Implementation of overall equipment effectiveness in surface mounting technology

The purpose of this paper is to study on implementing Overall Equipment Effectiveness (OEE) in Surface Mounting Technology (SMT) for Flexible Circuit Board Assembly Industry. OEE comprises of Availability, Performance and Quality which able to identify six major losses in the manufacturing which con...

Full description

Saved in:
Bibliographic Details
Main Author: V. Nanjan, Davandran
Format: Thesis
Language:English
English
Published: 2019
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/25164/1/Implementation%20Of%20Overall%20Equipment%20Effectiveness%20In%20Surface%20Mounting%20Technology.pdf
http://eprints.utem.edu.my/id/eprint/25164/2/Implementation%20of%20overall%20equipment%20effectiveness%20in%20surface%20mounting%20technology.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utem-ep.25164
record_format uketd_dc
institution Universiti Teknikal Malaysia Melaka
collection UTeM Repository
language English
English
advisor Salleh, Mohd Rizal
topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
V. Nanjan, Davandran
Implementation of overall equipment effectiveness in surface mounting technology
description The purpose of this paper is to study on implementing Overall Equipment Effectiveness (OEE) in Surface Mounting Technology (SMT) for Flexible Circuit Board Assembly Industry. OEE comprises of Availability, Performance and Quality which able to identify six major losses in the manufacturing which consist of machine breakdown, set up and adjustment, minor stoppages, reduce speed, starl-up rejection and production reject However, this study focused on reduced speed loss whereas printing speed is not as accordance mentioned in solder paste technical data sheet, The solder paste and machine capable to print with 100mm/s but actual setting is slower which was a loss that was identified. Therefore, printing speed been standardised and the consequence from it being analysed and improved. Prior to this, the weaknesses identified on Availability, Performance and Quality which decreasts the OEE ratio. Hence, PDCA methodology being adapted in this study as a proper plan to identify the root causes and implementation of improvement action to enhance OEE ratio. The PDCA implementation have been supported by tools such as brainstorming, Ishikawa diagram, Five Why’s technique and Kaizen. As consequence, two improvement activities introduced which are pallet cooling system and laser cut stainless steel stencil with Nano-coating. Pallet coolingsystem implemented to overcome the machine idling due to waiting pallet to cool down. Hence, this implementation reduced pallet cooling time from the current stage of approximately 300 seconds to below 120 seconds. The next improvement action was laser cut stencil with Nano-coating implemented to improve paste transfer efficiency. Hence, paste volume was measured and data shows stencil with coating achieved better volume on the soldering pad which was 153.86% compare to stencil without coating which are at 108.24%. Thercfore, it improved the quality yield by reducing open joint solder short defeets. The result of this study shows by adapting these tools, Availability achieved target set of 85% while Performance improved to consistently above 70% and Quality ratio above 98%. As a result, OEE shows improvement which consistently achieved above 60%.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author V. Nanjan, Davandran
author_facet V. Nanjan, Davandran
author_sort V. Nanjan, Davandran
title Implementation of overall equipment effectiveness in surface mounting technology
title_short Implementation of overall equipment effectiveness in surface mounting technology
title_full Implementation of overall equipment effectiveness in surface mounting technology
title_fullStr Implementation of overall equipment effectiveness in surface mounting technology
title_full_unstemmed Implementation of overall equipment effectiveness in surface mounting technology
title_sort implementation of overall equipment effectiveness in surface mounting technology
granting_institution Universiti Teknikal Malaysia Melaka
granting_department Faculty Of Manufacturing Engineering
publishDate 2019
url http://eprints.utem.edu.my/id/eprint/25164/1/Implementation%20Of%20Overall%20Equipment%20Effectiveness%20In%20Surface%20Mounting%20Technology.pdf
http://eprints.utem.edu.my/id/eprint/25164/2/Implementation%20of%20overall%20equipment%20effectiveness%20in%20surface%20mounting%20technology.pdf
_version_ 1747834109575561216
spelling my-utem-ep.251642022-06-13T09:33:42Z Implementation of overall equipment effectiveness in surface mounting technology 2019 V. Nanjan, Davandran T Technology (General) TS Manufactures The purpose of this paper is to study on implementing Overall Equipment Effectiveness (OEE) in Surface Mounting Technology (SMT) for Flexible Circuit Board Assembly Industry. OEE comprises of Availability, Performance and Quality which able to identify six major losses in the manufacturing which consist of machine breakdown, set up and adjustment, minor stoppages, reduce speed, starl-up rejection and production reject However, this study focused on reduced speed loss whereas printing speed is not as accordance mentioned in solder paste technical data sheet, The solder paste and machine capable to print with 100mm/s but actual setting is slower which was a loss that was identified. Therefore, printing speed been standardised and the consequence from it being analysed and improved. Prior to this, the weaknesses identified on Availability, Performance and Quality which decreasts the OEE ratio. Hence, PDCA methodology being adapted in this study as a proper plan to identify the root causes and implementation of improvement action to enhance OEE ratio. The PDCA implementation have been supported by tools such as brainstorming, Ishikawa diagram, Five Why’s technique and Kaizen. As consequence, two improvement activities introduced which are pallet cooling system and laser cut stainless steel stencil with Nano-coating. Pallet coolingsystem implemented to overcome the machine idling due to waiting pallet to cool down. Hence, this implementation reduced pallet cooling time from the current stage of approximately 300 seconds to below 120 seconds. The next improvement action was laser cut stencil with Nano-coating implemented to improve paste transfer efficiency. Hence, paste volume was measured and data shows stencil with coating achieved better volume on the soldering pad which was 153.86% compare to stencil without coating which are at 108.24%. Thercfore, it improved the quality yield by reducing open joint solder short defeets. The result of this study shows by adapting these tools, Availability achieved target set of 85% while Performance improved to consistently above 70% and Quality ratio above 98%. As a result, OEE shows improvement which consistently achieved above 60%. 2019 Thesis http://eprints.utem.edu.my/id/eprint/25164/ http://eprints.utem.edu.my/id/eprint/25164/1/Implementation%20Of%20Overall%20Equipment%20Effectiveness%20In%20Surface%20Mounting%20Technology.pdf text en 2023-08-05 staffonly http://eprints.utem.edu.my/id/eprint/25164/2/Implementation%20of%20overall%20equipment%20effectiveness%20in%20surface%20mounting%20technology.pdf text en validuser https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=117853 mphil masters Universiti Teknikal Malaysia Melaka Faculty Of Manufacturing Engineering Salleh, Mohd Rizal 1. Andersson, C. and Bellgran, M. (2015) ‘On the complexity of using performance measures: Enhancing sustained production improvement capability by combining OEE and productivity’, Journal of Manufacturing Systems. The Society of Manufacturing Engineers, 35, pp. 144–154. 2. Barsalou, M., n.d. Root Cause Analysis, Ishikawa Diagram and the 5 Whys. [Online] Available at: https://www.isixsigma.com/tools-templates/cause-effect/root-cause-analysis-ishikawa-diagrams-and-the-5-whys/ [Accessed 18 December 2018]. 3. Benjamin, S. J., Marathamuthu, M.S., Murugaiah, U. (2015) ‘The use of 5-WHYs technique to eliminate OEE ’ s speed loss in a manufacturing firm’. 4. Borecki, J. and Serzysko, T. (2016) ‘Mechanical reliability of solder joints in PCBs assembled in surface mount technology’, Soldering and Surface Mount Technology, 28(1), pp. 18–26. 5. Corporation, I. (2016) ‘Indium8.9E Pb-Free Solder Paste 98461 R7’, 86(0), pp. 8–9. 6. Cortes, H., Daaboul, J. and Duigou, J. Le (2016) ‘Strategic Lean Management : Integration of operational Performance Indicators for strategic Lean management’, IFAC-PapersOnLine. Elsevier B.V., 49(12), pp. 65–70. 7. Davis, K. O., Brooker, R.P., Seignur, H.P., Rodgers, M., Rudack, A.C., & Schoenfeld, W.V. (2014) ‘Pareto analysis of critical challenges for emerging manufacturing technologies in silicon photovoltaics’, Solar Energy. Elsevier Ltd, 107, pp. 681–691. 8. Deshkar, A., Kamle, S., Giri, J., & Korde, V. (2018) ‘Design and evaluation of a Lean Manufacturing framework using Value Stream Mapping (VSM) for a plastic bag manufacturing unit’, Materials Today: Proceedings. Elsevier Ltd, 5(2), pp. 7668–7677. 9. Garre, P., Nikhil Bharadwaj, V. V. S., Shiva Shashank, P., Harish, M., & Sai Dheeraj, M. (2017) ‘Applying lean in aerospace manufacturing’, Materials Today: Proceedings. Elsevier Ltd, 4(8), pp. 8439–8446. 10. Garza-Reyes, J. A., Romero, J., Govindan, K., Cherrafi, A., & Ramanathan, U. (2018) ‘A PDCA-based approach to Environmental Value Stream Mapping ( E-VSM )’, Journal of Cleaner Production, 180, pp. 335–348. 11. Glegg, S. M. N., Ryce, A. and Brownlee, K. (2018) ‘A visual management tool for program planning, project management and evaluation in paediatric health care’, Evaluation and Program Planning. Elsevier, 72(September 2018), pp. 16–23. 12. Guegan, J., Segonds, F., Barré, J., Maranzana, N., Mantelet, F., & Buisine, S. (2017) ‘Social identity cues to improve creativity and identification in face-to-face and virtual groups’, Computers in Human Behavior, 77, pp. 140–147. 13. He, T., Li, D. and Yoon, S. W. (2017a) ‘A Heuristic Algorithm to Balance Workloads of High-speed SMT Machines in a PCB Assembly Line’, Procedia Manufacturing. The Author(s), 11(June), pp. 1790–1797. 14. He, T., Li, D. and Yoon, S. W. (2017b) ‘A multi-phase planning heuristic for a dual-delivery SMT placement machine optimization’, Robotics and Computer-Integrated Manufacturing. Elsevier Ltd, 47(November 2016), pp. 85–94. 15. Hedman, R., Subramaniyan, M. and Almström, P. (2016) ‘Analysis of Critical Factors for Automatic Measurement of OEE’, Procedia CIRP. The Author(s), 57, pp. 128–133. 16. Higuchi, Y., Nam, V. H. and Sonobe, T. (2015) ‘Sustained impacts of Kaizen training’, Journal of Economic Behavior and Organization. Elsevier B.V., 120, pp. 189–206. 17. Jain, A., Bhatti, R. S. and Singh, H. (2015) ‘OEE enhancement in SMEs through mobile maintenance: a TPM concept’, European Journal of Marketing, 24(5), pp. 41–49. 18. Jayaprasad, G., Dhanalakshmi, P. P., Baskaran, M., & Hemachandran, S. (2018) ‘Analysis of low isolation problem in HMC using Ishikawa model: A case study’, Microelectronics Reliability. Elsevier, 81(December 2017), pp. 195–200. 19. Khader, N., Yoon, S. W. and Li, D. (2017) ‘Stencil Printing Optimization using a Hybrid of Support Vector Regression and Mixed-integer Linear Programming’, Procedia Manufacturing. The Author(s), 11(June), pp. 1809–1817. 20. Kigsirisin, S., Pussawiro, S. and Noohawm, O. (2016) ‘Approach for Total Productive Maintenance Evaluation in Water Productivity : A Case Study at Mahasawat Water Treatment Plant’, Procedia Engineering. The Author(s), 154, pp. 260–267. 21. Lau, C. S., Khor, C. Y., Soares, D., Teixeira, J. C., & Abdullah, M. Z. (2016) ‘Thermo-mechanical challenges of reflowed lead-free solder joints in surface mount components: A review’, Soldering and Surface Mount Technology, 28(2), pp. 41–62. 22. Jeffrey Len Yung Kwuan , Leon Rao , Evan Yip , Wisdom Qu , and Jonas Sjoberg’, (2019) ‘Impact of stencil quality and & technology on solder paste printing performance: Pan Pacific Microelectronics Symposium (Pan Pacific). SMTA, pp. 1–6. 23. Maarof, M. G. and Mahmud, F. (2016) ‘A Review of Contributing Factors and Challenges in Implementing Kaizen in Small and Medium Enterprises’, Procedia Economics and Finance. Elsevier B.V., 35(October 2015), pp. 522–531. 24. MFS Technology, 2016. MFS Technology. [Online] Available at: http://www.mfstech.com.sg/index.html [Accessed 29 July 2018]. 25. Michinov, N., Jamet, E., Métayer, N., & Le Hénaff, B. (2015) ‘The eyes of creativity: Impact of social comparison and individual creativity on performance and attention to others’ ideas during electronic brainstorming’, Computers in Human Behavior. Elsevier Ltd, 42, pp. 57–67. 26. Mindtools, n.d. Generating Many Radical, Creative Ideas. [Online] Available at: https://www.mindtools.com/brainstm.html [Accessed 16 December 2018]. 27. Minh, N. D. and Ha, N. T. Van (2016) ‘“Made in Vietnam” Lean Management Model for Sustainable Development of Vietnamese Enterprises’, Procedia CIRP, 40, pp. 603–608. 28. Miroslava, M., Prajová, V., Yakimovich, B., Korshunov, A., & Tyurin, I. (2016) ‘Standardization - one of the tools of continuous improvement’, 149(June), pp. 329–332. 29. Mohan Sharma, K. and Lata, S. (2018) ‘Effectuation of Lean Tool “5S” on Materials and Work Space Efficiency in a Copper Wire Drawing Micro-Scale Industry in India’, Materials Today: Proceedings. Elsevier Ltd, 5(2), pp. 4678–4683. 30. Muñoz-Villamizar, A., Santos, J., Montoya-Torres, J. R., & Jaca, C. (2018) ‘Using OEE to evaluate the effectiveness of urban freight transportation systems: A case study’, International Journal of Production Economics, 197(January), pp. 232–242. 31. Nissinboim, N. and Naveh, E. (2018) ‘Process standardization and error reduction : A revisit from a choice approach’, Safety Science. Elsevier, 103(April 2017), pp. 43–50. 32. Pereira, A., Abreu, F. M., Silva, D., Alves, A. C., Oliveira, J. A., Lopes, I., & Figueiredo, M. C. (2016) ‘Reconfigurable Standardized Work in a Lean company’, 52, pp. 239–244. 33. Pires, S. P., Sénéchal, O., Loures, E. F. R., & Jimenez, J. F. (2016) ‘An approach to the prioritization of sustainable maintenance drivers in the TBL framework’, IFAC-PapersOnLine. Elsevier B.V., 49(28), pp. 150–155. 34. Prajapati, S. (Larsen & T. (no date) ‘Design Guidelines for Regression.’, Area, (L), pp. 1–2. 35. Roggeman, B. and Keser, B. (2015) ‘Improved SMT and BLR of 0.35MM pitch wafer level packages’, pp. 72–78. 36. Rohani, J. M. and Zahraee, S. M. (2015) ‘Production Line Analysis via Value Stream Mapping: A Lean Manufacturing Process of Color Industry’, Procedia Manufacturing. Elsevier B.V., 2(February), pp. 6–10. 37. Safari, M. A. M., Masseran, N. and Ibrahim, K. (2018) ‘Optimal threshold for Pareto tail modelling in the presence of outliers’, Physica A: Statistical Mechanics and its Applications. Elsevier B.V., 509, pp. 169–180. 38. Sangpikul, A. (2017) ‘Leisure , Sport & Tourism Education Implementing academic service learning and the PDCA cycle in a marketing course : Contributions to three bene fi ciaries’, Journal of Hospitality, Leisure, Sport & Tourism Education. Elsevier Ltd, 21(March), pp. 83–87. 39. Short, R. M., D, W. E. C. P. and Perault, J. (2014) ‘Print Performance Studies Comparing Electroform and Laser-Cut Stencils’, Apex Expo. 40. Silva, A. S., Medeiros, C. F. and Vieira, R. K. (2017) ‘the Cans Loss Index in a beverage company’, Journal of Cleaner Production. Elsevier Ltd, 150, pp. 324–338. 41. Steenkamp, L. P., Hagedorn-Hansen, D. and Oosthuizen, G. A. (2017) ‘Visual Management System to Manage Manufacturing Resources’, Procedia Manufacturing. Elsevier B.V., 8(October 2016), pp. 455–462. 42. Tanabe, K. (2018) ‘Pareto’s 80/20 rule and the Gaussian distribution’, Physica A: Statistical Mechanics and its Applications. Elsevier B.V., 510, pp. 635–640. 43. Tsai, T. N. (2012) ‘Thermal parameters optimization of a reflow soldering profile in printed circuit board assembly: A comparative study’, Applied Soft Computing Journal. Elsevier B.V., 12(8), pp. 2601–2613. 44. Ylipää, T., Skoogh, A., Bokrantz, J., & Gopalakrishnan, M. (2017) ‘Identification of maintenance improvement potential using OEE assessment’, International Journal of Productivity and Performance Management, 66(1), pp. 126–143.