 2010. Trends und Strategien in der Logistik: Ein Blick auf die Agenda des Logistik – Managements 2010. Hamburg, Dt. Verkehrs – Verlag. 116. Su, W., Hu, K., Zhang, L., and Ma, L., 2009. A RFID-Based Material Supply Management System in Automatic Vehicle Assembly Streamline. Proceedings - 2009 International Conference on Information Technology and Computer Science, Vol. 2, pp. 259–262. 117. Suhartini M. J., Rizauddin R., Nizam R., Azhari O., 2014. Integrated Set Part Supply System in a Mixed-Model Assembly Line. Journal of Computer & Industrial Engineering. 75. pp. 266 – 273. 118. Suhartini, M. J., Rizauddin, R., Mohd Nizam, A. R., and Azahari, O. 2013. “Design Concept in Set Part Supply Implimentation.” Research Journal of Applied Science, Engineering and technology, vol. 19, Issue 6. 119. Sule, D R., 1994. Manufacturing Facilities: Location, Planning and Design, 2nd ed., Boston: PWS Publisher. 120. Sunderam P. and Viswanathan E., 2014. Development of Material Handling System in a Manufacturing Company. International Journal of Innovative Research in Science, Engineering and Technology, 3 (1), pp. 8909 - 8913. 121. Sunderesh, S. H. and Banu, Y. E., 2009. Environmentally Conscious Materials Handling: Chapter 1, Material Handling System Design. Myer Kutz (Ed). Hoboken, NJ: Wiley. 122. Tauseed A., 2010. Material Handling in Flexible Manufacturing Systems. [Online] Retrieved at: http://cdn.intechweb.org/pdfs/11321.pdf [Accessed on 28 October 2015] 123. Telford, J. K., 2001 “Sensitivity Analysis Using Design of Experiments in Ballistic Missile Defense,” Proceedings of the Seventh Conference on Applied Statistics, 2001. 124. Thomas, D., 2010. Material Handling Solutions: A look into Automated Robotics. Wunsch Materials Handling Price. 125. Tompkins, J.A., 2010b. Facilities Planning. 4th ed., Johns Wiley & Sons: U.S.A. 126. Ulrich K. T. and Eppinger S. D., 2016. Product Design and Development. 6th Ed. McGraw-Hill Education, New York. 127. Uy, M., and Telford, J. K., 2009. Optimization by Design of Experiment techniques. 2009 IEEE Aerospace Conference. 128. Varga R. and Nedevschi S., 2014. Vision-based Autonomous Load Handling for Automated Guided Vehicles. Proceedings – 2014 IEEE 10th International Conference on Intelligent Computer Communication and Processing, pp. 239 – 244. 129. Vijayaram, T. R., 2006. Materials Handling Technology and Significance of Expert Systems To Select Appropriate Handling Equipment in Engineering Industries: A Review. Journal of Scientific and Industrial Research, vol. 65, Issue 8, pp. 619–624. 130. Wahyudi, M. A., Dania, W. A. P., and Silalahi, R. L. R. 2015. Work Posture Analysis of Manual Material Handling Using OWAS Method. Agriculture and Agricultural Science Procedia, vol. 3, pp. 195–199. 131. Walter W.G., 2003. Encyclopedia of Cognitive Science, Biographical Essay, vol.4, pp. 537 - 539. 132. Wang, H., 2009. How can we build a good project configured supply chains. 2008 International Seminar on Business and Information Management, ISBIM 2008, vol. 1, pp. 19–22. 133. Wang, S., Shi, J., Jiang, D., and Qi, Z., 2012. Research for Traceability Model of Material Supply Quality in Construction Project. Proceedings - 2012 5th International Symposium on Computational Intelligence and Design, vol. 2, pp. 398–401. 134. Weber, A., 2004. The Pros and Cons of Cell [Online]. Available at: http://www.assemblymag.com/articles/83136-the-pros-and-cons-of-cells [Accessed on 5 January 2017] 135. Weber, A., 2008. AGVs vs. Conveyors [Online]. Retrieved at http://www.assemblymag.com/articles/85767-agvs-vs-conveyors [Accessed on 28 October 2015] 136. Yang M. and Yin M. D., 2009. Ergonomics Simulation and Application in Virtual Assembly. Nanjing University of Aeronautics and Astonautics. 137. Yan-ping, Wang, and Hui-quan, Ma., 2011. Design of Autonomous Mobile Robot Navigation System. Proceedings of 2011 International Conference on Electronics and Optoelectronics, vol. 1, pp. 359-362. 138. Yongsheng S., Hongkun C., Yunxue S., 2012. Aviation Cargo Handling Process Simulation Analysis. 2012 IEEE Symposium on Electrical & Electronics Engineering (EEESYM), pp. 264-267. 139. Zaki, A. M., Arafa, O., and Amer, S. I., 2014. Microcontroller-Based Mobile Robot Positioning and Obstacle Avoidance. Journal of Electrical Systems and Information Technology, vol. 1, Issue 1, pp. 58–71. 140. Zhang, F., Fu, S., and Zhang, G., 2011. The model and kinematics simulation of the new-style conveyor with belt and rakes. ICAE 2011 Proceedings: 2011 International Conference on New Technology of Agricultural Engineering, pp. 228–231. 141. Zhao, X. X., and Ning, L. Y., 2009. Study of The Lean Logistics Operating Model Based on RFID and its Application in Auto Industry. Proceedings - 1st International Symposium on Computer Network and Multimedia Technology, vol. 3, pp. 2-5. 142. Zhou Z., Li L., Lin J., 2014. Integrated Analytical Modeling for Production Systems Coupled with Material Handling Systems. IEEE Transaction on Systems, Man, and Cybernetics: System, vol. 44, No.8, pp. 1067-1076.