Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology

Construction management is an information intensive industry. In construction projects, knowledge is usually buried in unread reports and arcane filing systems, or lost because people move on, leads to wasted activity of reinventing the wheel and impaired project performance. The application o...

全面介绍

Saved in:
书目详细资料
主要作者: Bahtiar, Siti Fazreena Idayu
格式: Thesis
语言:English
English
English
出版: 2012
主题:
在线阅读:http://eprints.uthm.edu.my/2462/1/24p%20SITI%20FAZREENA%20IDAYU%20BAHTIAR.pdf
http://eprints.uthm.edu.my/2462/2/SITI%20FAZREENA%20IDAYU%20BAHTIAR%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2462/3/SITI%20FAZREENA%20IDAYU%20BAHTIAR%20WATERMARK.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!
id my-uthm-ep.2462
record_format uketd_dc
spelling my-uthm-ep.24622021-11-01T01:26:12Z Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology 2012 Bahtiar, Siti Fazreena Idayu HD Industries. Land use. Labor HD28-70 Management. Industrial Management Construction management is an information intensive industry. In construction projects, knowledge is usually buried in unread reports and arcane filing systems, or lost because people move on, leads to wasted activity of reinventing the wheel and impaired project performance. The application of Knowledge Management (KM) has been identified to be lagging in the area of construction project. Previous developments for KM in the construction industry are focused on traditional project management philosophy of focusing on tasks. Based on high focused research on construction management by Lean practitioners and researchers it is evident that breakthrough improvements in construction can be achieved by focusing on flows. This study focuses on modelling the technology enabled KM process using a re�engineered Last Planner System (LPS) that focuses on flows and Integrated Production Scheduler (IPS) process. Taking an action research approach, a case study was documented to map out the information flow and the KM mechanism. The KM process was modelled based on systematic cyclical observation and analysis. A questionnaire survey was carried out to understand the current practice of information flow management and identify the KM mechanism as well. The result revealed that currently, the construction practitioners applied the traditional approach of project management practice and there are inefficiencies of the current practice. Questionnaire result also had identified KM mechanism that currently being practiced in Planning and Scheduling (P&S) activities. Hence, a proposed system was developed to enhance the current construction management process that performs the role of KM mechanism. At the end of this study, a working model for KM in P&S was developed. The initial feedback of system evaluation on functionality, applicability and effectiveness was gained and will be used in future research work. 2012 Thesis http://eprints.uthm.edu.my/2462/ http://eprints.uthm.edu.my/2462/1/24p%20SITI%20FAZREENA%20IDAYU%20BAHTIAR.pdf text en public http://eprints.uthm.edu.my/2462/2/SITI%20FAZREENA%20IDAYU%20BAHTIAR%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/2462/3/SITI%20FAZREENA%20IDAYU%20BAHTIAR%20WATERMARK.pdf text en validuser mphil masters Universiti Tun Hussein Onn Malaysia Fakulti Pengurusan Teknologi dan Perniagaan
institution Universiti Tun Hussein Onn Malaysia
collection UTHM Institutional Repository
language English
English
English
topic HD Industries
Land use
Labor
HD Industries
Land use
Labor
spellingShingle HD Industries
Land use
Labor
HD Industries
Land use
Labor
Bahtiar, Siti Fazreena Idayu
Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
description Construction management is an information intensive industry. In construction projects, knowledge is usually buried in unread reports and arcane filing systems, or lost because people move on, leads to wasted activity of reinventing the wheel and impaired project performance. The application of Knowledge Management (KM) has been identified to be lagging in the area of construction project. Previous developments for KM in the construction industry are focused on traditional project management philosophy of focusing on tasks. Based on high focused research on construction management by Lean practitioners and researchers it is evident that breakthrough improvements in construction can be achieved by focusing on flows. This study focuses on modelling the technology enabled KM process using a re�engineered Last Planner System (LPS) that focuses on flows and Integrated Production Scheduler (IPS) process. Taking an action research approach, a case study was documented to map out the information flow and the KM mechanism. The KM process was modelled based on systematic cyclical observation and analysis. A questionnaire survey was carried out to understand the current practice of information flow management and identify the KM mechanism as well. The result revealed that currently, the construction practitioners applied the traditional approach of project management practice and there are inefficiencies of the current practice. Questionnaire result also had identified KM mechanism that currently being practiced in Planning and Scheduling (P&S) activities. Hence, a proposed system was developed to enhance the current construction management process that performs the role of KM mechanism. At the end of this study, a working model for KM in P&S was developed. The initial feedback of system evaluation on functionality, applicability and effectiveness was gained and will be used in future research work.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Bahtiar, Siti Fazreena Idayu
author_facet Bahtiar, Siti Fazreena Idayu
author_sort Bahtiar, Siti Fazreena Idayu
title Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
title_short Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
title_full Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
title_fullStr Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
title_full_unstemmed Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
title_sort modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
granting_institution Universiti Tun Hussein Onn Malaysia
granting_department Fakulti Pengurusan Teknologi dan Perniagaan
publishDate 2012
url http://eprints.uthm.edu.my/2462/1/24p%20SITI%20FAZREENA%20IDAYU%20BAHTIAR.pdf
http://eprints.uthm.edu.my/2462/2/SITI%20FAZREENA%20IDAYU%20BAHTIAR%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2462/3/SITI%20FAZREENA%20IDAYU%20BAHTIAR%20WATERMARK.pdf
_version_ 1747830958290108416