Dynamic weighted idle time heuristic for flowshop scheduling
The constructive heuristic of Nawaz, Enscore and Ham (NEH) has been introduced in 1983 to solve flowshop scheduling. Many researchers have continued to improve the NEH by adding new steps and procedures to the existing algorithm. Thus, this study has developed a new heuristic known as Dynamic Weight...
Saved in:
主要作者: | Zainudin, Amira Syuhada |
---|---|
格式: | Thesis |
语言: | English English English |
出版: |
2017
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/742/1/24p%20AMIRA%20SYUHADA%20ZAINUDIN.pdf http://eprints.uthm.edu.my/742/2/AMIRA%20SYUHADA%20ZAINUDIN%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/742/3/AMIRA%20SYUHADA%20ZAINUDIN%20%20WATERMARK.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
由: Sidek, Noor Azizah
出版: (2021) -
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
由: Mohd Pauzi, Nur Fazlinda
出版: (2015) -
Heuristics method for truck disassembly process
由: Yeoh, Kim Hao
出版: (2020) -
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
由: Oyekunle, Adeleke Abdullahi
出版: (2022) -
The moderation of smart industry technology on the relationship between supply chain management practices and competitive advantage in the Dubai Electricity and Water Authority
由: Durmohamed, Yousef Abdulrahman Mohamed
出版: (2022)