Bottleneck-based heuristic for three-machine flow shop scheduling
This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...
محفوظ في:
المؤلف الرئيسي: | Abdul Rahim, Mohd Salleh |
---|---|
التنسيق: | أطروحة |
اللغة: | English English English |
منشور في: |
2011
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
بواسطة: Sh Ahmad, Sh Salleh
منشور في: (2009) -
Job shop scheduling problem (JSSP)
بواسطة: Abdullah, Nurul Azma
منشور في: (2004) -
Machining feature-based system for supporting step-compliant milling process
بواسطة: Chen, Wong Keong
منشور في: (2017) -
Solving a multi-objective job shop scheduling problem using a hybrid genetic algorithm
بواسطة: Piroozfard, Hamed
منشور في: (2013) -
A three-stage methodology for design evaluation in product development
بواسطة: Mohd Turan, Faiz
منشور في: (2013)