A conceptual design of an alternative method for cutting off standby power consumption for office equipment
Ever since the completion of Politeknik Kuching Sarawak (PKS) first major networking project in 2002, its energy consumption has been in the steady rise. Although the increment was understandable, the increasing energy wastage in terms of standby power consumption by ICT equipment and equipmen...
Saved in:
主要作者: | Tan, Kheng Wee |
---|---|
格式: | Thesis |
语言: | English English English |
出版: |
2012
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/2469/1/24p%20TAN%20KHENG%20WEE.pdf http://eprints.uthm.edu.my/2469/2/TAN%20KHENG%20WEE%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/2469/3/TAN%20KHENG%20WEE%20WATERMARK.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Off grid Pico Hydro Power Generator utilizing household water supply
由: Jamaludin, Mohd Nor Aidi
出版: (2013) -
Design and simulation of low power consumption polymeric based MMI thermo-optic switch
由: Mohd Ridzuan, Noridah
出版: (2013) -
Defect detection on electrical power equipment using thermal imaging technology
由: Geoffrey, Ogadimma Asiegbu
出版: (2013) -
Modeling and optimization of power consumption towards energy saving
由: Boroujeni, Hashem Zeeinali
出版: (2012) -
Effective preventive maintenance planning procedures for continuously operating power generation equipment and systems
由: Ali Hassan, Ibrahim Moallim
出版: (1995)