Multi-facts devices installation for loss minimization and techno-economic impact assessment using EPSO approach
This thesis presents a new meta-heuristic approach technique for optimal location and sizing of multi-unit Flexible Alternating Currents System (FACTS) device installation using single- and multi-objective problems. It also considers techno-economic impact in the system. In this research, the...
Saved in:
Main Author: | Jumaat, Siti Amely |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1747/1/24p%20SITI%20AMELY%20JUMAAT.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimal location of capacitor bank for power losses minimization
by: Che Ros, Ziana
Published: (2013) -
Transmission losses cost allocation in restructed electricity market environment
by: Jaini, Nur ‘Afiqah
Published: (2014) -
Multi criteria decision making on load shedding scheme in an islanded system
by: Jakuil, Alester G
Published: (2013) -
Optimal location of capacitor bank for power losses minimization
by: Che Ros, Ziana
Published: (2013) -
Development of web application package to design AC substation grounding system based on IEE STD. 80-2000 for continuous education and professional training
by: Mohammed Aldebry, Mohammed Alsanosi
Published: (2016)