Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem

The re-entrant flow shop environment has become prominent in the manufacturing industries and has recently attracted researchers attention. Typical examples of re-entrant flow shops are the printed circuit board manufacturing and furniture painting processes where components or processed parts...

Full description

Saved in:
Bibliographic Details
Main Author: Sh Ahmad, Sh Salleh
Format: Thesis
Language:English
English
English
Published: 2009
Subjects:
Online Access:http://eprints.uthm.edu.my/7448/1/24p%20SH%20SALLEH%20SH%20AHMAD.pdf
http://eprints.uthm.edu.my/7448/2/SH%20SALLEH%20SH%20AHMAD%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/7448/3/SH%20SALLEH%20SH%20AHMAD%20WATERMARK.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uthm-ep.7448
record_format uketd_dc
spelling my-uthm-ep.74482022-07-24T03:47:35Z Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem 2009-07 Sh Ahmad, Sh Salleh TS Manufactures TS155-194 Production management. Operations management The re-entrant flow shop environment has become prominent in the manufacturing industries and has recently attracted researchers attention. Typical examples of re-entrant flow shops are the printed circuit board manufacturing and furniture painting processes where components or processed parts enter some specific machines more than once. Similar with other manufacturing environment, identifying appropriate scheduling methodologies to ensure high output rate is very much desirable. The problem explored and investigated in this research is a special type of scheduling problem found in a re-entrant flow shop where two of its processes have high tendency of exhibiting bottleneck characteristics. The scheduling problem resembles a four machine permutation re-entrant flow shop with the routing of M1,M2,M3,M4,M3,M4 where Ml and M4 have high tendency of being the dominant machines. The main objective of this research is to take advantage of the bottleneck characteristics at the re-entrant flow shop and use it to develop heuristics that can be used to solve its scheduling problems. There are four major concentrations in this research. First, basic mathematical properties or conditions that explain the behaviour of the bottleneck processes were developed to give an insight and clearer understanding of the re-entrant flow shop with dominant machines. Second, four new and effective scheduling procedures which were called BAM1 (Bottleneck Adjacent Matching 1), BAM2, BAM3 and BAM4 heuristics were developed. Third, bottleneck approach was utilised in the study and the analysis using Visual Basic macro programming indicated that this method produced good results. Fourth, the Bottleneck Scheduling Performance (BSP) indexes introduced in the BAM heuristics procedure could be used to ascertain that some specific generated job arrangements are the optimum schedule. As a general conclusion, this research has achieved the objectives to develop bottleneck-based makespan algorithms and heuristics applicable for re-entrant flow shop environment. The experimental results demonstrated that the BAM heuristics generated good performances within specific P1 (first process) bottleneck dominance level and when the number of jobs increases. Within the medium to large-sized problems, BAM2 is the best at weak PI dominance level whereas BAM4 is the best at strong P1 dominance level. 2009-07 Thesis http://eprints.uthm.edu.my/7448/ http://eprints.uthm.edu.my/7448/1/24p%20SH%20SALLEH%20SH%20AHMAD.pdf text en public http://eprints.uthm.edu.my/7448/2/SH%20SALLEH%20SH%20AHMAD%20COPYRIGHT%20DECLARATION.pdf text en staffonly http://eprints.uthm.edu.my/7448/3/SH%20SALLEH%20SH%20AHMAD%20WATERMARK.pdf text en validuser phd doctoral Universiti Tun Hussein Onn Malaysia Fakulti Kejuruteraan Mekanikal dan Pembuatan
institution Universiti Tun Hussein Onn Malaysia
collection UTHM Institutional Repository
language English
English
English
topic TS Manufactures
TS Manufactures
spellingShingle TS Manufactures
TS Manufactures
Sh Ahmad, Sh Salleh
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
description The re-entrant flow shop environment has become prominent in the manufacturing industries and has recently attracted researchers attention. Typical examples of re-entrant flow shops are the printed circuit board manufacturing and furniture painting processes where components or processed parts enter some specific machines more than once. Similar with other manufacturing environment, identifying appropriate scheduling methodologies to ensure high output rate is very much desirable. The problem explored and investigated in this research is a special type of scheduling problem found in a re-entrant flow shop where two of its processes have high tendency of exhibiting bottleneck characteristics. The scheduling problem resembles a four machine permutation re-entrant flow shop with the routing of M1,M2,M3,M4,M3,M4 where Ml and M4 have high tendency of being the dominant machines. The main objective of this research is to take advantage of the bottleneck characteristics at the re-entrant flow shop and use it to develop heuristics that can be used to solve its scheduling problems. There are four major concentrations in this research. First, basic mathematical properties or conditions that explain the behaviour of the bottleneck processes were developed to give an insight and clearer understanding of the re-entrant flow shop with dominant machines. Second, four new and effective scheduling procedures which were called BAM1 (Bottleneck Adjacent Matching 1), BAM2, BAM3 and BAM4 heuristics were developed. Third, bottleneck approach was utilised in the study and the analysis using Visual Basic macro programming indicated that this method produced good results. Fourth, the Bottleneck Scheduling Performance (BSP) indexes introduced in the BAM heuristics procedure could be used to ascertain that some specific generated job arrangements are the optimum schedule. As a general conclusion, this research has achieved the objectives to develop bottleneck-based makespan algorithms and heuristics applicable for re-entrant flow shop environment. The experimental results demonstrated that the BAM heuristics generated good performances within specific P1 (first process) bottleneck dominance level and when the number of jobs increases. Within the medium to large-sized problems, BAM2 is the best at weak PI dominance level whereas BAM4 is the best at strong P1 dominance level.
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Sh Ahmad, Sh Salleh
author_facet Sh Ahmad, Sh Salleh
author_sort Sh Ahmad, Sh Salleh
title Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
title_short Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
title_full Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
title_fullStr Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
title_full_unstemmed Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
title_sort bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
granting_institution Universiti Tun Hussein Onn Malaysia
granting_department Fakulti Kejuruteraan Mekanikal dan Pembuatan
publishDate 2009
url http://eprints.uthm.edu.my/7448/1/24p%20SH%20SALLEH%20SH%20AHMAD.pdf
http://eprints.uthm.edu.my/7448/2/SH%20SALLEH%20SH%20AHMAD%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/7448/3/SH%20SALLEH%20SH%20AHMAD%20WATERMARK.pdf
_version_ 1747831152369991680