Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer

Industrialised Building System (IBS) or prefabrication has been identified as one of the key methods to reduce construction cost and gain financial benefits. The characteristic of controlled production and systematic process in the IBS manufacturing is helpful in quality production and profit genera...

Full description

Saved in:
Bibliographic Details
Main Author: Tajul Ariffin, Syazwana
Format: Thesis
Language:English
English
English
Published: 2019
Subjects:
Online Access:http://eprints.uthm.edu.my/674/1/24p%20SYAZWANA%20TAJUL%20ARIFFIN.pdf
http://eprints.uthm.edu.my/674/2/SYAZWANA%20TAJUL%20ARIFFIN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/674/3/SYAZWANA%20TAJUL%20ARIFFIN%20WATERMARK.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uthm-ep.674
record_format uketd_dc
spelling my-uthm-ep.6742021-08-19T05:57:35Z Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer 2019-03 Tajul Ariffin, Syazwana TS155-194 Production management. Operations management Industrialised Building System (IBS) or prefabrication has been identified as one of the key methods to reduce construction cost and gain financial benefits. The characteristic of controlled production and systematic process in the IBS manufacturing is helpful in quality production and profit generation. A structured financial guideline can assist IBS manufacturers to maximise the production of IBS components and gain competitive advantage. The economy of scale (EOS) is one of the available strategies for IBS manufacturers to reduce average cost and increase the level of production. However, many IBS manufacturers fail due to lack of understanding in EOS and limited of study in Malaysia. Therefore, this study has noted a gap of knowledge to examine the EOS for IBS manufacturers. This study aims to establish the EOS factors for precast manufacturers using quantitative method. In the first phase, a systematic literature review and interviews were used to assist and validate the collected factors. In the second phase, the questionnaire survey was conducted to collect data from the precast manufacturers. In the light of findings, 10 factors were noted significant and were further categorised into internal and external factors. The internal factors of EOS were technical, financial, labour, managerial, marketing, commerce, and core competence. While the external factors of precast manufacturers consist of risk bearing, external industry, and infrastructure factors. IBS manufacturers can use this study as a reference to assess the possibilities of their business expansion. The good combination of production factors (as can be referred to the framework of EOS factors for precast manufacturer) and existing mass production can effectively distribute the fixed cost and lead to economical production. In addition, the developed framework can assist the manufacturers in the development of planning and organising the operational process to sustain their business for a long period of time. 2019-03 Thesis http://eprints.uthm.edu.my/674/ http://eprints.uthm.edu.my/674/1/24p%20SYAZWANA%20TAJUL%20ARIFFIN.pdf text en public http://eprints.uthm.edu.my/674/2/SYAZWANA%20TAJUL%20ARIFFIN%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/674/3/SYAZWANA%20TAJUL%20ARIFFIN%20WATERMARK.pdf text en validuser mphil masters Universiti Tun Hussein Onn Malaysia Fakulti Kejuruteraan Awam dan Alam Bina
institution Universiti Tun Hussein Onn Malaysia
collection UTHM Institutional Repository
language English
English
English
topic TS155-194 Production management
Operations management
spellingShingle TS155-194 Production management
Operations management
Tajul Ariffin, Syazwana
Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
description Industrialised Building System (IBS) or prefabrication has been identified as one of the key methods to reduce construction cost and gain financial benefits. The characteristic of controlled production and systematic process in the IBS manufacturing is helpful in quality production and profit generation. A structured financial guideline can assist IBS manufacturers to maximise the production of IBS components and gain competitive advantage. The economy of scale (EOS) is one of the available strategies for IBS manufacturers to reduce average cost and increase the level of production. However, many IBS manufacturers fail due to lack of understanding in EOS and limited of study in Malaysia. Therefore, this study has noted a gap of knowledge to examine the EOS for IBS manufacturers. This study aims to establish the EOS factors for precast manufacturers using quantitative method. In the first phase, a systematic literature review and interviews were used to assist and validate the collected factors. In the second phase, the questionnaire survey was conducted to collect data from the precast manufacturers. In the light of findings, 10 factors were noted significant and were further categorised into internal and external factors. The internal factors of EOS were technical, financial, labour, managerial, marketing, commerce, and core competence. While the external factors of precast manufacturers consist of risk bearing, external industry, and infrastructure factors. IBS manufacturers can use this study as a reference to assess the possibilities of their business expansion. The good combination of production factors (as can be referred to the framework of EOS factors for precast manufacturer) and existing mass production can effectively distribute the fixed cost and lead to economical production. In addition, the developed framework can assist the manufacturers in the development of planning and organising the operational process to sustain their business for a long period of time.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Tajul Ariffin, Syazwana
author_facet Tajul Ariffin, Syazwana
author_sort Tajul Ariffin, Syazwana
title Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
title_short Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
title_full Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
title_fullStr Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
title_full_unstemmed Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
title_sort relationship of economies of scale (eos) factors for malaysian industrialised building system (ibs) precast manufacturer
granting_institution Universiti Tun Hussein Onn Malaysia
granting_department Fakulti Kejuruteraan Awam dan Alam Bina
publishDate 2019
url http://eprints.uthm.edu.my/674/1/24p%20SYAZWANA%20TAJUL%20ARIFFIN.pdf
http://eprints.uthm.edu.my/674/2/SYAZWANA%20TAJUL%20ARIFFIN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/674/3/SYAZWANA%20TAJUL%20ARIFFIN%20WATERMARK.pdf
_version_ 1747830659258253312