Comparative analysis between FPA and COCOMO techniques for software cost estimation
Software cost estimation is the process of predicting the effort required to develop a software system. The basic inputs for the software cost estimation are programs, size and set of cost drivers, while the output is effort in the form of person-month and cost. In this thesis, Function Point...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1425/1/24p%20ABU%20BAKER%20ALI%20MOFTAH.pdf http://eprints.uthm.edu.my/1425/2/ALI%20BAKER%20ALI%20MOFTAH%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1425/3/ABU%20BAKER%20ALI%20MOFTAH%20WATERMARK.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uthm-ep.1425 |
---|---|
record_format |
uketd_dc |
spelling |
my-uthm-ep.14252021-10-03T06:51:59Z Comparative analysis between FPA and COCOMO techniques for software cost estimation 2014-07 Ali Moftah, Abu Baker QA76 Computer software QA76.75-76.765 Computer software Software cost estimation is the process of predicting the effort required to develop a software system. The basic inputs for the software cost estimation are programs, size and set of cost drivers, while the output is effort in the form of person-month and cost. In this thesis, Function Point Analysis (FPA) and Constructive Cost Model (COCOMO) have been used to estimate software project cost of two case studies. They are Web-Based Dog’s Diseases Diagnosis System (WBDDDS) and Sugar Bun Online Bakery System (SBOBSE). By using FPA, it was shown that for the WBDDDS, the person-month was 12.506 with the total cost of USD65,031.2 were estimated. While using COCOMO, it was shown that 16.286 persons-month with the total cost of USD 84,687.2 were estimated. However, for the SBDBSE, by using FPA, 19.62 persons-month with the total cost of USD102,024 were estimated. It also shown that 19.354 persons-month with the total cost of USD100,640.8 were estimated by using COCOMO. In conclusion, there are no best techniques to estimat 3 e cost for a project. It al 77$ l depends on the parameters of a system 2014-07 Thesis http://eprints.uthm.edu.my/1425/ http://eprints.uthm.edu.my/1425/1/24p%20ABU%20BAKER%20ALI%20MOFTAH.pdf text en public http://eprints.uthm.edu.my/1425/2/ALI%20BAKER%20ALI%20MOFTAH%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/1425/3/ABU%20BAKER%20ALI%20MOFTAH%20WATERMARK.pdf text en validuser mphil masters Universiti Tun Hussein Onn Malaysia Fakulti Sains Komputer dan Teknologi Maklumat |
institution |
Universiti Tun Hussein Onn Malaysia |
collection |
UTHM Institutional Repository |
language |
English English English |
topic |
QA76 Computer software QA76.75-76.765 Computer software |
spellingShingle |
QA76 Computer software QA76.75-76.765 Computer software Ali Moftah, Abu Baker Comparative analysis between FPA and COCOMO techniques for software cost estimation |
description |
Software cost estimation is the process of predicting the effort required to develop a
software system. The basic inputs for the software cost estimation are programs, size
and set of cost drivers, while the output is effort in the form of person-month and
cost. In this thesis, Function Point Analysis (FPA) and Constructive Cost Model
(COCOMO) have been used to estimate software project cost of two case studies.
They are Web-Based Dog’s Diseases Diagnosis System (WBDDDS) and Sugar Bun
Online Bakery System (SBOBSE). By using FPA, it was shown that for the
WBDDDS, the person-month was 12.506 with the total cost of USD65,031.2 were
estimated. While using COCOMO, it was shown that 16.286 persons-month with the
total cost of USD 84,687.2 were estimated. However, for the SBDBSE, by using
FPA, 19.62 persons-month with the total cost of USD102,024 were estimated. It also
shown that 19.354 persons-month with the total cost of USD100,640.8 were
estimated by using COCOMO. In conclusion, there are no best techniques to
estimat
3
e cost for a project. It al
77$
l depends on the parameters of a system |
format |
Thesis |
qualification_name |
Master of Philosophy (M.Phil.) |
qualification_level |
Master's degree |
author |
Ali Moftah, Abu Baker |
author_facet |
Ali Moftah, Abu Baker |
author_sort |
Ali Moftah, Abu Baker |
title |
Comparative analysis between FPA and COCOMO techniques for software cost estimation |
title_short |
Comparative analysis between FPA and COCOMO techniques for software cost estimation |
title_full |
Comparative analysis between FPA and COCOMO techniques for software cost estimation |
title_fullStr |
Comparative analysis between FPA and COCOMO techniques for software cost estimation |
title_full_unstemmed |
Comparative analysis between FPA and COCOMO techniques for software cost estimation |
title_sort |
comparative analysis between fpa and cocomo techniques for software cost estimation |
granting_institution |
Universiti Tun Hussein Onn Malaysia |
granting_department |
Fakulti Sains Komputer dan Teknologi Maklumat |
publishDate |
2014 |
url |
http://eprints.uthm.edu.my/1425/1/24p%20ABU%20BAKER%20ALI%20MOFTAH.pdf http://eprints.uthm.edu.my/1425/2/ALI%20BAKER%20ALI%20MOFTAH%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1425/3/ABU%20BAKER%20ALI%20MOFTAH%20WATERMARK.pdf |
_version_ |
1747830786622488576 |