Bottleneck-based heuristic for permutation flowshop scheduling
The newly heuristic is developed by introducing the bottleneck-based concept that was applied at the beginning of initial solution determination. The heuristic is known as Bottleneck-Based (BNB) heuristic. The previous study found that the scheduling activity become complex when dealing with large n...
Saved in:
Main Author: | Isa, Noor Amira |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/837/1/24p%20NOOR%20AMIRA%20ISA.pdf http://eprints.uthm.edu.my/837/2/NOOR%20AMIRA%20ISA%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/837/3/NOOR%20AMIRA%20ISA%20WATERMARK.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Moufang Loops Of Odd Order p1 p2 ...p n q3
[QA174.2. C548 2007 f rb].
by: Chong, Kam Yoon
Published: (2007) -
Some Optimal Codes And Their Decoding Algorithms
[QA268. T258 2008 f rb].
by: Tee, Chee Ching
Published: (2008) -
A Proposed Method For Selecting The Clustering Algorithm In Radial Basis Function [QA223. A581 2008 f rb].
by: Ang, Sau Loong
Published: (2008) -
Algoritma Subbahagian Dalam Cagd
by: Wan Ramli, Wan Khairiyah Hulaini
Published: (2009) -
On Steiner System S(5, 8, 24) And The Miracle Octad Generator (Mog) [QA164. S623 2004 f rb].
by: Sitt, Chee Keen
Published: (2004)