Bottleneck-based heuristic for three-machine flow shop scheduling
This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...