Sustainable slow maintained pile load test
Slow maintained load test is widely used by contractors in Malaysia to ensure the driven pile could accommodate the design load of the structure. Slow maintained load test is a test to determine load-settlement curve and pile capacity for a period of time using conventional load test. Conventional s...
Saved in:
主要作者: | Abd Aziz, Ameer Nazrin |
---|---|
格式: | Thesis |
语言: | English English English |
出版: |
2018
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/7519/1/24p%20AMEER%20NAZRIN%20ABD%20AZIZ.pdf http://eprints.uthm.edu.my/7519/2/AMEER%20NAZRIN%20ABD%20AZIZ%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/7519/3/AMEER%20NAZRIN%20ABD%20AZIZ%20WATERMARK.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Comparison of ultimate bearing capacity obtained by pile driving analyzer and maintained load test
由: Rajasvaran, Kamalendran N.
出版: (2007) -
Sustainable slow maintained pile load test
由: Abd Aziz, Ameer Nazrin
出版: (2018) -
Static load test - a comparison of ultimate load between statnamic and maintained load test
由: Azmi, Mastura
出版: (2005) -
Interpretation on pile capacity from instrumented sacrifical pile load test for deep foundation system
由: Abdul Razak, Nurul Husna
出版: (2020) -
The interpretation of full scale instrumented load testing and the prediction of settlement for single bored pile
由: Ab. Aziz, Salsabila
出版: (2009)