Bottleneck-based heuristic for three-machine flow shop scheduling

This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Rahim, Mohd Salleh
Format: Thesis
Language:English
English
English
Published: 2011
Subjects:
Online Access:http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf
http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uthm-ep.2724
record_format uketd_dc
spelling my-uthm-ep.27242021-11-01T06:12:42Z Bottleneck-based heuristic for three-machine flow shop scheduling 2011-05 Abdul Rahim, Mohd Salleh TS Manufactures TS155-194 Production management. Operations management This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respectively. The heuristics have successfully produced 67.24% of optimum solution at the middle process or M2 and 90.80% at the last process or M3 for 6 jobs problem. While for 10 jobs problem, the heuristics can produce 14.64% at M2 and 90.98% at M3. As an extension of this study, the bottleneck based heuristic scope is enlarged by developing a new heuristic for dominant machine at M1 and combining it with the previously developed heuristics for dominant machine at M2 and M3. The main objective is to develop scheduling heuristic to evaluate the performance at M1 based on bottleneck analysis for M1M2M3 flow shop and to combine with the developed heuristics from previous studies. The computer program involved were Microsoft Excel and Visual Basic for Applications (VBA) and the test of performance were conducted at 6 and 10 jobs problem. A simulated random data within specific limitation being assigned at each job’s processing time produces new recommended job arrangements. The generated makespan was compared with optimum makespan from complete enumeration and lower bound (LB) analysis. Total sets of 1000 simulated data at 6 and 10 jobs were allocated into 3 dominance level of P1DL; weak, medium, and strong. Optimal solutions were obtained based on the total results data that produce the ratio of 1. Based on the results, 62.40% of the solution generated is optimum result for 6 jobs while 56.33% of the solution generated equals to lower bound for 10 jobs. The heuristic performed moderately and decreased slightly when number of jobs increased, showing that BMM1 heuristic is more suitable for lesser number of jobs. 2011-05 Thesis http://eprints.uthm.edu.my/2724/ http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf text en public http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf text en validuser mphil masters Universiti Tun Hussein Malaysia Fakulti Kejuruteraan Mekanikal dan Pembuatan
institution Universiti Tun Hussein Onn Malaysia
collection UTHM Institutional Repository
language English
English
English
topic TS Manufactures
TS Manufactures
spellingShingle TS Manufactures
TS Manufactures
Abdul Rahim, Mohd Salleh
Bottleneck-based heuristic for three-machine flow shop scheduling
description This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respectively. The heuristics have successfully produced 67.24% of optimum solution at the middle process or M2 and 90.80% at the last process or M3 for 6 jobs problem. While for 10 jobs problem, the heuristics can produce 14.64% at M2 and 90.98% at M3. As an extension of this study, the bottleneck based heuristic scope is enlarged by developing a new heuristic for dominant machine at M1 and combining it with the previously developed heuristics for dominant machine at M2 and M3. The main objective is to develop scheduling heuristic to evaluate the performance at M1 based on bottleneck analysis for M1M2M3 flow shop and to combine with the developed heuristics from previous studies. The computer program involved were Microsoft Excel and Visual Basic for Applications (VBA) and the test of performance were conducted at 6 and 10 jobs problem. A simulated random data within specific limitation being assigned at each job’s processing time produces new recommended job arrangements. The generated makespan was compared with optimum makespan from complete enumeration and lower bound (LB) analysis. Total sets of 1000 simulated data at 6 and 10 jobs were allocated into 3 dominance level of P1DL; weak, medium, and strong. Optimal solutions were obtained based on the total results data that produce the ratio of 1. Based on the results, 62.40% of the solution generated is optimum result for 6 jobs while 56.33% of the solution generated equals to lower bound for 10 jobs. The heuristic performed moderately and decreased slightly when number of jobs increased, showing that BMM1 heuristic is more suitable for lesser number of jobs.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Abdul Rahim, Mohd Salleh
author_facet Abdul Rahim, Mohd Salleh
author_sort Abdul Rahim, Mohd Salleh
title Bottleneck-based heuristic for three-machine flow shop scheduling
title_short Bottleneck-based heuristic for three-machine flow shop scheduling
title_full Bottleneck-based heuristic for three-machine flow shop scheduling
title_fullStr Bottleneck-based heuristic for three-machine flow shop scheduling
title_full_unstemmed Bottleneck-based heuristic for three-machine flow shop scheduling
title_sort bottleneck-based heuristic for three-machine flow shop scheduling
granting_institution Universiti Tun Hussein Malaysia
granting_department Fakulti Kejuruteraan Mekanikal dan Pembuatan
publishDate 2011
url http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf
http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf
_version_ 1747830979546841088