Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill

Every company, be it manufacturing or service-oriented will be looking for its best ways to improve profits without increasing the business capital. The management team will work at their best to think and execute any alternatives that can increase productivity at the same time having the concept th...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Jamadeel Izwan
Format: Thesis
Language:English
English
Published: 2019
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/25514/1/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
http://eprints.utem.edu.my/id/eprint/25514/2/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utem-ep.25514
record_format uketd_dc
institution Universiti Teknikal Malaysia Melaka
collection UTeM Repository
language English
English
advisor Salleh, Mohd Rizal

topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Ibrahim, Jamadeel Izwan
Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
description Every company, be it manufacturing or service-oriented will be looking for its best ways to improve profits without increasing the business capital. The management team will work at their best to think and execute any alternatives that can increase productivity at the same time having the concept that can save cost, time and energy. It is undeniable that machines have contributed a lot to increasing productivity, but if it is not well-maintained, it will not serve the purpose. This study emphasizes reducing the downtime in Kilang Sawit Kota Bahagia (KSKB) Palm Oil Mill caused by the breakdown of the production. The downtime data for the year 2017 showed that downtime has increased from January until December especially during the months of July, August, October and November where the hours of downtime were 10, 15.5, 15 and 15 hours respectively . The objective of this study is to identify the potential causes of the downtime by using the Ishikawa Diagram and Pareto Chart. Additionally, the performance of the machines related was assessed using Overall Equipment Effectiveness (OEE) Analysis. The Total Productive Maintenance (TPM) method was proposed to overcome the downtime problem with the implementation of S, Planned Maintenance and Autonomous Maintenance for two months of the trial period. Finally, the proposed method was evaluated and the result indicated that there was an increment of machine’s OEE for example; screw press machines from 6.4% to 30.5%.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Ibrahim, Jamadeel Izwan
author_facet Ibrahim, Jamadeel Izwan
author_sort Ibrahim, Jamadeel Izwan
title Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_short Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_full Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_fullStr Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_full_unstemmed Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_sort proposal of effective maintenance plan for enhancing overall equipment effectiveness at palm oil mill
granting_institution Universiti Teknikal Malaysia Melaka
granting_department Faculty of Manufacturing Engineering
publishDate 2019
url http://eprints.utem.edu.my/id/eprint/25514/1/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
http://eprints.utem.edu.my/id/eprint/25514/2/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
_version_ 1747834135369482240
spelling my-utem-ep.255142022-01-06T12:07:38Z Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill 2019 Ibrahim, Jamadeel Izwan T Technology (General) TS Manufactures Every company, be it manufacturing or service-oriented will be looking for its best ways to improve profits without increasing the business capital. The management team will work at their best to think and execute any alternatives that can increase productivity at the same time having the concept that can save cost, time and energy. It is undeniable that machines have contributed a lot to increasing productivity, but if it is not well-maintained, it will not serve the purpose. This study emphasizes reducing the downtime in Kilang Sawit Kota Bahagia (KSKB) Palm Oil Mill caused by the breakdown of the production. The downtime data for the year 2017 showed that downtime has increased from January until December especially during the months of July, August, October and November where the hours of downtime were 10, 15.5, 15 and 15 hours respectively . The objective of this study is to identify the potential causes of the downtime by using the Ishikawa Diagram and Pareto Chart. Additionally, the performance of the machines related was assessed using Overall Equipment Effectiveness (OEE) Analysis. The Total Productive Maintenance (TPM) method was proposed to overcome the downtime problem with the implementation of S, Planned Maintenance and Autonomous Maintenance for two months of the trial period. Finally, the proposed method was evaluated and the result indicated that there was an increment of machine’s OEE for example; screw press machines from 6.4% to 30.5%. 2019 Thesis http://eprints.utem.edu.my/id/eprint/25514/ http://eprints.utem.edu.my/id/eprint/25514/1/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf text en public http://eprints.utem.edu.my/id/eprint/25514/2/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf text en validuser https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=117929 mphil masters Universiti Teknikal Malaysia Melaka Faculty of Manufacturing Engineering Salleh, Mohd Rizal 1. Ahmed, M., & Ahmad, N. (201 1). An Application of Pareto Analysis and Cause-and-Effect Diagram (CED) for Minimizing Rejection of Raw Materials in Lamp Production Process.Management Science and Engineering, 5(3), 87-95.https://doi.org/l0.3968/j.mse. 19 13035X20110503.320 2. Ahmed, S., & Hassan, M. H. J. (1999). Action Plans for Implementation of Total Productive Maintenance, 15. 3. Ahuja, I. P. S., & Khamba, J. S. (2008). Total productive maintenance implementation in a manufacturing organisation. International Journal of Productivity and Quality Management,3(3), 360. https://doi.org/lO. 1504/IJPQM.2008.017504 4. Ahuja, I. S. (2012). Exploring the impact of effectiveness of total productive maintenance strategies in manufacturing enterprise. International Journal of Productivity and Quality Management, 9(4), 486. https://doi.org/l 0.1 504lIJPQM.2012.047 194 5. Baluch, N., Sobry, C., Abdullah, B., & Mohtar, S. (2010). Maintenance Management Performance - An Overview towards Evaluating Malaysian Palm Oil Mill. The Asian Journal of Technology Management, 3(1), 1 4 . 6. Bhamu, J., & Singh Sangwan, K. (2014). Lean manufacturing: literature review and research issues. International Journal of Operations & Production Management, 34(7), 876-940.https:/Idoi.org/lO. 1 108/IJOPM-08-20 12-03 15 7. Bortolotti, T., Boscari, S., & Danese, P. (2015). Successful lean implementation: Organizational culture and soft lean practices. International Journal of Production Economics, 160, 182-201. https://doi.orgIl0.1016/j.ijpe.2014.10.013 8. Botti, L., Mora, C., & Regattieri, A. (2017). Integrating ergonomics and lean manufacturing principles in a hybrid assembly line. Computers and Industrial Engineering, 11 1,48 1-491.https://doi.org/lO. 1016/j.cie.2017.05.011 9. BoBiEkoviC, R., RadoSeviC, M., ~ o s iI.~, S,o koviC, M., & RikaloviC, A. (2012). Integration of simulation and lean tools in effective production systems - Case study. Strojniski Vestnik;/Journal of Mechanical Engineering, 58(1 I), 642-652. https://doi.org/l0.5545/svjme.2012.387 10. Chan, F. T. S., Lau, H. C. W., Ip, R. W. L., Chan, H. K., & Kong, S. (2005). Implementation of total productive maintenance: A case study. International Journal of Production Economics, 95(1), 7 1-94. https://doi.org/lO. 1016/j.ijpe.2003.10.021 11. Chandran, S. (20 1 5). TPM Implementation Approach, (June). 12. Chiarini, A. (2014). Sustainable manufacturing-greening processes using specific Lean Production tools: An empirical observation fkom European motorcycle component manufacturers. Journal of Cleaner Production, 85, 226-233. https:/Idoi.org/lO. 101 6/j.jclepro.2014.07.080 13. Ciocoiu, I. G., Ilie, G., & Ciocoiu, C. N. (2010). Application of Fishbone Diagram To Determine the Risk of an Event With Multiple Causes. Management Research and Practice,2(1), 1-20. 14. Ding, S.-H., Kamaruddin, S., & Abdul Azid, I. (2014). Maintenance policy selection model a case study in the palm oil industry. Journal of Manufacturing Technology Management, 25(3), 41 5435. https://doi.orgllO. 1 108/JMTM-03-2012-0032 15. Elliot, S. (2014). DevOps and the Cost of Downtime: Fortune 1000 Best Practice Metrics Quantified. International Data Corporation (IDC), Dec 2014. 16. Fazeeda et al. (2015). Evaluating Capacity of Palm Oil Mill Using Simulation Towards Effective Supply Chain - a Case Study. Faculty of Technology Management Universiti Malaysia Pahang. 17. Goehner, L., Carlos, L., Brito, B. De, Albergaria, R., & Bandeira, D. M. (2016). Lean Manufacturing Implementation for Multinational Companies With Production Subsidiary in Brazil : Development of a Roadrnap, 7(1), 99-1 23. 18. Gupta, S., & Tewari, P. (2006). TPM concept and implementation approach. Quality, (679),1 - 18. Retrieved £tom http://citeseerx.ist.psu.edu/viewdoc/download? doi: 10.1.1.1 10.1906&rep==l &type=pdf 19. Hakkak, M., & Ghodsi, M. (2015). Impact of implementing total productive maintenance system on organisational excellence based on EFQM model. International Journal of Business Excellence, 8(2), 197. https://doi.org/lO. 1504lIJBEX.2015.068208 20. Harun, M. Y., Che Yunus, M. A., Morad, N. A., & Ismail, M. H. S. (2015). An industry survey of the screw press system in palm oil mills: Operational data and malfunction issues.Engineering Failure Analysis, 54, 146-149.https://doi.orgllO. 10161j.engfai1ana1.2015.04.003 21. Kennedy, R. (2002). Examining the Processes of RCM and TPM: What do they ultimately achieve and are the two approaches compatible? (Online), Available at: http://www.plantmaintenance.com/maintenance -articles. shtml, p.3. 22. Kiran, D. R. (2017). Process Capability. Total Quality Management, 255-259. https://doi.orgIl0.l016/B978-0-121-1 80 35-5.0001 8-0 Kov, M., Faculty, K., & Masiarska, T. (2012). Analysis of tools for lean manufacturing, 17- 20. 23. Lungarini, S., Aureli, F., Coni, E., Lungarini, S., Aureli, F., Coumarin, E. C., & Cinnamon, C. (201 1). r P Fo r R w On ly. 24. Mabunda, I. S. (2003). The impact of Total Productive Maintenance on the manufacturing sector By. School of Business, Faculty of Management University of Natal (Durban), (200500185). 25. Madanhire, I. & Mbohwa, C. (2015). Enterprise resource planning (ERP) in improving operational efficiency: Case study. 13th Global Conference on Sustainable Manufacturing -Decoupling Growthj-om Resource Use, Procedia CIRP 40,225 - 229. 26. Mahapatra, S. S., & Mohanty, S. R. (2007). Lean manufacturing in continuous process industry: An empirical study. Journal of Scientzjic & Industrial Research, 66(January), 19 27. Martomo, Z. I., & Laksono, P. W. (2018). Analysis of total productive maintenance (TPM) implementation using overall equipment effectiveness (OEE) and six big losses: A case study. AIP Conference Proceedings, 1931. https://doi.orgll 0.1063/1 SO24085 28. McBride, D. (2004). "Implementing TPM Total Productive Maintenance (TPM), Lean Manufacturing Consulting and Training", EMS Consulting Group (http://www.emsstrategies.com) 29. Mobley, R. K., & Smith, R. (2008). The Basics of Maintenance and Reliability. Rules of Thumb for Maintenance and Reliability Engineers, 2008(Chapter 7-Total Productive Maintenance), 107-120. 30. Nallusarny, S., & Majurndar, G. (2017). Enhancement of overall equipment effectiveness using total productive maintenance in a manufacturing industry. International Journal of Performability Engineering, 13(2), 1-1 6. Retrieved fkomhttps://www.scopus.com/inward~record.uri?eid=2-s2.0- 8501 4007629&partnerID=40&md5=40de5fPOfl4596272d8ece25fd98e95 1 31. Oliveira, M., Lopes, I., & Rodrigues, C. (2016). Use of Maintenance Performance Indicators by Companies of the Industrial Hub of Manaus. Procedia CIRP, 52, 157-160. https://doi.org/lO. 101 6/j.procir.2016.07.071 32. Ozkok, M. (2013). The effects of machine breakdown on hull structure production process. Scientia Iranica, 20(3), 900-908. https:Ndoi.org/lO. 101 6/j.scient.2012.12.029 33. Pascal, V., Toufik, A., Manuel, A., Florent, D., & FrCdkric, K. (2018). Improvement indicators for Total Productive Maintenance policy. Control Engineering Practice, 82(June 201 8), 86-96. https://doi.org/lO. 1016/J.CONENGPRAC.2018.09.019 34. Phogat, S., & Gupta, A. K. (2017). Identification of problems in maintenance operations and comparison with manufacturing operations. Journal of Quality in Maintenance Engineering,23(2), 226-238. https://doi.org/lO. 1 108/JQME-06-2016-0027 35. Puvanasvaran, A. P., Mei, C. Z., & Alagendran, V. A. (2013). Overall equipment efficiency improvement using time study in an aerospace industry. Procedia Engineering, 68, 271-277. https://doi.orgll0.1016/j.proeng.2013.12.179 36. Ranteshwar, S., Gohil, A.M., Shah, D.B., & Desai, S. (2013). Total productive maintenance (TPM) implementation in a machine shop: A case study. Procedia Engineering, 5 1, Nucone 2012,592-599. https://doi.org/lO. 1016/j.proeng.2013.01. 37. Rajput, H.P. & Jayaswal, P. (2012). A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment. International Journal of Modern Engineering Research, Volume 2, Issue 6,4383-4386 38. Seng, 0 . Y., Jantan, M., & Ramayah, T. (2005). Implementing Total Productive Maintenance (TPM) In Malaysian Manufacturing Organisation: An Operational Strategy Study. Kinerja, 9(1), 1-8. 39. Silver, E.A., & Fiechter, C.N. (1995). Preventive maintenance with limited historical data. European Journal of Operational Research, 82, 125- 144 40. Shen, C. C. (2015). Discussion on key successful factors of TPM in enterprises. Journal of Applied Research and Technology, 13(3), 425-427. https://doi.org/l0.1016/j.jart.2015.05.002 41. Simces, J. M., Lda, R., & Gomes, C. F. (2011). A literature review of maintenance performance measurement: A conceptual framework and directions for future research. Journal of Quality in Maintenance Engineering, 17(2), 116-137. https://doi.orgllO. 1 10811 35525 1 1 1 1 1 134565 42. Sivaram, N. M., Devadasan, S. R., & Murugesh, R. (2013). Conceptualisation for Implementing Total Productive Maintenance Through the Iso 9001:2008 Standard-Based Quality Management System. The South Aji-ican Journal of Industrial Engineering, 24(2),33. https://doi.org/l0.7 166124-2-494 43. Vijayakumar, S. R., & Gajendran, S. (2014). Improvement of Overall Equipment Effectiveness (Oee) in Injection Moulding Process Industry. IOSR Journal of Mechanical and Civil Engineering, 2(1 O), 47-60. Retrieved fiom www.iosrjournals.org 44. Wahab, A. N. A., Mukhtar, M., & Sulaiman, R. (2013). A Conceptual Model of Lean Manufacturing Dimensions. Procedia Technology, ll(December), 1292-1298. https://doi.org/lO. 1016/j.protcy.2013.12.327