A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province

Construction industry plays a major role in improving the socio-economic growth of any country. However, this industry is facing a serious problem of cost overrun globally and particular in Pakistan. Rapid growth in the construction sector in Pakistan has been observed along with many challenges, es...

Full description

Saved in:
Bibliographic Details
Main Author: Sohu, Samiullah
Format: Thesis
Language:English
English
English
Published: 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/257/1/24p%20SAMIULLAH%20SOHU.pdf
http://eprints.uthm.edu.my/257/2/SAMIULLAH%20SOHU%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/257/3/SAMIULLAH%20SOHU%20WATERMARK.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uthm-ep.257
record_format uketd_dc
spelling my-uthm-ep.2572021-07-15T00:44:45Z A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province 2018-11 Sohu, Samiullah TD194-195 Environmental effects of industries and plants Construction industry plays a major role in improving the socio-economic growth of any country. However, this industry is facing a serious problem of cost overrun globally and particular in Pakistan. Rapid growth in the construction sector in Pakistan has been observed along with many challenges, especially in highway projects. The most critical issues in highway projects are the cost overrun and lack of their mitigation measures. Hence, the objective of this research is to determine the critical factors of cost overrun, its significant mitigation measures and to develop a structural model of significant mitigation measures for critical cost overrun factors. The preliminary survey helped in identifying the critical factors of cost overrun in highway projects. In total, 64 common factors for cost overrun were identified from the literature review. Based on the common factors, a questionnaire was designed and distributed among the 30 selected experts to determine the critical factors of cost overrun. Out of 64 common factors, 24 were reported critical. The pilot study was carried out by developing a semi-structured questionnaire which was distributed among the same 30 construction experts for the purpose of determining the mitigation measures, which resulted in 113 measures. These mitigation measures along with the relevant 24 factors helped in the development of the final questionnaire to further narrow down the significant measures. This finalized questionnaire was distributed among 350 construction experts of highway projects to identify the significant mitigation measures for critical factors of cost overrun. The collected data was further used to develop a structural model for mitigation measures of critical factors of cost overrun by Smart PLS. Performance of the model has moderate explaining power as the predictive relevancy value is greater than 0.13. Significant mitigation measures of these critical factors were determined from the power loading of mitigations measures. This research would be helpful for construction managers in mitigating the relative risk to the project. Thus, it will directly benefit the construction community and contribute in raising the economy of the country. 2018-11 Thesis http://eprints.uthm.edu.my/257/ http://eprints.uthm.edu.my/257/1/24p%20SAMIULLAH%20SOHU.pdf text en public http://eprints.uthm.edu.my/257/2/SAMIULLAH%20SOHU%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/257/3/SAMIULLAH%20SOHU%20WATERMARK.pdf text en validuser phd doctoral Universiti Tun Hussein Onn Malaysia Fakulti Kejuruteraan Awam dan Alam Bina
institution Universiti Tun Hussein Onn Malaysia
collection UTHM Institutional Repository
language English
English
English
topic TD194-195 Environmental effects of industries and plants
spellingShingle TD194-195 Environmental effects of industries and plants
Sohu, Samiullah
A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
description Construction industry plays a major role in improving the socio-economic growth of any country. However, this industry is facing a serious problem of cost overrun globally and particular in Pakistan. Rapid growth in the construction sector in Pakistan has been observed along with many challenges, especially in highway projects. The most critical issues in highway projects are the cost overrun and lack of their mitigation measures. Hence, the objective of this research is to determine the critical factors of cost overrun, its significant mitigation measures and to develop a structural model of significant mitigation measures for critical cost overrun factors. The preliminary survey helped in identifying the critical factors of cost overrun in highway projects. In total, 64 common factors for cost overrun were identified from the literature review. Based on the common factors, a questionnaire was designed and distributed among the 30 selected experts to determine the critical factors of cost overrun. Out of 64 common factors, 24 were reported critical. The pilot study was carried out by developing a semi-structured questionnaire which was distributed among the same 30 construction experts for the purpose of determining the mitigation measures, which resulted in 113 measures. These mitigation measures along with the relevant 24 factors helped in the development of the final questionnaire to further narrow down the significant measures. This finalized questionnaire was distributed among 350 construction experts of highway projects to identify the significant mitigation measures for critical factors of cost overrun. The collected data was further used to develop a structural model for mitigation measures of critical factors of cost overrun by Smart PLS. Performance of the model has moderate explaining power as the predictive relevancy value is greater than 0.13. Significant mitigation measures of these critical factors were determined from the power loading of mitigations measures. This research would be helpful for construction managers in mitigating the relative risk to the project. Thus, it will directly benefit the construction community and contribute in raising the economy of the country.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Sohu, Samiullah
author_facet Sohu, Samiullah
author_sort Sohu, Samiullah
title A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
title_short A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
title_full A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
title_fullStr A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
title_full_unstemmed A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
title_sort structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
granting_institution Universiti Tun Hussein Onn Malaysia
granting_department Fakulti Kejuruteraan Awam dan Alam Bina
publishDate 2018
url http://eprints.uthm.edu.my/257/1/24p%20SAMIULLAH%20SOHU.pdf
http://eprints.uthm.edu.my/257/2/SAMIULLAH%20SOHU%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/257/3/SAMIULLAH%20SOHU%20WATERMARK.pdf
_version_ 1747830566357565440