Structural modelling of cost overrun factors in construction industry

Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others. Of all these, cost overrun is a major problem that occurs globally including Malaysia...

Full description

Saved in:
Bibliographic Details
Main Author: Memon, Aftab Hameed
Format: Thesis
Language:English
English
English
Published: 2013
Subjects:
Online Access:http://eprints.uthm.edu.my/2190/1/24p%20AFTAB%20HAMEED%20MEMON.pdf
http://eprints.uthm.edu.my/2190/2/AFTAB%20HAMEED%20MEMON%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2190/3/AFTAB%20HAMEED%20MEMON%20WATERMARK.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uthm-ep.2190
record_format uketd_dc
spelling my-uthm-ep.21902021-10-31T03:59:21Z Structural modelling of cost overrun factors in construction industry 2013-03 Memon, Aftab Hameed TA Engineering (General). Civil engineering (General) TA630-695 Structural engineering (General) Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others. Of all these, cost overrun is a major problem that occurs globally including Malaysia. Cost overrun is resulted from various factors which are essential to identify for improving cost performance in construction project. Hence, this study focused on identifying and modelling the factors of cost overrun for construction projects in Malaysia. Data collection was done through structured questionnaire, which was designed based on 78 factors found from the literature. Qualitative pilot study was done based on the opinions of 15 experts in the construction industry to improve the questionnaire by reducing the factors to 58. The questionnaire survey was carried out among clients, consultants and contractors. A total of 231 questionnaires were collected of which 213 responses were found valid. Partial Least Square Structural Equation (PLS-SEM) model was developed based on 8 categories/constructs generated through factor analysis test and found that Global Fit Index (GOF) of the model to be 0.37. The findings from the model indicate that all the 8 categories have significant effect on the cost overrun. The most significant category is contractor's site management related issues with path co-efficient value of 0.448. The developed model was validated statistically (using power analysis and predictive relevancy) and through interviewing 21 experienced practitioners. Statistical validation tests showed that the developed model had achieved substantial power in explaining cost overrun problem. All the experts agreed with the factors and also categories of the model have significant impact to cost overrun. 2013-03 Thesis http://eprints.uthm.edu.my/2190/ http://eprints.uthm.edu.my/2190/1/24p%20AFTAB%20HAMEED%20MEMON.pdf text en public http://eprints.uthm.edu.my/2190/2/AFTAB%20HAMEED%20MEMON%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/2190/3/AFTAB%20HAMEED%20MEMON%20WATERMARK.pdf text en validuser phd doctoral Universiti Tun Hussein Malaysia Fakulti Kejuruteraan Awam dan Alam Bina
institution Universiti Tun Hussein Onn Malaysia
collection UTHM Institutional Repository
language English
English
English
topic TA Engineering (General)
Civil engineering (General)
TA630-695 Structural engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
TA630-695 Structural engineering (General)
Memon, Aftab Hameed
Structural modelling of cost overrun factors in construction industry
description Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others. Of all these, cost overrun is a major problem that occurs globally including Malaysia. Cost overrun is resulted from various factors which are essential to identify for improving cost performance in construction project. Hence, this study focused on identifying and modelling the factors of cost overrun for construction projects in Malaysia. Data collection was done through structured questionnaire, which was designed based on 78 factors found from the literature. Qualitative pilot study was done based on the opinions of 15 experts in the construction industry to improve the questionnaire by reducing the factors to 58. The questionnaire survey was carried out among clients, consultants and contractors. A total of 231 questionnaires were collected of which 213 responses were found valid. Partial Least Square Structural Equation (PLS-SEM) model was developed based on 8 categories/constructs generated through factor analysis test and found that Global Fit Index (GOF) of the model to be 0.37. The findings from the model indicate that all the 8 categories have significant effect on the cost overrun. The most significant category is contractor's site management related issues with path co-efficient value of 0.448. The developed model was validated statistically (using power analysis and predictive relevancy) and through interviewing 21 experienced practitioners. Statistical validation tests showed that the developed model had achieved substantial power in explaining cost overrun problem. All the experts agreed with the factors and also categories of the model have significant impact to cost overrun.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Memon, Aftab Hameed
author_facet Memon, Aftab Hameed
author_sort Memon, Aftab Hameed
title Structural modelling of cost overrun factors in construction industry
title_short Structural modelling of cost overrun factors in construction industry
title_full Structural modelling of cost overrun factors in construction industry
title_fullStr Structural modelling of cost overrun factors in construction industry
title_full_unstemmed Structural modelling of cost overrun factors in construction industry
title_sort structural modelling of cost overrun factors in construction industry
granting_institution Universiti Tun Hussein Malaysia
granting_department Fakulti Kejuruteraan Awam dan Alam Bina
publishDate 2013
url http://eprints.uthm.edu.my/2190/1/24p%20AFTAB%20HAMEED%20MEMON.pdf
http://eprints.uthm.edu.my/2190/2/AFTAB%20HAMEED%20MEMON%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2190/3/AFTAB%20HAMEED%20MEMON%20WATERMARK.pdf
_version_ 1747830921579462656