Measures for mitigating the delay in high-rise building construction projects in Dubai
Construction industry faces several challenges such as low labour productivity, cost overrun, time overrun, and extreme weather condition. Globally, the most severe challenge is project delay, particularly in Dubai where the construction industry is booming rapidly than other parts of the world, esp...
محفوظ في:
المؤلف الرئيسي: | Bhatti, Imtiaz Ali |
---|---|
التنسيق: | أطروحة |
اللغة: | English English English |
منشور في: |
2019
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.uthm.edu.my/519/1/24p%20IMTIAZ%20ALI%20BHATTI.pdf http://eprints.uthm.edu.my/519/2/IMTIAZ%20ALI%20BHATTI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/519/3/IMTIAZ%20ALI%20BHATTI%20WATERMARK.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Lateral stability of high-rise building
بواسطة: Gan, Ming Ong
منشور في: (2005) -
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
بواسطة: Ullah, Kaleem
منشور في: (2018) -
The delay for high rise building in Malaysia /
بواسطة: Zarith Naquiah Zahari
منشور في: (2017) -
Recovery plan strategy on the delay construction project
بواسطة: Ku Ismail, Ku Adenan
منشور في: (2004) -
Strategies for managing delay in Mara's building construction
بواسطة: Sulaiman, Khairunnizam
منشور في: (2010)